RE: SP201000027 Nichols /Peck Crossing
Tax Map 25, Parcel 18
On March 9, 2011, the Albemarle County Board of Supervisors took action on SP #201000027 to all a
Rehab an existing concrete culvert bridge with an engineered bridge that spans the Moorman's River on
Tax Map 25, Parcel 18 in the Whitehall District. This special use permit was approved based on the
following conditions:
The applicant shall obtain approval from FEMA for changes to the floodplain, and update the
FEMA maps;
2. The applicant shall obtain County Engineer approval of plans for the bridges and abutments;
3. The applicant shall obtain Program Authority approval for an erosion and sediment control plan,
and obtain a land disturbance permit according to the Water Protection Ordinance requirements,
regardless of whether the project exceeds the minimum disturbance limits;
4. The applicant shall obtain all necessary federal and state agency approvals prior to construction
(Army Corps of Engineers, Department of Environmental Quality, etc.); and
5. The applicant shall obtain Program Authority approval of a mitigation plan, and provide mitigation
according to the Water Protection Ordinance.
Please be advised that although the Albemarle County Board of Supervisors took action on the
project noted above, no uses on the property as approved above may lawfully begin until all
applicable approvals have been received and conditions have been met. This includes:
• compliance with conditions of the SPECIAL USE PERMIT;
• approval of and compliance with a SITE PLAN amendment; and
• approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not commenced
within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the
permit terminated. The term "commenced" means "construction of any structure necessary to the use of
the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to contact
Ron Higgins at 296 -5832.
Sincerely,
Gerald Gatobu
Principal Planner
Current Development Division
cc: Nichols, Michael K or Reba A Peck
6094 Sugar Hollow Road
Crozet VA 22932 - -2237