HomeMy WebLinkAboutWPO201100062 Inspection 2011-11-14*,A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
EROSION CONTROL RE- INSPECTION INVOICE
DATE: November 11, 2011
INVOICE T0: Hurt Investment Company
c/o Mr. Tucker Hurt
195 Riverbend Drive
Charlottesville, VA 22911
RE: WPO- 2011 -00062
Kia Auto Dealership- Erosion and Sediment Control Plan -TMP 78, parcels 9A & 11
Erosion Control Violation
DATE OF RE- INSPECTION: 9/16/2011
RE- INSPECTION FEE: $250
By December 11, 2011, you should forward the re- inspection fee of $250 to continue your
project. To pay the re- inspection fee, please send a check payable to the County of Albemarle
to my attention along with the enclosed copy of this invoice.
If you should have any questions, please do not hesitate to contact me.
Sincerely
Ana D. Kilmer
Management Analyst
Administration
ADK/
Enclosure
IVEVACommmuly A"quucn1%RE•IN5PEC ON FEEMWP0201 RK1062 Hun ln%=M mu COmpmn .Ax
F zsD, o��QE- �:'ciiaw /26-r
kn
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434 ) 296 -5832 Fax (434 ) 972 -4126
September 16, 2011
Hurt investment Company
c/o Mr. Tucker Hurt
195 Riverbend Drive
Charlottesville, VA 22911
RE: Tax Map 78, Parcels 9A & 11
Erosion Control Violation
STOP WORK ORDER
Dear Mr. Hurt:
Under § 17 -214 of the Albemarle County Code, you are hereby notified to immediately cease all land
disturbing activities on the above referenced property (STOP WORK) with the exception of work to
address the installation of erosion control measures, soil stabilization, and any necessary drainage
corrections as approved by the County. A sworn complaint has been made by the Inspector, Kenny
Thacker, who indicates that grading has taken place on the above referenced property without obtaining
the appropriate permits. This STOP WORK ORDER shall remain in place for seven (7) days from the
date of receipt. If satisfactory repairs have not been made within seven (7) days, the County may elect to
issue another Stop Work Order, and/or petition the Circuit Court for penalties and relief with regard to
this violation.
Required Corrections
1. You are hereby required to submit an Erosion and Sediment Control Plan with Narrative, and a Water
Protection Application with appropriate fees, to the Albemarle County Department of Community
Development. The plan must be reviewed, approved, performance bond posted in the amount
determined by the plan approving authority, and a Certified Responsible Land Disturber (RLD)
named prior to the Grading Permit being issued.
If you have any questions or concerns with steps necessary to correct this violation, please contact Kenny
Thacker at 434 - 296 -5832, ext 3390.
Sincerely.
Kenny Thacker
Erosion Control Officer
Inspection Division
Cop , Glenn Brooks,P.E., County Engineer
Reading File /� A
Signet= I Date
/G /d