Loading...
HomeMy WebLinkAboutARB201100012 Legacy Document 2011-04-19 (2)I �\ I I o ❑ " - -/ 0 / b------- - - - - -� — -- -r' - -- \ / / s I I I � J � K' 2 PJP SIGN- SITE PLAN PJP SCALE: 1/32 " = 1' -0" PETER JEFFERSON PARKWAY BOXWOOD HEDGE PLANTING, 36'' HEIGHT 3 AMELANCHIER SP., SINGLE STEM 12' O.C., 6' TALL INSTALLED PROPOSED SIGN GROUNDCOVER WITH BULB PLANTINGS STREET SIGN TRAFFIC POLE EXISTING STONE WALL AND PIER PROPOSED PJP SIGN LOCATION PJP AND PLANTING UTILITY VAULTS REMOVE EXISTING MAPLE STREET SIGN RT. 250 EAST TRIM BACK EXISTING OVERGROWTH TO OPEN SIGHT LINES: MINIMAL PRUNING WILL TAKE PLACE, ONLY TO REMOVE INVASIVE SPECIES AND TO CLEAR A SIGHT LINE TO THE SIGN APPROACHING THE INTERSECTION FROM THE EAST (SEE ATTACHMENT 'B' AS BEST EXAMPLE) WITHIN THE LOWER LIMBS AND GROUND PLANE; PRUNING WILL NOT CHANGE THE CHARACTER OF THE PROPERTY NELSON BYRD:: W O LTZ LANDSCAPE ARCHITECTS 408 Park Street Charlottesville Virginia, 22902 T 434.984.1358 F 434.984.4158 www.nbwIa.com PJP SIGN PROPOSED PLANTING DATE: 04.15.201 1 SCALE: AS NOTED NORTH: