HomeMy WebLinkAboutSP201000009 Legacy Document 2011-06-10 (8)From: Justin Weiler Oweiler @rivanna.org]
Sent: Wednesday, May 19, 2010 10:31 AM
To: Rebecca Ragsdale
Cc: Jennifer Whitaker; Michelle S. Simpson, PE; 'Gary Whelan'
Subject: ZMA20100003 Morey Creek Professional Center
Rebecca,
RWSA has reviewed the application for ZMA20100003 Morey Creek Professional Center. Below is a
completed copy of the form that was provided to us by Elaine Echols for ZMA applications. Please let me
know if you have any questions or concerns. Thanks.
Justin
To be filled out by RWSA for ZMA's and SP's
1. Capacity issues for sewer that may affect this proposal: RWSA does not believe that, at
this time, there are any capacity issues in the RWSA collection system that will affect
this development. RWSA believes that the Morey Creek Interceptor has adequate
capacity to serve this development.
2. Requires Rivanna Water and Sewer Authority capacity certification Yes _X_ No
Based on the information that has been provided to date, RWSA does not believe that -
this development will require a capacity certification (it appears that the proposed
development will not generate over 40,000 gpd of sewer), but it is up to ACSA to
determine the amount of sewer that the site will generate and request a capacity
certification if needed.
3. Water flow or pressure issues that may affect this proposal
None Known
4. "Red flags" regarding service provision (Use attachments if necessary)
There is currently an RWSA sewer interceptor that runs through the proposed site. It is
anticipated that in the future (most likely after 2020) this interceptor will need to be
upgraded. In anticipation of upgrading the interceptor, RWSA would like an additional 10'
in width of easement adjacent to the existing 30' wide easement for the interceptor. It is
believed that a 40' wide easement will be needed to upgrade the interceptor. Also, the
retaining walls along the existing RWSA easement will need to be designed so that RWSA
can excavate at the edge of its easements without compromising the retaining walls.
These issues can be resolved at the site plan stage, but RWSA wanted to make the
applicant aware of them at this time.
Justin Weiler, E.I.T.
Civil Engineer
Rivanna Water and Sewer Authority
695 Moores Creek Lane
Charlottesville, VA 22902
Phone: 434.977.2970 ext.206
Fax: 434.295.1146
ATTACHMENT G