Loading...
HomeMy WebLinkAboutSP201000028 Legacy Document 2012-06-21 (9)COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 22, 2011 Virginia Camping Resorts LLC c/o Bryan Nettleton 3825 Red Hill Rd. Charlottesville, VA 22903 RE: SP201000028 Charlottesville KOA TMP 10100- 00- 00 -052A1 Dear Mr. Nettleton: On April 6, 2011, the Albemarle County Board of Supervisors took action on the above referenced special use permit request to bring an existing campground into compliance with the Zoning Ordinance and to add six cabins on the above referenced parcel in the Samuel Miller District. This special use permit was approved based on the following conditions: 1. Development of the use shall be in general accord with the conceptual plan titled "Concept Plan ", prepared by the applicant and submitted November 15, 2010 (hereafter, the "Conceptual Plan "), as determined by the Director of Planning and the Zoning Administrator. To be in general accord with the Conceptual Plan, the development shall reflect the following major elements within the development essential to the design of the development: • Location of the pool and pavilion, the store, the gameroom /laundry, the cabins, travelways, and bathhouse as shown on the Conceptual Plan. Minor modifications to the Plan which do not conflict with the elements above may be made to ensure compliance with the Zoning Ordinance. 2. Written approval from Fire and Rescue Division shall be required prior to the issuance of a zoning clearance and the commencement of the use. 3. Written approval from the Health Department shall be required prior to the issuance of a zoning clearance and the commencement of the use. 4. The use shall conform to the requirements outlined by the Virginia Department of Health Bureau of Tourist Establishment Sanitation. 5. All site lighting exclusively for camp use must either emit 3,000 lumens or less or be full cutoff fixtures. Lighting issues must be resolved prior to the issuance of a zoning clearance for commencement of the use. In addition, the Board approved, by a vote of 6:0, the applicant's request for approval of the existing central water and sewer systems and the establishment of one additional sewer system on the KOA Campground site on this parcel as set forth in the attached plans for a total of 47 connections to the RV central sewerage system, a total of 7 connections to the bath house / cabins central sewerage system, and a total of 77 connections to the central water supply, subject to the following conditions: 1. The applicant shall obtain the approval of its final plans for the central sewerage systems from the County Engineer, the Virginia Department of Health, the Virginia Department of Environmental Quality and other applicable state and federal agencies; and 2. The applicant shall obtain the approval of its final plans for the central water supply from the County Engineer, the Virginia Department of Health, the Virginia Department of Environmental Quality and other applicable state and federal agencies. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with conditions of the SPECIAL USE PERMIT; • compliance with conditions of the CENTRAL WATER AND SEWER SYSTEM APPROVALS; and • approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above -noted action, please do not hesitate to contact Ron Higgins at 296 -5832. Sincerely, V. Wayne Cilimberg Director of Planning Email Cc: Tex Weaver; Ron Higgins File