Loading...
HomeMy WebLinkAboutWPO201100062 Inspection 2011-11-14*,A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 EROSION CONTROL RE- INSPECTION INVOICE DATE: November 11, 2011 INVOICE T0: Hurt Investment Company c/o Mr. Tucker Hurt 195 Riverbend Drive Charlottesville, VA 22911 RE: WPO- 2011 -00062 Kia Auto Dealership- Erosion and Sediment Control Plan -TMP 78, parcels 9A & 11 Erosion Control Violation DATE OF RE- INSPECTION: 9/16/2011 RE- INSPECTION FEE: $250 By December 11, 2011, you should forward the re- inspection fee of $250 to continue your project. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If you should have any questions, please do not hesitate to contact me. Sincerely Ana D. Kilmer Management Analyst Administration ADK/ Enclosure IVEVACommmuly A"quucn1%RE•IN5PEC ON FEEMWP0201 RK1062 Hun ln%=M mu COmpmn .Ax F zsD, o��QE- �:'ciiaw /26-r kn COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434 ) 296 -5832 Fax (434 ) 972 -4126 September 16, 2011 Hurt investment Company c/o Mr. Tucker Hurt 195 Riverbend Drive Charlottesville, VA 22911 RE: Tax Map 78, Parcels 9A & 11 Erosion Control Violation STOP WORK ORDER Dear Mr. Hurt: Under § 17 -214 of the Albemarle County Code, you are hereby notified to immediately cease all land disturbing activities on the above referenced property (STOP WORK) with the exception of work to address the installation of erosion control measures, soil stabilization, and any necessary drainage corrections as approved by the County. A sworn complaint has been made by the Inspector, Kenny Thacker, who indicates that grading has taken place on the above referenced property without obtaining the appropriate permits. This STOP WORK ORDER shall remain in place for seven (7) days from the date of receipt. If satisfactory repairs have not been made within seven (7) days, the County may elect to issue another Stop Work Order, and/or petition the Circuit Court for penalties and relief with regard to this violation. Required Corrections 1. You are hereby required to submit an Erosion and Sediment Control Plan with Narrative, and a Water Protection Application with appropriate fees, to the Albemarle County Department of Community Development. The plan must be reviewed, approved, performance bond posted in the amount determined by the plan approving authority, and a Certified Responsible Land Disturber (RLD) named prior to the Grading Permit being issued. If you have any questions or concerns with steps necessary to correct this violation, please contact Kenny Thacker at 434 - 296 -5832, ext 3390. Sincerely. Kenny Thacker Erosion Control Officer Inspection Division Cop , Glenn Brooks,P.E., County Engineer Reading File /� A Signet= I Date /G /d