EROSION CONTROL RE- INSPECTION INVOICE
DATE: March 2, 2012
INVOICE TO: Advance Mill Land Trust (via e -mail)
c/o Charlie Hurt
195 Riverbend Drive
Charlottesville, VA 22911
RE: WPO -2004 -00092
Advance Mills Farm Phase II
DATE OF RE- INSPECTION: 212112012
RE- INSPECTION FEE: $250.00
By April 2, 2012, you should forward the re- inspection fee of $250.00 in order for the County to
release your project. To pay the re- inspection fee, please send a check payable to the County
of Albemarle to my attention along with the enclosed copy of this invoice.
If you should have any questions, please do not hesitate to contact me.
Sincerely
Ana D. Kilmer
Management Analyst
Administration
ADK/
Enclosure
I .DEPT'S D9-*k P'nMAE•IMSPEC[EU14 FEES,WPOZ(*400092 Advahm Mdlt Farm Phase 11 do:
�pk AL{�,
m
`IRGIN�A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
EROSION CONTROL RE- INSPECTION INVOICE
DATE: March 2, 2012
INVOICE TO: Advance Mill Land Trust (via e-mail)
c/o Charlie Hurt
195 Riverbend Drive
Charlottesville, VA 22911
RE: W PO- 2004 -00092
Advance Mills Farm Phase II
DATE OF RE- INSPECTION: 2/21/2012
RE- INSPECTION FEE: $250.00
By April 2, 2012, you should forward the re- inspection fee of $250.00 in order for the County to
release your project. To pay the re- inspection fee, please send a check payable to the County
of Albemarle to my attention along with the enclosed copy of this invoice.
If you should have any questions, please do not hesitate to contact me.
Sincerely
Ana D. Kilmer
Management Analyst
Administration
ADK/
Enclosure
1.0EPi\Community pevclopmentlRE- INSPECTION FEES\WP0200400092 Advance Mills Farm phase it.duc
by A
COUNTY OF ALBEMARLE
1 n•� Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone 434 296 -5832 Fax 434 972 -4126
2 Sep 2011
Advance Mills Land Trust
C/o Mr. Geoff Elsie
195 Riverbend Drive
Charlottesville, VA 22911
91 7108 2133 3937 4122 4327
Re: Erosion and Sediment Control Plan WP02004 -00092
NOTICE TO COMPLY
Dear Mr.Elsie:
An Erosion and Sediment Control Inspection was made on September 1, 2011 and it was found
that portions of this site were not permanently stabilized. Under Section 17 -213 of the Albemarle
County Code, this is your NOTICE TO COMPLY. Article 11, section 17 -207 requires
permanent vegetation to be installed on all denuded areas within nine (9) months after the
date the land disturbing activity commenced. County records indicate your project is
now beyond this time frame.
In order to meet the ordinance and standards, your project needs to establish permanent
non- erosive cover or permanent vegetation on all areas of the site. Any rills, gulleys,
or stockpiles should be graded smooth. Any debris should be removed. All exposed
earth should be covered with a minimum of four (4) inches of compacted topsoil if not
already present, and aggressively applied with fertilizer, seed and mulch, stone, sod or
other permanent stabilization. Refer to section 3.32 of the Virginia Erosion and Sediment
Control Handbook for permanent seeding. All slopes must be flatter than 2:1, and any
such slopes should be sodded, matted and hardwood mulched or otherwise landscaped
where seeding alone will not suffice.
Unless subsequently amended in writing by this office, it is expected that permanent seeding and
related measures be in place no later than Sep 14, 2011. A re- inspection fee of $250.00 will be sent
to the owner for each re- inspection of this notice.
Page 2
Advance Mills Land Trust
C/o Mr. Geoff Elsie
195 Riverbend Drive
Charlottesville, VA 22911
Under Sections 17 -213, 214 and 215 of the Albemarle County Code, failure to make these corrections by
the required date may have one or more the following results:
• You may be issued additional Notices to Comply. A re- inspection fee of $250.00 will be charged for
each subsequent Notice to Comply with re- inspection.
• Your permit may be revoked.
• You may be required to submit a new Erosion and Sediment Control Plan and have it approved before
additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each
submission and it is not unusual for several submissions before the plan can be approved. This
requirement would include a new application, fee and bond for the work proposed under the plan.
• The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit
Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I
misdemeanor and require the property owner to pay any damages resulting from a failure to comply
with this notice.
Should you have a legitimate reason you can not complete the corrective measures by the above given
date, you must immediately contact me at (434) 296 -5832, or Ray Lilly at (434) 989 -1534. Unless you
have contacted us and alternative arrangements have been agreed to in writing, we will expect the
corrections to be completed by the above date.
Sincerely,
04�- �
Glenn Brooks, P.E.
County Engineer
Received by: Date:
to
•,
..
r
1
1
1 � �
1
5
T _
�
�`�
y
e
l
Y.
y:
i
'i
.f
''
.�.
'
ry ,.
.�'� -�
r; .
p
k I n.
t.
. y
.r.
T.{
li
t
-Vol
fi k
�x
r:
r•
• •t
'a
Y;
Alk kx. al
q