Loading...
HomeMy WebLinkAboutSP201000027 Legacy Document 2012-06-19 (4)COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 March 16, 2011 Alan Franklin 111 3rd Street SE Charlottesville, VA 22902 RE: SP201000027 Nichols /Peck Crossing Tax Map 25, Parcel 18 On March 9, 2011, the Albemarle County Board of Supervisors took action on SP #201000027 to all a Rehab an existing concrete culvert bridge with an engineered bridge that spans the Moorman's River on Tax Map 25, Parcel 18 in the Whitehall District. This special use permit was approved based on the following conditions: The applicant shall obtain approval from FEMA for changes to the floodplain, and update the FEMA maps; 2. The applicant shall obtain County Engineer approval of plans for the bridges and abutments; 3. The applicant shall obtain Program Authority approval for an erosion and sediment control plan, and obtain a land disturbance permit according to the Water Protection Ordinance requirements, regardless of whether the project exceeds the minimum disturbance limits; 4. The applicant shall obtain all necessary federal and state agency approvals prior to construction (Army Corps of Engineers, Department of Environmental Quality, etc.); and 5. The applicant shall obtain Program Authority approval of a mitigation plan, and provide mitigation according to the Water Protection Ordinance. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with conditions of the SPECIAL USE PERMIT; • approval of and compliance with a SITE PLAN amendment; and • approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above -noted action, please do not hesitate to contact Ron Higgins at 296 -5832. Sincerely, Gerald Gatobu Principal Planner Current Development Division cc: Nichols, Michael K or Reba A Peck 6094 Sugar Hollow Road Crozet VA 22932 - -2237