Loading...
HomeMy WebLinkAboutWPO201000070 Inspection 2011-11-22pF AL b$ G1Tj1P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 EROSION CONTROL RE- INSIPECT'ION INVOICE DATE: November 22, 2011 INVOICE TO: Corolla Management Corporation 1813 E. Main Street Salem, VA 24153 RE: WPO- 2010 -00070 National College DATE OF RE- INSPECTION: 9/1/2011 RE- INSPECTION FEE: $250.00 By December 22, 2011, you should forward the re- inspection fee of $250.00 to continue your project. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If you should have any questions, please do not hesitate to contact me. Sincerely Ana D. Kilmer Management Analyst Administration ADK% Enclosure IADEP71Community Developmenl\Administration DivisionWimeASOPS for Billing Reinspection fees- invoice.doc AL 41:;v b� �j fly i GINIi" ��E) COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing _- - - - -- - Charlottesville, Virginia 22902- 4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 11, 2011 Corolla Management Corporation 1813 East Main Street Salem, VA 24153 Certified mail: 917108 2133 3937 4122 4259 91 7108 2133 3937 4122 4259 RE: WPO 2010 -00070 National College NOTICE TO COMPLY To whom it may concern: Under Section 17 -213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Permit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: Deficiency: Tree protection not installed on north side of project. Required Corrections: Install tree protection in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. Deficiency: Sediment Trap 1 not installed in accordance with the approved plan. Required Corrections: Install sediment trap 1 in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. Deficiency: Silt fence is down in multiple locations throughout project. Required Corrections: Repair and place silt fence in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. Deficiency: Sediment Trap 2 not installed in accordance with the approved E &S plan dated 3- 11 -11. Required Corrections: Install sediment trap 2 in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. le r, -,I'' .,. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing — - -- _ - -_ -_ -- — -- -_ -- - - - - -- Charlottesville, Virginia--22902-4596--- - -- - -- - - -__ -- -- - - -- - - - - - -- - -- Phone (434) 296 -5832 Fax (434) 972 -4126 August 11, 2011 Corolla Management Corporation 1813 East Main Street Salem, VA 24153 RE: WPO 2010 -00070 National College NOTICE TO COMPLY — RE- Inspection 9 -1 -11 To whom it may concern: Under Section 17 -213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Permit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: Deficiency: Tree protection not installed on north side of project. Required Corrections: Install tree protection in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. 9 -1 -11 — Trees removed prior to project commencement. Deficiency: Sediment Trap 1 not installed in accordance with the approved plan. Required Corrections: Install sediment trap 1 in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. 9-1 -11 - No longer required, Deficiency: Silt fence is down in multiple locations throughout project. Required Corrections: Repair and place silt fence in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. 9 -1 -11 — Repaired. Deficiency: Sediment Trap 2 not installed in accordance with the approved E &S plan dated 3- 11 -11. Required Corrections: Install sediment trap 2 in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. 9 -1 -11 - No longer needed I . Page') Corolla Management Corporation 1813 East Main Street Salem, VA 24153 Deficiency: Stockpile has no silt fence in accordance with the approved E &S plan dated 3 -11 -] l and the VESCH, Third edition, dated 1992, Required Corrections: Install silt fence in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. 9-1 -11 - Drains to protected drop inlet. Deficiency: Diversion to sediment trap 2 has not been seeded. Required Corrections: Seed in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. 9 -1 -11 — seeded. Deficiency: Stormwater conveyance channel not installed in accordance with the approved E &S plan dated 3= l 1 -11 and the VESCH, Third edition, dated 1992. Required Corrections: Install fence in accordance with the approved E &S plan dated 3 -11 -11 and the VESCH, Third edition, dated 1992. 9-1 -11 — To be installed after wall is backfilled. Note: 17- 207(2) "Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity; commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active buildingpermit and areas where erosion is prevented by a non - erosive surface. For the purposes of this section, a "non- erosive surface" includes,, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete; trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. " Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by no later than September 3, 2011. Under Sections 17 -213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date can have the following results: • Your permit may be revoked. • You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. • The County may issue a STOP WORK ORDER and seek relief in the Circuit Court, The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting from a failure to comply with this notice. Should you have a legitimate reason you can not complete the corrective measures by the above given date, you must immediately contact me at (434) 296 -5832. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. C' ' Page 3 Corolla Management Corporation 1813 East Main Street Salem, VA 24153 Note; This notice was re- inspected 9 -1 -11 and is now in compliance with the Albemarle County Ordnance. Sincerely, ayrnon W illy Senior Engineering Inspector Copy, E &SC File " Kenny Thacker, Albemarle County, Erosion Control Officer Glen Brooks P.E., Albemarle County, County Engineer Jim Mehringer, K4 Construction Group, 555 Gest Street, Cincinnati, OH 45203 Scott Bradshaw, A.G. Dillard, 295 Memory Lane, Troy, VA 22974