PROFFER STATEMENT
ZMA No 2010 -00003 Morey Creek Professional Center
Tax Map and Parcel Number(s): Tax Map and Parcel Numbers 07600- 00- 00 -012AO & 07600- 00- 00- 012G0.
Owner(s) of Record: University of Virginia Health Services Foundation
Date of Proffer Signature: _17 February 2011
12.009 acres to be rezoned from PRD (Planned Residential Development) to PD -MC (Planned District — Mixed
Commercial) in accordance with the Application Plan dated March 15, 2010, and last revised on January 180'
2011 (the "Application Plan ").
University of Virginia Health Services Foundation, is the owner (the "Owner ") of Tax Map and Parcel Numbers
07600- 00- 00 -012AO & 07600- 00- 00 -012GO (the "Property ") which is the subject of rezoning application ZMA
No. 2010- 00003, a project !mown as "Morey Creek Professional Center" (the "Project ").
Pursuant to Section 33.3 of the Albemarle County Zoning Ordinance, the Owner hereby voluntarily proffers the
conditions listed below which shall be applied to the Property if it is rezoned to the zoning district identified
above. These conditions are proffered as a part of the requested rezoning and the Owner acknowledges that the
conditions are reasonable.
The Owner shall construct, at its expense, an off -site asphalt -paved pedestrian walkway and other
improvements in accordance with standards for such walkways of the Virginia Department of
Transportation (VDOT), as specified in the VDOT Road Design Manual, from the southeast corner of
the site within the existing public right -of -way along the north side of Fontaine Avenue to the Fontaine
Business Park intersection as shown on Sheet C2.0 Pedestrian Pathway and Offsite Waterline of the
Application Plan. The walkway and other improvements shall be completed prior to the issuance of the
certificate of occupancy for the office building.
2. The Owner shall design and construct a pedestrian/bicycle bridge crossing Morey Creek, as shown on
the Application Plan, to a standard approved by the County Engineer, and it is to be a fully engineered
clear span bridge, similar to the "Connector" bridge as manufactured by the Steadfast Bridge Company
(1- 800 -749 -7515) or an equivalent bridge approved by the County Engineer. The bridge shall be
designed and constructed above the 100 -year flood plain. The bridge shall be completed, as reasonably
determined by the County Engineer, prior to the issuance of the certificate of occupancy permit for the
office building.
3. The Owner shall provide a loading space for the JAUNT bus to a standard approved by the County
Engineer, in consultation with Charlottesville Area Transit (CAT), JAUNT, and/or VDOT. Space may
be provided on the main entrance road or on the parking deck as determined by the Owner at the time of
site plan approval. The JAUNT loading space shall be completed, as reasonably determined by the
County Engineer, prior to the issuance of the certificate of occupancy for the office building.
4. The Owner at its expense shall design, bond and construct the following transportation improvements:
ATTACHMENT F
A. A traffic signal at the Fontaine Avenue/US 29 Northbound Ramp intersection. The signal shall
be constructed upon approval of VDOT and in accordance with current VDOT standards. The
traffic signal shall be installed and operational within six (6) months after VDOT approves the
signal design, and not later than twelve (12) months after the County and VDOT request the
installation of the signal.
B. An eastbound right turn lane within the public right -of -way on Fontaine Avenue at the US 29
Southbound Ramp intersection as shown on "Morey Creek Professional Center and Fontaine
Research Park improvements" (Attachment A). The right turn lane shall be designed and
constructed in accordance with current VDOT standards. Construction of the right turn lane
shall be completed not later than twelve (12) months after the County and VDOT request
construction of the right turn lane.
C. A traffic signal and additional lanes at the Fontaine Avenue / U.S. Routs 29 Bypass Southbound
Ramps intersection, as shown on the drawing entitled "Morey Creek Professional Center and
Fontaine Research Park Improvements" prepared by the Timmons Group (Attachment A),
according to one of the two options below to be approved by VDOT at the time of signal design
and construction. The traffic signal shall be installed and operational and construction of the
additional lanes shall be completed within six (6) months after VDOT approves the signal
design, and not later than twelve (12) months after the County and VDOT request the
installation of the signal.
Construct an additional westbound lane on Fontaine Avenue from the northwestern corner
of the northbound ramps intersection to the southbound ramps intersection to provide a
shared through and left-turn lane. Restripe the existing westbound lane as an exclusive left -
turn lane to provide dual left -turn movements onto the southbound ramp. Both lanes shall
provide full -width storage between the northbound and southbound ramps intersections.
Widen the southbound on -ramp to receive dual left - turns, and add a merge section to reduce
the two lanes to one lane. Reconstruct the pavement between the northbound and
southbound ramps and under the bridge. Install a traffic signal to operate with split - phasing
and interconnect with other study area traffic signals; OR
2. Construct an exclusive left -turn lane on the westbound approach by modifying the existing
median to provide back -to -back left -turn lanes with the eastbound left-turn lane at the U.S.
Route 29 Bypass Northbound Ramps intersection. Construct an additional westbound lane
on Fontaine Avenue from the northwestern corner of the northbound ramps intersection to
the southbound ramps intersection to provide an exclusive westbound through lane.
Restripe the existing westbound lane as an exclusive left -turn lane to provide dual left -turn
movements onto the southbound ramp with the addition of the new left -turn lane. Widen
the southbound on -ramp to receive dual left -turns, and add a merge section to reduce the
two lanes to one lane. Reconstruct the pavement between the northbound and southbound
ramps and under the bridge. Install a traffic signal to operate with standard left -turn
phasing and interconnect with other study area traffic signals.
"SIGNATURE ON THE FOLLOWING PAGE"
ATTACHMENT F
OWNER:
-lei
By: OVl G 5}'f cka
nn
Title: � .Kk eT :f 1oa "da) Mcrr
University of Virginia Health Services Foundation
COMMONWEALTH OF VIRGINIA,
CFfY COUNTY OF Atbeirw G to -wit:
he foregging instrument was acknowledged before me this l day of , 2011, by
1EHC.i5bM= Chief Financial Officer, of University of Virginia 1-Icalth Services Foundation.
My Commission expires: y4--u� b / �Y.t�
Notary Public
Notary registration number: J62543
,,� VMefanie A. Evans
: � �, Commonwoallh of Virginia
4 1��., f� Nalary Public
,•,,g� Commission No. 3&2543
a •: f. M't Unnmision Expires o6/3W2013
ATTACHMENT F