HomeMy WebLinkAboutZMA201000009 Proffers Zoning Map Amendment 2011-03-28Republic Capital
Proffers
March 28, 2011
2. We hereby proffer a restriction of the types of uses of the property for that portion
of the property designated as HI, Heavy Industrial. The uses that will be
prohibited on the property would include the following: brick manufacturing;
concrete mixing plants; manufacturing of sewage disposal systems;
manufacturing and recycling of tires; petroleum, gasoline, natural gas and
manufactured gas storage; sawmills; wood preserving operations.
Cite by section number the restricted uses. Suggested language is provided
below:
The uses of the Property permitted by right shall be all those uses allowed by
right under Section 27.2.1 of Chapter 18, Zoning, of the Albemarle County
Code, as that section is in effect on [date of rezoning action], 2011, a copy of
which is attached hereto and incorporated herein as Attachment A, except
for:
a) Assembly and fabrication of light aircraft from component parts
manufactured off -site (Section 27.2.1(8)).
b)
C)
d)
4. In the way of road improvements, we proffer to limit development of the property
to not exceed the capacity of the Northside Drive until such time as the road is
improved to accommodate the additional traffic generated by the added
development of this rezoning. The capacity of Northside Drive is that
capacity which will accommodate the traffic from the contiguous properties if
fully developed under the existing zoning.
This proffer is unclear regarding who makes the determination of capacity
or what the threshold of capacity is, and who is responsible for making the
road improvements. In addition, the capacity on the intersection with Route
29 is not mentioned in the proffer. It may be more critical to analyze the
intersections on Route 29 used to access the property to ensure there is
adequate capacity and turning movement treatments. Intersections adjacent
to Northside Drive will be used for access because of the lack of a crossover
on Route 29 at Northside Drive. Therefore, the proffer should address
specific road improvements proposed for Northside Drive and state when
those improvements would be made (i.e. prior to the first site plan or
subdivision approval).
5. We will expand the undisturbed buffer area from the required 30 foot width to a
50 foot width along the boundary line abutting the lots of Airport Acres. We
will provide a 4 foot high berm with 4 feet to 6 feet high evergreen trees and
shrubs planted 15 feet on center. Total setback distance from the boundary
line abutting Airport Acres will be 75 feet.
The proffer needs to specify when the buffer will be expanded, such as in
conjunction with the first site plan. Also the length and location of the
buffer (i.e. in the 30 foot buffer required by the ordinance or somewhere in the
expanded 50 foot buffer) needs to be specified. Plant species should also be
specified.
6. The exterior architectural styling of the buildings shall be consistent throughout
the development . All building facades facing residential zoned land shall
havebrick, stucco, textured concrete or masonry facing finished in neutral
earth tones.For the sides of buildings facing residential zoned land that are not
visible from the Entrance Corridor, the style, color, and materials shall be
subject to Design Planner approval with the building permit.
7. There shall be no domed parking or loading within 150 feet of the boundary
line abutting Airport Acres on the south side of any building whieh is itself
leea4ed wit-hin 150 feet of the boundary line.
The Planning Commission requested that there also be no loading in the 150 foot
zone, and this proffer as written would permit travelways and loading spaces,
including pavement to allow truck turning movements within 150 feet of Airport
Acres. To address the Planning Commission's requests, suggested changes to the
proffer are proposed above.
8. If the Applicant's final site plans do not include a road connection to the future
extension of Lewis and Clark Drive, then upon the request of Albemarle
County, Virginia for the purpose of the connection of Northside Drive to the
future extension of Lewis and Clark Drive, the Owner shall dedicate to the
County a right of way consisting of a 25 foot strip of land along the boundary
line between this property and Tax Map 32 parcel 22C5. If the County does
not request that the land be dedicated within 25 years after the date these
proffers are accepted, the proffer is extinguished.
This proffer meets the condition approved by the Planning Commission; however,
the County Engineer and VDOT have determined that the dedication of a 25 foot
strip of land along the boundary line with 32 -22C5 would not be adequate to build
a road connection to a future extension of Lewis and Clark Drive. The problems
would include the additional 25 foot dedication on the Hall property, and the
ability to have a road connection that would meet a design standard given that the
two angle breaks on the property line would not accommodate the curvature of a
road. Also, where the property line connects to Northside Drive, the skew of the
intersection appears to be too large. The plan also does not have enough
information to determine if the connection point at the back of the property is
constructible. Therefore, staff would not be able to advise the Board of Supervisors
that the second portion of this proffer has any tangible value to the County.
