Loading...
HomeMy WebLinkAboutSP201000044 Legacy Document 2011-11-16LrRGtNh' ALBEMARLE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT STAFF REPORT Project Name: SP2010 -044; SP2010 -045; Staff: Megan Yaniglos, Senior Planner SUB2010 -119- Granger Property; Fill in the Floodplain with Two Stream Crossings and Preliminary Subdivision Planning Commission Work Session: Comp. Plan Designation: Office Service -- November 15, 2011 office uses, regional scale research, limited production and marketing activities, supporting commercial, lodging and conference facilities, and residential (6.01 -34 units /acre) and Parks and Greenways - parks; greenways; playgrounds; pedestrian and bicycle paths in Urban Area 5 Owners: Stribling Holdings LLC Applicant: Scott Collins- Collins Engineering Acreage: 69.427 acres By -right use: R1 - Residential - low density residential uses, EC Entrance Corridor - Overlay Proposal: Request for feedback concerning the to protect properties of historic, architectural or alignment of the road, the waiver requests cultural significance from visual impacts of associated with the subdivision plat, and the development along routes of tourist access, AIA stream crossings. - Airport Impact Area - Overlay to protect the airport and FH - Flood Hazard - Overlay to provide safety and protection from flooding Proffers: None DA (Development Area); EC (Entrance Corridor) TMP: 76 -24 Magisterial District: Samuel Miller Character of Property: Undeveloped and Use of Surrounding Properties: Fontaine wooded, the fill is proposed on Morey Creek Research Park, City of Charlottesville, near its confluence with Moores Creek. The Residential property is located on the west side of Sunset Avenue adjacent to the City of Charlottesville. RECOMMENDATION: Provide guidance to applicant and staff STAFF PERSON: Megan Yaniglos PLANNING COMMISSION WORKSESSION: November 15, 2011 SP201000044 Granger Fill in the Floodplain- Stream Crossing #1 SP201000045 Granger Fill in the Floodplain- Stream Crossing #2 SUB201000119 Granger Property- Preliminary Subdivision Plat Petition: PROPOSED SP: Placement of fill in the floodplain to allow road construction. PROPOSED SUBDIVISION: Request for preliminary plat approval for the creation of 79 cluster single family lots on 69.427 acres at a proposed density of 1.1 dwelling units per acre, including 24.94 acres in common open space. ZONING CATEGORY /GENERAL USAGE: R1 - Residential - low density residential uses, EC Entrance Corridor - Overlay to protect properties of historic, architectural or cultural significance from visual impacts of development along routes of tourist access, AIA - Airport Impact Area - Overlay to protect the airport and FH - Flood Hazard - Overlay to provide safety and protection from flooding SECTION(S) for SP: 30.3.05.2.1 (2), 30.3.05.2.2 (1) and 30.3.05.2.2 (3), which allow filling of land in the floodway SECTION(S) for SUBDIVISION: Chapter 14 Section 206 of the Subdivision Ordinance; Chapter 18 Section 13 of the Zoning Ordinance; Chapter 18 Section 4.2 of the Zoning Ordinance COMPREHENSIVE PLAN LAND USE /DENSITY: Office Service -- office uses, regional scale research, limited production and marketing activities, supporting commercial, lodging and conference facilities, and residential (6.01 -34 units /acre) and Parks and Greenways - parks; greenways; playgrounds; pedestrian and bicycle paths in Urban Area 5 ENTRANCE CORRIDOR: Yes LOCATION: This fill is proposed on Morey Creek near its confluence with Moores Creek. The property is located on the west side of Sunset Avenue adjacent to the City of Charlottesville. TAX MAP /PARCEL: 07600 -00 -00 -02400 MAGISTERIAL DISTRICT: Samuel Miller Background: Characteristics of the Site & Area This property is located just south of the Fontaine Research Park and is bordered by the Norfolk Southern Railway, Interstate 64, and Sunset Avenue (Attachment A). The property contains 69.427 acres and is mostly wooded. It contains both Morey Creek and Moores Creek, as well as, a large overhead power line. To the north of the property is the Fontaine Research Park. Located to the east of the property, less than a quarter of a mile, is residential property and the City of Charlottesville, as well as a connection to Stribling Avenue. The west side is bounded by Interstate 64, and to the south are Sunset Avenue and Eagles Landing Condominiums. (Attachment B) Specifics of Proposal: The applicant is proposing a by -right subdivision under the existing zoning (R1) that will have 74 single family lots, and will include a large area dedicated open space with a proposed greenway trail (Attachment C). The subdivision request includes a number of modifications: critical slopes modification, sidewalk and planting strip modification, as well as a density bonus request for open space dedication. Along with the subdivision the applicant is requesting two special use permits for 2 stream crossings, one is associated with a proposed road that would ultimately serve as a part of the Sunset - Fontaine connector. The other crossing is to serve additional lots for the subdivision. The proposed road will have bike lanes and a sidewalk on one side. Conformity with the Comprehensive Plan: According to the Land Use Plan, this property should be developed as