Loading...
HomeMy WebLinkAboutSDP201000060 Legacy Document 2010-12-30295 e9 C. L. I 4t, A .-9FLOWERING / DOGWOOD / t, �( \ \ // \� (— 'PHASE III � \ s + � � \ � \��� �9'P � �•� iii "� �— II C`� \ \ll \ \� \III \11 \\//!\� \�\ \ \ \ � \ \ ��� ' 2+ \ \ \ �\. \ � � / ., � SARGENTJUNIPER, T O.C. IW—� 0 /IIIIIm111111111�111f � llllll� o \\ a � �� \� \� �� \; � � \ ` \ � o ^o + \ \ \�.: \ — \ \ \ a \ `\ \ \ \ �\ c� F..q 1� O g\%' / EE�D AL RBEa �O \ \ \ •�, �J -- --- //� �\ I' \ \ AREAS WITH INDIAN GRASS. \ ..\ ,,\ / G \ SEEN TE THIS SHEEP \ \ I 3FLOWERIN DOGWOOD C Gee H O ]-1 • \ 38 \.: (, •y \F\ 3 REDBUD 15 NORWAY SPRUCE / \ \ \ \ 1 \ '1 /' 1 1 \ -_..._ \ \ 1 I / \ \ V NOTES 1 \ 1_ 1 1 \ \ \' \ , _ — DRAINAGE BASIN. \ I 1 „. 07 \' SEE GRADING PLAN \ 1. SOW INDIANGRASS (SORGHASTRUM NUTANS) WHERE INDICATED ON DRAWINGS. f SOW AT RATE OF 8 LBS. PER ACRE USING A SEED DRILL OR 15 LBS. PER ACRE IF BROADCAST. ENSURE SEED COMES INTO FULL CONTACT WITH MOIST, FIRM SEED BED BY ROLLING BOTH BEFORE AND AFTER SEEDING. COVER WITH LIGHT STRAW MULCH. DO NOT USE NITROGEN FERTILIZER. 1 , - - \ \ 1 \ \ 1 \i 1 \ 1 •\ \ �\ < / SHADWELL QUARRY PLANT SCHEDULE 7 DGWOO ING \ \ SPRUCE Y \ \ ' 4 REDBUD � \ \ � \ \ �\ \ \\ "(' ~ _ \DOGWOOD \ tSPRUCE \ � � \ PHASE II QTY BOTANICAL NAME COMMON NAME SIZE ROOT TREES - 16 LOBLOLLY PINES I \ + \ �i \ \, \ \, \ \ \\ \\ \ \ \ 1 1 1 1 I 1 1 I — ago 19 Corpus florida Flowering Dogwood 5'- 6' Ht B&B 8 NORWAY SPRUCE 27 Picea abies Norway Spruce 6' - 8' Ht. 27 B & B \ \\ \ \\ \ \\ \ \ \ \ \\ � \ �\�� PLANTING 16 Pinus taeda ' Loblolly Pine 6' - 8' Ht 7 Cercis canadensis Redbud 5 - 6' Ht B&B B&B \\ \\ � \\ \� ��\ \ \ \ \ \ \ \ 1 \ \ � \ \ 410 + \ \ PLAN E ALL DISTURB SHRUBS 11 Juniperus chinensis var. sar entil Saf ents Juniper 12" Cont AREAS WITH INDIAN GRASS. \ \ \ \ \ 1 I EE NOTE THI SHEET. pring B\ Sox\ \ \\ 430 _ VAN YAHRES ASSOCIATES CAMPUS PLANNING SITE DESIGN �o • ! /�.. 800 E. HIGH ST. CHARLOTTESVILLE. VIRGINIA 22902 434295.4734 (PAX1434296.6864 >:- JL.:w1i:FiiQ� anyahre s. eom ,,,,,11 /� and Y4��}('("`i} -i�,� by the D— Br. GDS Checked 8} ^. SK C rRevlesr�u y� C r ifpunil '. f,.,�5:`i�'e��i� e..nt Depart�:1'� ��t � - � Date 1 �- m NOT STAKE TREES OR WRAP TWO STRANDS 10 GA. RUBBER HOSE PROVIDE ER AROUND PERIMET ER WHE RE SHRUBS ARE PLANTED INDIVIDUALLY PLANT SHRUBS WITH I/4 OF ROOT BALL ABOVE GRADE Dc 12.01.2010 RndvonDO Fiie# ��b� B m m o D TRUNKS UNLESS APPROVED BY LANDSCAPE ARCHITECT GALVANIZED WIRE, TWISTED TOGETHER RAISE TREE SO THAT ONE 3" MULCH DIG CONTINUOUS TRENCH WHEN - RAISE TREE SO THAT ONE FOURTH OF ROOT BALL IS ABOVE FINISHED GRADE 2^ X 3" HARDWOOD STAKES FOURTH OF ROOT BALL IS ABOVE FINISHED GRADE (3 PER TREE). DRIVE STAKES PLANTING SHRUBS IN ROWS PROVIDE 8" WIDE X 6" DEEP _ - r.�,. 1 ( 3" SHREDDED PINE BARK MULCH MIN. 18" INTO UNDISTURBED SOIL SHREDDED PINE BARK MULCH ` TRENCH AROUND PERIMETER OF SHRUB BEDS THAT ARE NOT ;r . V, s.i _L. ; y FINISHED GRADE FI NISHED GRADE FINISHED ROOT BALL. CUT ALL N Y HARD APE ED BOUNDED B SC - PREPARED PLANTING SOIL PROTRUDING ROOTS ':' ORIGINAL GRADE CLEANLY WITH SHARP :, -: � .. L III —. III III '- APPROVED BACKFILL f ; ' ROOT BALL. CUT ALL PRUNING SHEARS t PREPARED PLANTING SOIL III 111 = ,III- REMOVE ALL TWINE AND BURLAP I TREE PIT I PROTRUDING ROOTS CLEANLY WITH SHARP REPLANT TREES IMMEDIATELY TREE PITT PLACE BALL ON COMPACTED SOIL 2 EXISTING SOIL PLACE ROOT BALL ON FROM TOP 1/3 OF BALL 2 X ROOTBALL PRUNING. SHEARS AFTER EXCAVATION X ROOT BALL UNDISTURBED SOIL PLACE BALL ON UNDISTURBED SOIL Scalc: 1" = 20' DECIDUOUS TREE PLANTING DETAIL EVERGREEN TREE PLANTING DETAIL SHRUB PLANTING DETAIL SCALE: NTS SCALE:NTS SCALE: NTS