Loading...
HomeMy WebLinkAboutSP201100018 Review Comments 2011-09-30Dill 0 0_' , 4 s' K � ,. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4176 September 30, 2011 Pete Borches P.O. Box 7823 Charlottesville, Virginia 22906 RE: SP201100018 Colonial Nissan- Parking Deck 1St Review Comment Letter on special use permital submittal received August 15, 2011. Mr. Borches: Staff has reviewed your initial submittal for a Special Use Permit for a Parking Deck on the Colonial Nissan property. We have a few questions and comments which are listed below: Planning Initial comments on how your proposal generally relates to the Comprehensive Plan are provided below. Comments on conformity with the Comprehensive Plan are provided to the Planning Commission and Board of Supervisors as part of the staff report. The Places 29 Master Plan has designated this property as Office /R &D /Flex /Light Industrial which is described as commercial, professional offices; research and development, design, testing of prototypes; manufacturing, assembly, packaging. Auto Commercial Sales and Service is listed in the Master Plan as a use permitted in the Master Plan. The proposed parking structure supports this use. Staff has no objection to this use. Neighborhood Model Pedestrian Orientation and Neighborhood Friendly Streets and Paths- Accommodates walkers, bikers, and public transportation so that mobility can be a reality for the elderly, the young, and those with limited access to automobiles. Page 1 of 5 A sidewalk exists on Route 29 and public transportation is available on Route 29. Transportation Networks and Interconnected Streets- Requires interconnected streets within developments and between developments so that pedestrians can walk easily to many destinations, traffic has alternative routes, and car trips are reduced in number and length. This is not applicable to this proposal. Parks and Open Space- Makes open space integral to overall design so that residents and workers can walk to a public park, experience preserved natural areas, and enjoy public gathering spaces. This is not applicable to this proposal. Mixed Uses- Contains a mixture of residential and non - residential uses so residents have convenient access to work, to services, and to entertainment. This site is a commercial use with no residential uses proposed. Affordability and Mixture of Housing types- Mixes housing types and markets so that a full range of housing choices is offered within the neighborhood. No residential uses are proposed. Site Planning that respects terrain- Adapts development to site terrain so that natural topography can be preserved. This site is primarily developed. Clear boundaries with the Rural Areas- Maintains a clear boundary between Development Areas and Rural Areas. This is not applicable to this proposal. Buildings and Spaces of Human Scale- Keeps buildings and spaces at a human scale so that street views are attractive and pedestrian friendly. The parking deck is proposed to be in the rear of the building and will be subject to Architectural Review Board review that will assure that the building will be attractive and pedestrian friendly. Relegated Parking- Moves off - street parking out of sight and encourages on- street parking. The parking deck is proposed to be in the rear of the building which will relegate it out of sight. Neighborhood Centers- Provides for neighborhoods to have a designated center to bring diverse and continuous activity to a neighborhood. Page 2 of 5 Revised 4 -25 -11 eke IV This is not applicable. Redevelopment- Emphasizes re -use of sites. Incorporates varying densities and gradually allows for an overall increase in density in the Development Areas to meet the goals of the Comprehensive Plan. This is not applicable to this proposal. More detailed comments may be provided after more detailed plans are provided. Zonin The following comments related to zoning matters have been provided by Ron Higgins: See Margaret's comments on the visibility (or lack of) of the display parking from the Entrance Coordidor. Given the current proposal, no SP is needed for that. Current Development The following comments regarding your proposal's ability to meet site plan or subdivision ordinance requirements in the future have been provided by Bill Fritz: Parking structures frequently require amendments from the design standards of Sections 4.12.15, 4.12.16 and 4.12.17. The applicant should review these regulations and request any modifications now so that they may be considered with the SP. If the SP is approved without the modifications in place the applicant should be on notice that approval of the SP does not grant or imply approval of any modification. Modifications are reviewed as provided by Section 4.12.2. The submitted information does not address all of the requirements of Section 32.7.2A. It may be possible to address some of the requirements of this Section with conditions. Engineering and Water Resources The following comments related to engineering and water resources have been provided by Glenn Brooks: 1. It appears there may be a net increase in impervious area, and a concept stormwater management plan should be included. 2. Site circulation and parking will need to meet the requirements of the Zoning Ordinance, and details around the building may need to change with site plans. Entrance Corridor The following comments related to the Entrance Corridor Guidelines have been provided by Margaret Maliszewski: Regarding the Special Use Permit for the parking structure: It is anticipated that a building can be designed to accommodate an automobile dealership, Page 3 of 5 Revised 4 -25 -11 eke maintenance center, and a parking structure, while meeting the Entrance Corridor design guidelines.The architectural design requires ARB approval. That ARB review is scheduled for October 3, 2011. Regarding the Special Use Permit for outdoor sales /storage /display: I have reviewed the site section and rooftop parking issue with Fred Missel, ARB chairperson. Based on the drawing entitled "Line of Site Study" dated 8 -12 -11 and received on 9 -7 -11, it has been determined that the rooftop parking will not be visible from the Route 29 Entrance Corridor. Consequently, a Special Use Permit for outdoor storage /display will not be- required. Please be cautioned, however, that the determination is based on the parapet condition as illustrated in the referenced drawing. If the parapet condition changes to address ARB comments on the proposed architectural design, the issue could need to be revisited. ARB review of the architectural design is scheduled for October 3, 2011. VDOT The following comments related to VDOT have been provided by Joel DeNunzio: 1. The existing site connects to a private road, Myers Dr, which connects to Route 29 south. The existing and proposed uses generate enough traffic to warrant a right turn lane from Route 29 to Myers Dr. and the entrance should be upgraded with the site plan. Fire /Rescue This must comply with the Virginia Statewide Fire Prevention Code. Final approval is subject to field inspection and verification. ACSA The following comments related to ACSA have been provided by Alex Morrison: 1. Site is in jurisdictional area for water and sewer. 2. Closest waterline is located on property. 3. Closest sewer line is on property. 4. Capacity issues for sewer that may affect this proposal: None Known 5. Requires Rivanna Water and Sewer Authority capacity certification: No 6. Water flow or pressure issues that may affect this proposal: 7. Red flags" regarding service provision (Use attachments if necessary): RWSA The following comments related to RWSA have been provided by Victoria Fort: 1. Capacity issues for sewer that may affect this proposal None Known 2. Requires Rivanna Water and Sewer Authority capacity certification Yes X No 3. Water flow or pressure issues that may affect this proposal None Known 4. "Red flags" regarding service provision (Use attachments if necessary) None Known Action after Receipt of Comments Page 4 of 5 Revised 4 -25 -11 eke After you have read this letter, please take one of the actions identified on "Action After Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal. The resubmittal date schedule is provided for your convenience. Notification and Advertisement Fees Recently, the Board of Supervisors amended the zoning ordinance to require that applicants pay for the notification costs for public hearings. Prior to scheduling a public hearing with the Planning Commission, payment of the following fees is needed: $168.60 Cost for newspaper.advertisement $207.52 Cost for notification of adjoining owners (minimum $200 + actual postage /$1 per owner after 50 adjoining owners) $368.60 Total amount due prior to Planning Commission public hearing Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing needed. $168.60 Additional amount due prior to Board of Supervisors public hearing $544.72 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Feel free to contact me if you wish to meet or need additional information at 434.296.5832 ext 3004. My email address is myaniglos @albemarle.org. Sincerely, Ikgn Yani 'lo Senior Planner Planning Division enc: Action After Receipt of Comments Resubmittal Schedule Resubmittal Form Page 5 of 5 Revised 4 -25 -11 eke DEPARTMENT OF COMMUNITY DEVELOPMENT A N-Icli ; ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the last page of your comment letter with vour submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit /request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and /or when you are ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with Page I of 6 Revised 4 -25 -11 elce the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. By no later than twenty -one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty -two (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. Page 2 of 6 Revised 4 -25 -11 eke FEE SCHEDULE FOR ZONING APPLICATIONS A. For a special use permit: 1. Additional lots under section 10.5.2.1; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 2. Public utilities; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 3. Day care center; application and first resubmission Fee.........................................................................:.. ............................... ......................$1,000.00 Each additional resubmittal ........................................ ............................... .......................$500.00 4. Home occupation Class B; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ........................ ............................... ........ ............................... $ 500.00 5. 5. Amend existing special use permit; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ..................... .......................................... ............................... $ 500.00 6. Extend existing special use permit; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 7. All other special use permits; application and first resubmission Fee...............................................................:............ ............................... ......................$2,000.00 Each additional resubmittal ........................................................... ............................... $1,000.00 8. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 B. For amendment to text of zoning ordinance: Fee................................................................................... ............................... .......................$1000.00 C. Amendment to the zoning map: 1. Less than 50 acres; application and first resubmission Fee............................................................................ ............................... ......................$2,500.00 2. Less than 50 acres; each additional resubmission Fee.............. .............. .......................................... ............................... ............ ..$1,250.00 3. 50 acres or greater; application and first resubmission Fee............................................................................ ............................... ......................$3,500.00 4. 50 acres or greater; each additional resubmission Fee............................................................................. ............................... .....................$1,750.00 5. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 D. Board of Zoning Appeals: 1. Request for a variance or sign special use permit Fee............................................................................. ............................... ........................$500.00 2. For other appeals to the board of zoning appeals (including appeals of zoning administrator's decision) — Fee (to be refunded if the decision of the zoning administrator is overturned) .......$240.00 N. Required notice: 1. Preparing and mailing or delivering up to fifty (50) notices: Fee............................................................................. ............................... ........................$200.00 plus the actual cost of first class postage 2. Preparing and mailing or delivering, per notice more than fifty (50): Fee............................................................................... ............................... ..........................$1.00 plus the actual cost of first class postage 3. Published notice: Fee.............................................................................. ............................... .........................Actual cost Page 3 of 6 Revised 4 -25 -11 eke N C O v a L ca a a� J �L a L O m a cn y.. O M O m C O V B a O .N .E O V a� c c� a 0 � do 1� %ii! _ .. � • � �/:! /1 % I�I'1 .. /Fri �� : 0 .1100 So 50. Poo . `/;; • 04 mio .� ,� • • 50,0 ME 100,111 0 � do - ® �/:! go Mz,100 % I�I'1 .. /Fri .1100 So 50. Poo . `/;; • 04 mio .