Office Service -- office uses, regional scale research, limited production and marketing activities, supporting commercial, lodging and conference facilities, and residential (6.01 -34 units /acre), as well as Parks and Greenways - parks; greenways; playgrounds; pedestrian and bicycle paths. Land Use Plan for Neighborhood 5 -- Applicable statements /goal from the Comprehensive Plan relevant to this site include: (Attachment H) • Any development of the site should be timed with the construction of recommended /planned or necessary improvements to the road network which provide an adequate level of service to support development in this area; • The proposed Sunset Avenue - Fontaine Avenue connector road shall be accommodated on- site; the provision of pedestrian, bike facilities, and transit service and /or transit ready site design; ■ Open space, greenway and park area should be provided; ■ Minimize visual impacts to the Entrance Corridor through maintenance of vegetated buffers, careful site grading, and careful treatment of building locations, heights, massing and clustering; ■ Measures should be put in place to not only minimize stream impacts, but also to help improve the current condition of Moore's Creek. Open Space Plan — The County's Open Space Plan shows many environmental resources on this property including; Major and Locally Important Stream Valleys and Adjacent Critical Slopes; Surveyed Historic Site; and Perennial Streams. The Southern Area B Study also calls for an open space area and trails along Moore's Creek in this area. Principles of the Neighborhood Model —Staff has assessed the proposal for conformity with the Neighborhood Model: Pedestrian Sidewalks are located on one side of the connector road, as well as both Orientation sides of the other proposed road. A greenway trail is proposed throughout the development. These features will provide pedestrians with a multitude of connections into adjacent neighborhoods, the city of Charlottesville, and the University of Virginia. This principle is met. Neighborhood The proposed connector road contains bike lanes, and will have street Friendly Streets trees and sidewalks on one side of the street. The other proposed road will and Paths also have street trees and sidewalks. There will be a greenway trail that will provide an additional path for pedestrians and bicyclists. No public transportation stops are proposed on the property. This principle is met. Interconnected The Fontaine - Sunset connector road provides a number of connections to Streets and adjacent neighborhoods, the university, and the city. Transportation Networks Parks and Open The proposal includes a large portion of the property to be dedicated open Space space that will contain a greenway trail. This principle is met. Neighborhood This principle is not applicable- it is a by -right subdivision. Centers Buildings and This principle is not applicable; it is a by -right subdivision, and will be Spaces of Human required to meet the subdivision ordinance. Scale Relegated Parking This principle is not met- parking will be regulated by the subdivision ordinance and will be located on individual lots. Mixture of Uses This principle is not met; however, this area of Albemarle County has a variety of different uses nearby. Mixture of Housing This principle is not met since it is a by -right subdivision. All the proposed Types and lots will be single family residential. There is a variety of unit types and Affordability densities located in the area. Redevelopment This principle is not applicable. Site Planning that The applicant is impacting a number of critical slopes. Engineering has Respects Terrain determined that some of this impact can be reduced. Clear Boundaries This principle is not applicable. with the Rural Areas Questions for the Commission: Is the proposed Sunset- Fontaine Ave connector road the proper alignment? The purpose of this question is to check in with the Commission at this point in so that the applicant can get feedback and address any issues that the Commission may have with this proposal. The Comprehensive Plan reflects the recommendations of the Southern Area B Study (Attachment G) developed and approved by Planning and Coordination Council (PACC) consisting of the City of Charlottesville, Albemarle County, and the University of Virginia. One of the primary recommendations of this study is to construct a road connecting Sunset Avenue to Fontaine Avenue (The Sunset - Fontaine Connector). The Southern Area B Study recommended a specific alignment for the road (Alternate 4), including an over pass of the railroad. A portion of the alignment on the north side of the railroad has been reserved for dedication with the recent approval for the rezoning of the Fontaine Research Park (ZMA2007 -013). The County's Comprehensive Plan does not specifically note the Alternative 4 alignment. When incorporating the Area B Study recommendations into the Comprehensive Plan (CPA 05 -05 and 05- 09), the Board of Supervisors wanted to provide maximum flexibility to accommodate this road. However, with the reserved right of way established on The Fontaine Research Park site, the "connecting point" on the north side of the railroad as been established. Staff believes that the location and alignment of the road generally follows what is shown in the Area B study. 