In addition, the language for this proffer needs to be revised to meet County
standards. Language for a similar proffer recently approved by the Board of
Supervisors is provided below for your information:
Future North Free State Connector Extension Road. The Owner shall dedicate a
one hundred (100) foot strip of land along the Property boundary with the Norfolk
Southern Railroad as shown on Exhibit 2c and labeled "100' Reserved Road
ROW "for dedication upon demand by the county for the purpose of constructing a
road that extends the North Free State Connector Road northward across the
Rivanna River. The Owner shall dedicate right -of -way within six (6) months
following written notice of demand by the County. Such reservation shall remain
in place through December 31, 2025. The County must accept the dedication
within twelve (12) months following its demand for. Should this road be removed
from the Albemarle County Comprehensive Plan, said reservation shall become
null and void, and the Owner or Successors shall retain fee simple ownership of
the parcel.
A4+Ac*vYw.W-d
ZMIA -87 -19
Proffers Amendment
October 8, 2014
Original Proffers and Proposed Amendments
Proffers Approved
February 17, 1988
Rezoning approximately 25.6 acres from R -1 Residential, to HIILI heavyfLight
[ndustriai. Tax Map 32, Parcel 22.
January 19. 1988 _ Approved Proffer Letter
Amendments proposed — strikeouts indicate proffer to be removed, bold indicates proffer
to be added
] . In order to provide a tangible incentive for the extension of public sewer to this
industrial property, but in recognition of the lack of same currently, we hereby proffer
that prior to the installation of public sewer the uses that wit! be allowed will be those
that do not require public sewer and wltich can be served by domestic septic fields.
Furthermore, the buildings which will be constructed will have less than a total of
225,000 square feet, until such public sewer is available.
2. We hereby proffer a restriction of the types of uses of the property for that portion
of the property which will be designated HI. The uses that will be prohibited on the
property would include the following: brick manufacturing; concrete mixing plants;
manufacturing of sewage disposal systems; manufacturing and recycling of tires;
petroleum, gasoline, natural gas and manufactured gas storage; sawmills; wood
preserving operations.
3. We agree to restrict the uses of the 9 acres of Parcel 32 -22C which is already
zoned HI in the same way as provided in Section 2 above.
4. We proffer to restrict the development of the property to the general outline of the
master plan which has been submitted as part of this rezoning application.
5. In the way of marl improvements, we proffer to limit development of the property
to not exceed the capacity of the access road until such time as the road is improved to
accommodate the additional traffic generated by the added development of this rezoning.
The capacity of the access road is that capacity which will accommodate the traffic
the contiguous properties if fully developed under the existing zoning.
G. We will expand the undisturbed buffer area froia the required 30' to a 50' width
along the lot line which abuts the lots of Airport Acres. We will provide a 4' high berm
planted wills d' to b' high evergreen frees wtd shrubs planted 15' on center (refer to
Attachment C
Artachme►rt Af . Total distance from lire property line slurred with Airport Acres to any
travelway, parking lot or building will measure 75.'
7:-- ? Flo -}1e itm-ekhe buildings ifl he within 4- aCre-l►uf€er- wnegm4fteem tl3e
leis of Aa.pea -Aeres.
Nov e fiber 20. 1987 Prpffcr Lte cr
Amendments proposed - strikeouts indicate puffer to be removed, hold indicates proffer
to be added
7. We 1611 -ie ili@ments stated in the ordinanee- kw-afty
dimorbed arensAvithin- -W-€cv of ;�" in :.-per; nCFeS:
Fit &k�l'i 8 7ltj+-8 - "L-urea �
QFY A-i�IFEi- t$�I3e -$ B {l,° edge of the building
provide ade�ate stmt- drai�ra a eei - fef-that -see ie a itepeft7 anting
ef b-.,- will be done in a Fnarmer to +W.U4aR".s4ar
as is f�asibl&#lte -gIwLe t i%e .'tea
aei�c+r oed:
Decem er 2. 1r387 Proffer letter
Amendments proposed - strikeouts indicate proffer to be removed, bold indicates prq&r
to he added
H. . The exterior architectural sty ling of the buildings will be reasonahIy consistent
throughout the project. The buildings will be substantially masonry or concrete wa11
construction with brick, stucco, textured concrete or masonry facades, finished in natural
earth tones on all building sides, facing residential zoned land. Sttaemte•tiei- ,4t"ha I not
f o -ems Acres
b 4 -r •2-5- feet- Building designs shall he reviewed in schematic fashion
with t }te Planning Staff for their comments prior to construction.
Attachment C
1
it
t
L2 .
I _ -
' r �
r _ �
A 1
Attachment C
Attachment C
y�� jdrVIC
Stt'
i
I
i
' �,�.�, �, i {� �,kGk� wlif�f 9�•�1
l . �•- . \�;��
°�
f ,Iot
sF 4i
I S 1� c�
1?
-2re• %{Try %,nRZel
27C•!da= 1
�_� _...._ t_ '. �' . �tP►w.�n�Fr�
�'�
�
= -
�IS
r ` I � [ i
�wr!NkrE1`
-)
mot" 7.vaEFr r E rs :� ?rr?f�? •
7 � � '-•.�
_ I S5'
� p`El+�tPgi�'
.y
�HPY'T�j�rl,r�i7
Attachment C