� ,� • • 50,0 ME 100,111 0 2,011 Submittal ,and 'Review ,S�ched�u'l-W, Spectral t use Permits and' Zoning, Map Amendments ResubmiffM Solliedule Written Com ments and ar'tiest, P la n:n [in g,,C o m mists i to n; Pu b lic H earl nv� Resubmit-tal Dates monday Cornments to applicant for decision on whether;, to proceed to Publ[c Hearling Wednesday Dectsion fol"PILIWIC Hear i nt & Legal Ad Fe-e aria MondaY pla,1111, ing Commtsslon Pu'bl"Ic Hlear[119 No sconer than' Tuesday Jan 3 Feb '.2 Feb 7 Mar .l Feb 16 Feb ,21 mar 15 Feb 7 mar 9 Mar 14 Apr,5 Mar 24 Mar 28 Apr'19 IMar 7 A 6 A 18 Ma� 10 t4ar 21 Apr 4 Apr 20 Nlay 4 Mla4 2 Max 16 �May 24 JUn 7 Apr18 may'l 8 Jun 21, Nda%/ 2 Jun 'It Jun 20 Jul '12 May 16 Jun '15 qlu J U 12,13 Jun 6 Jul ,6 Jul 18 Aug 9 Jun 20 Jul 20 Aug I Auci 23 Jul is Aug 3 Aug 17 AU2 31 ALIg 22 P Sep 1.2 Sep 1:3 Se p 27, Oct 4 .Aug 15 Sep '14 Sep .26 Oct, '119 Oct r. 0,ct 10 Nov 1 Sep 19 Oct 19 Oct 24, Nov '1 Oct' iNov2 Nov 14 Dec 6 Oct 17 Nov 116 Nov 21 Dec 13 Nov 7 Nov 21 Dec 7 Dec 21 Dec 19 777,27 ":2 Dec 1. III Dec 19 2012 d I4 2042, 20! 2� 1W Jan,,,2 201 i MW b, 0.2res showivin heroics : are cba"ves uue To a L,-UUfFX Y 1.101SUdy The reVIvAng planner will' contact applicanUo discusscomments of relfiewels and. advise that changes that are needed are significant enough to warrant'an addificnal submittal or advise that the the project, is iready fbra public he-10g. If changes :needed are minor, 11he planner will! adWsa that the project go to public hearing. A-* Legal ad fees ,must be paid 22, days ,in. advance of the Planning, Comnl,,issioii! slid 'heann.g., An additional legal ad fee vault :need to be Paid 22 days in advance of the Board of • Supervisors public healing. If an appificant,dedides to go to public hearing, against the advice of the revievtng planner,, a recom mendation for (feniat will UK* resul , Generally, the appl !cant: wil I %111 have onhj one opportunibi to defter the PC pubes cbearing for the project onr� It has been. advertised for public hearing. AdMonal deferrals wl.13 not be allcoved except. in extraordl.nary circumstances such. as a major change in the project, proposal by the applicant or more issues identified by staff that have not prelAously been brought to the applicant's attentlon,. Board of Supe;.Msors' worF�sesslons and public bearings vititill be, scho-duled: after the Plann Ing Commision's action: on applications_ Page 5 of 6 Revised 4-25-11 eke FOR OFFICE USE ONLY SP # or ZMA # Fee Amount $ Date Paid By who? Receipt # Ck# By: Resubmittal of information for Special Use Permit or �� '�� Zoning Map Amendment h)tc�N�P PROJECT NUMBER: PROJECT NAME: ❑ Resubmittal Fee is Required ❑ Per Request ❑ Resubmittal Fee is Not Required Community Development Project Coordinator Signature Name of Applicant Date Signature FEES Phone Number Date Resubmittal fees for Special Use Permit -- original Special Use Permit fee of $1,000 ❑ First resubmission FREE ❑ Each additional resubmission $500 N Y:Y :k Gib yA2`Y+"k L+ntKa ii K tlg5 y k Si' tyV l" L§ Adg N'Y�'CE" y.... l iL � :� "r �t ; yi"tlF i t Ke J' S. �J ;� �t k� k �t -L A�/ Q`AC: '�,�'i4. [u� Ti ;J�d�J• �'�' -Yr ??,,9 `� Resubmittal fees for original Special Use Permit fee of $2,000 ❑ First resubmission FREE ❑ Each additional resubmission $1,000 "Y ,:e Resubmittal fees for original Zoning Map Amendment fee of $2,500 ❑ First resubmission FREE ❑ Each additional resubmission $1,250 b ?�"a4(t tl " l iiS�l, w�I�,aaI.t�R'uid�'rk7 Resubmittal fees for original Zoning Map Amendment fee of $3,500 ❑ First resubmission FREE ❑ Each additional resubmission $1,750 '; :1 �, jl�'ed�y'r. ac 1 . p } i i , �awi„ Yr .�nk?n fifiitl,�: ; r . i .�'u..�i .i sM�.:�.� I . '.: 4' r;t q s 8a ',Uy,'.,.. � , 7 a tM 1 • $ .r4.', :F §':7 t�t '9 � . -0 :r, , } ti+x v.t %, �l. r tv. ., �`, Ap� , r 1 fJ ��. i�'A I:.'t v. ': . A+u. � .ryP.d,+I +, �;y �+'. i '. �� f 7 � ,..'.:�y.i,.. 1 1..'.�rt .am.t .-; � Y1 ,,fil'r,k1 : . �"` �i l:�..�t�.�Ircb 7 � rw�.c . .. 'r :%qi,�5r�ipp1 :. .!5g.�'f....oi;. s1 Yea t 'i . .. s'3I. . �'ai,i:t4 ir, r:dc i st�5.hY,,. r' .',.p. �. 7�._ .'4� , TYk &a F t } 11214 ,�..:i..+ n. ❑ Deferral of scheduled public hearing at applicant's request Add'] notice fees will be required $180 To be paid after staff review for public notice: Most applications for Special Use Permits and Zoning Map Amendment require at least one public hearing by the Planning Commission and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body. MAKE CNECKS TO COTTNTV OF AT,RFMART,E /PAYMENT AT COMMUNTTV DEVELOPMENT COUNTER Preparing and mailing or delivering up to fifty (50) notices $200 + actual cost of first -class postage Preparing and mailing or delivering each notice after fifty (50) $1.00 for each additional notice + actual cost of first -class postage Legal advertisement (published twice in the newspaper for each public hearing) Actual cost (minimum of $280 for total of 4 publications) County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 6/7/2011 Page 1 of 1