Loading...
HomeMy WebLinkAboutSP200800056 Action Letter BOS 2010-11-03OF ALA, a r � �'1RGINZP COUNTY. OF.ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 12, 2010 Dominion Engineering c/o Neal Wright 172 South Pantops Drive Charlottesville, VA 22911 RE: SP200800056 Unity Church TMP 06100 -00 -00 -00400 Dear Mr. Wright: On November 3,.2010, the Albemarle County Board of Supervisors took action on SP #200800056 to add 54 parking spaces to provide additional parking for church services on Tax Map 61, Parcel 4 in the Jack Jouett District. This special use permit was approved based on the following conditions: 1. The church sanctuary shall not exceed two hundred fifty (250) seats; 2. The site shall be developed in general accord with the Conceptual Plan entitled "Application Plan for Unity Church," Revision 4, prepared by Dominion Engineering, and dated August 19, 2010 (hereinafter, the "Conceptual Plan "), and with the Architectural Review Board action of February 16, 2010, as determined by the Director of Planning and the Zoning Administrator. To be in accord with the Conceptual Plan, development shall reflect the following major elements within the development essential to the design of the development: • Number of parking spaces and location of parking areas; and Paving materials, as approved by the County Engineer; and Location of proposed facilities, including the pergola, labyrinth, and playground as shown on the Conceptual Plan. Minor modifications to the Plan which do not conflict with the elements above may be made to ensure compliance with the Zoning Ordinance; 3. All outdoor lighting shall be only full cut -off fixtures and shielded to reflect light away from all abutting properties. A lighting plan limiting light levels at all property lines to no greater than 0.3 foot - candles shall be submitted to the Zoning Administrator or their designee for approval; 4.. The lawful physical construction of the parking areas, pergola, playground, and labyrinth as shown on the Conceptual Plan referenced in Condition 2 above shall commence by November 3, 2015 or the approval of the parking areas, pergola, playground, and labyrinth as shown on the Conceptual Plan shall expire and a new or amended special use permit shall be required for the parking areas to be expanded beyond the eighty -four (84) spaces as shown on SDP - 2005 - 00046, as amended by SDP - 2006 - 00077, and for construction of the pergola, playground, and labyrinth; 5. Expansion of the church and /or establishment of a daycare or provision of afterschool care shall require approval of an additional Special Use Permit; 6. Approval of the Public Health Department shall be required prior to site plan approval; 7. The applicants shall provide plantings to the satisfaction of the Architectural Review Board; 8. The property may not be further divided; and 9. There shall be no more than one (1) residential dwelling on the property. Please be advised that although the Albemarle County Board of Supervisors took.action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with conditions of the SPECIAL USE PERMIT; • approval of and compliance with a SITE PLAN amendment; and • approval of a ZONING COMPLIANCE. CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above -noted action, please do not hesitate to contact Ron Higgins at 296 -5832. Sincerely, U� wlk� V. Wayne Cilimberg Director of Planning CC: Unity Church of Charlottesville 2825 Hydraulic Road Charlottesville VA 22901 Email CC: Elise Hackett, GDS Johnathan Newberry, Zoning