11 Does the Commission concur that the entire length of the connector road be built with the first phase of development? The applicant is proposing to build the southern portion of the subdivision (Lots 20 -74) with access from Sunset Ave with the first phase; then construct stream crossings #1 and #2 and the northern subdivision lots (Lots 1 -19). Only a portion of the connector road is being proposed to be built with the first phase, and then construct the stream crossings and the rest of the road with the second phase of development. The second phase would connect to Stribling Ave and Fontaine. Staff believes the full length of the connector road should be built with the first phase of development. Staff can support the alignment shown because it provides a reasonable location for a through road and will allow an immediate connection to Stribling Ave. The road should not be phased as shown on the subdivision plat and proposed by the applicant. It is important for interconnectivity to have the road built with the first phase of development; which would also be consistent with Virginia Department of Transportation's recommendations and requirements for interconnectivity. Does the Planning Commission agree with this recommendation? Are the stream crossings at the appropriate location? Again, the purpose of this question is to check -in with the Commission, so that the applicant can get feedback and address any issues that the Commission may have with the stream crossings. Staff believes that this alignment of the road and subsequent stream crossings are appropriate and in line with what was shown in the Area B study. These locations are on and adjacent property and the application will need permission from the owner to build the main crossing for the connector road. The alignment and crossings could move to be located solely on the Granger property, however Staff doesn't believe that changing the location of the stream crossings would reduce the impact on the streams compared to the current proposed locations. Is the Planning Commission willing to support this proposal and associated modification requests? The applicant would like some feedback as to whether or not they should continue and move forward with the modification requests. There are a number of modifications associated with the subdivision plat: Critical slopes: Engineering staff has reviewed the applicants critical slopes modification request (Attachment F) and recommends a number of changes that could be made by the applicant in order to reduce the impact to critical slopes. The applicant should work with staff to identify and make changes to those areas where critical slope disturbance could be reduced. Does the Commission believe that further work needs to be done to reduce impacts to critical slopes? Sidewalk and Planting Strip: The applicant is requesting that a modification be given to allow for sidewalks and planting strips only to be located on one side of the connector road. Staff believes that this modification is justified because there is a Virginia Dominion power line easement where the sidewalk and planting strip would be located, also the applicant is proposing a greenway trail on that side of the road, no lots are proposed on that side of the road, and no existing sidewalk connections to adjacent properties exist at this time. Does the Commission agree with this direction? Dedication of Open Space: The applicant is proposing to dedicate 28.71 acres of open space (Attachment E) to the County. Parks and Recreation staff has reviewed this proposal and is interested in the land being dedicated and supports this proposal. No specific direction needed from the Commission, but any comments concerning the open space would be appreciated. Issues to be addressed by the Applicant: The proposed development includes property not owned by Stribling Holdings, LLC. The stream crossing for the connector road is within an adjacent property. Thus far, the owner of the adjacent property has not been a part of the application, as required for the special use permit and the subdivision plat. The proposed development includes proposed lots, roads, open space in a Virginia Dominion Power easement, and the applicant has not provided information that Virginia Dominion Power approves of this proposal and will allow the use in their easement. Recommendation: Based on the information provided for review, staff recommends the following items be addressed prior to a public hearing: 1. Adjacent landowner(s) to be included in the special use permit, and subdivision plat applications. 2. The entire proposed connector road to be included in the first phase. 3. Approval from Virginia Dominion Power for the impacts to their easement including, roads, lots, grading, and open space. Attachments: Attachment A — Parcel Map Attachment B — Vicinity Map Attachment C — Proposed Subdivision plat Attachment D — Proposed Stream Crossings Attachment E — Open Space Exhibit Attachment F — Critical Slopes Waiver- Applicant Request and Engineering Staff Review Attachment G- Southern Urban Area B Study Attachment H- Land Use Plan for Neighborhood 5 Attachment I- Virginia Department of Transportation Comments 6