Loading...
HomeMy WebLinkAboutWPO200400092 Inspection 2012-06-12r' t ffti'4'�1� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Ir Fax (434) 972 -4126 EROSION CONTROL RE- INSPECTION INVOICE DATE: March 2, 2012 INVOICE TO: Advance Mill Land Trust (via e -mail) c/o Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 RE: WPO -2004 -00092 Advance Mills Farm Phase II DATE OF RE- INSPECTION: 212112012 RE- INSPECTION FEE: $250.00 By April 2, 2012, you should forward the re- inspection fee of $250.00 in order for the County to release your project. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If you should have any questions, please do not hesitate to contact me. Sincerely Ana D. Kilmer Management Analyst Administration ADK/ Enclosure I .DEPT'S D9-*k P'nMAE•IMSPEC[EU14 FEES,WPOZ(*400092 Advahm Mdlt Farm Phase 11 do: �pk AL{�, m `IRGIN�A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 EROSION CONTROL RE- INSPECTION INVOICE DATE: March 2, 2012 INVOICE TO: Advance Mill Land Trust (via e-mail) c/o Charlie Hurt 195 Riverbend Drive Charlottesville, VA 22911 RE: W PO- 2004 -00092 Advance Mills Farm Phase II DATE OF RE- INSPECTION: 2/21/2012 RE- INSPECTION FEE: $250.00 By April 2, 2012, you should forward the re- inspection fee of $250.00 in order for the County to release your project. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If you should have any questions, please do not hesitate to contact me. Sincerely Ana D. Kilmer Management Analyst Administration ADK/ Enclosure 1.0EPi\Community pevclopmentlRE- INSPECTION FEES\WP0200400092 Advance Mills Farm phase it.duc by A COUNTY OF ALBEMARLE 1 n•� Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone 434 296 -5832 Fax 434 972 -4126 2 Sep 2011 Advance Mills Land Trust C/o Mr. Geoff Elsie 195 Riverbend Drive Charlottesville, VA 22911 91 7108 2133 3937 4122 4327 Re: Erosion and Sediment Control Plan WP02004 -00092 NOTICE TO COMPLY Dear Mr.Elsie: An Erosion and Sediment Control Inspection was made on September 1, 2011 and it was found that portions of this site were not permanently stabilized. Under Section 17 -213 of the Albemarle County Code, this is your NOTICE TO COMPLY. Article 11, section 17 -207 requires permanent vegetation to be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced. County records indicate your project is now beyond this time frame. In order to meet the ordinance and standards, your project needs to establish permanent non- erosive cover or permanent vegetation on all areas of the site. Any rills, gulleys, or stockpiles should be graded smooth. Any debris should be removed. All exposed earth should be covered with a minimum of four (4) inches of compacted topsoil if not already present, and aggressively applied with fertilizer, seed and mulch, stone, sod or other permanent stabilization. Refer to section 3.32 of the Virginia Erosion and Sediment Control Handbook for permanent seeding. All slopes must be flatter than 2:1, and any such slopes should be sodded, matted and hardwood mulched or otherwise landscaped where seeding alone will not suffice. Unless subsequently amended in writing by this office, it is expected that permanent seeding and related measures be in place no later than Sep 14, 2011. A re- inspection fee of $250.00 will be sent to the owner for each re- inspection of this notice. Page 2 Advance Mills Land Trust C/o Mr. Geoff Elsie 195 Riverbend Drive Charlottesville, VA 22911 Under Sections 17 -213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date may have one or more the following results: • You may be issued additional Notices to Comply. A re- inspection fee of $250.00 will be charged for each subsequent Notice to Comply with re- inspection. • Your permit may be revoked. • You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. • The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting from a failure to comply with this notice. Should you have a legitimate reason you can not complete the corrective measures by the above given date, you must immediately contact me at (434) 296 -5832, or Ray Lilly at (434) 989 -1534. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. Sincerely, 04�- � Glenn Brooks, P.E. County Engineer Received by: Date: to •, .. r 1 1 1 � � 1 5 T _ � �`� y e l Y. y: i 'i .f '' .�. ' ry ,. .�'� -� r; . p k I n. t. . y .r. T.{ li t -Vol fi k �x r: r• • •t 'a Y; Alk kx. al q