I'm back in the office after being out sick yesterday.The plat is approved and is ready to be picked up and recorded in
the clerks office.
Thanks
Christopher P. Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Nena [mailto:ulcwww @embargmail.com]
Sent:Tuesday, August 26, 2014 9:33 AM
To: Koppel, Paul
Cc: Christopher Perez
Subject: Re: SUB2014-112 Briarwood - BLA
I tried to check yesterday but Chris Perez was out sick.
Nena Harrell
Count your RAINBOWS not your THUNDERSTORMS
On Aug 26, 2014, at 8:26 AM, "Koppel,Paul" <PKOPPEL@nvrinc.com>wrote:
Chris,
Do you know if the mylars are signed now? We can pick them up today.
Paul Koppel
Production Manager-NVR
P:434-327-1711
F:434-872-0107
pkoppel @nvrinc.com
Ryanhomes I NVHomes
Charlottesville, VA
<image001.png>
1
From: ckean2378@ gmail.com [mailto:ckean2378Cagmail.com] On Behalf Of Chris Kean
Sent: Friday, August 22, 2014 12:46 PM
To: Christopher Perez
Cc: Scott Collins; Koppel, Paul; Nena
Subject: Re: SUB2014-112 Briarwood - BLA
Chris:
The mylars have been signed by the owner and dropped off for county approval. When will they
be available for pick up?
Chris
Christopher B. Kean, L.S.
Vice President
Lincoln Surveying
632 Berkmar Cir.
Charlottesville,Va. 22901
434-974-1417 (o)
434-974-1776 (f)
434-960-2942 (c)
www.lincolnsurveying.com
E
On Wed, Aug 20, 2014 at 4:49 PM, Christopher Perez<cperez @albemarle.org>wrote:
Chris,
The revisions you provided me today at 10:10am via pdf address all my comments. Also,please
assure you provide a revised date on the plat.
Also, I have received Engineering's comments on the plat, see both of their comments below,
please make these corrections and then the plat and then we'll be ready for owner signature/
County approval as ASCA approved the plat yesterday:
1. Recommend Note: The intent of the new variable width drainage easement shown hereon
is that it is to be centered on the Asbuilt location of the drainage line and all of its appurtenances.
2. Revise 7.16' line on boundary between Lots 43 and 44; this length appears inaccurate.
thanks
Christopher P.Perez 1 Senior Planner
Department of Community Development 1County of Albemarle.Virginia
401 McIntire Road 1 Charlottesville,VA 22902
434.296.5832 ext.3443
2
Christopher Perez
From: Christopher Perez
Sent: Wednesday, August 20, 2014 4:50 PM
To: 'Chris Kean'
Cc: Scott Collins; Koppel, Paul; Nena
Subject: RE: SUB2014-112 Briarwood - BLA
Chris,
The revisions you provided me today at 10:10am via pdf address all my comments. Also,pleas ssure you
provide a revised date on the plat.
7oI have received Engineering's comments on the plat, see both of their comments below, please make these
,
rections and then the plat and then we'll be ready for owner signature/County approval as ASCA approved
the plat yesterday:
Kf. Recommend Note: The intent of the new variable width drainage easement shown hereon is that it is to
be centered on the Asbuilt location of the drainage line and all of its appurtenances.
Revise 7.16' line on boundary between Lots 43 and 44; this length appears inaccurate.
thanks
Christopher P. Perez I Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: ckean2378 @gmail.com [mailto:ckean2378 @gmail.com] On Behalf Of Chris Kean
Sent: Wednesday, August 20, 2014 10:10 AM
To: Christopher Perez
Cc: Scott Collins; Koppel, Paul; Nena
Subject: Re: SUB2014-112 Briarwood - BLA
Chris:
Attached is a the revised plat. Below is an outline of the changes made.
• On the plat depict, label, and provide deed book page reference information for the existing sight distance easement
along Lot 46 and Lot 47. Information added. See Sheet 3
• On the plat depict, label, and provide deed book page reference information for the existing waterline easement owned
by ACSA which is located along Lot 46 and Lot 45. Information added. See Sheet 3
• 3) On sheet 2 revise the phasing plan to represent the latest approved phasing plan for Briarwood PRD. Notably a
revised phasing plan was approved on September 4, 2013 by the BOS (see attachment A). Notably these lots are still
located in phase 5, but the phasing plan should be accurately reflected on the BLA plat. Information added. See Sheet
2
Christopher B. Kean, L.S.
Vice President
Lincoln Surveying
1
Christopher Perez
From: Christopher Perez
Sent: Wednesday, August 20, 2014 10:28 AM
To: John Anderson
Subject: FW: SUB2014-112 Briarwood - BLA
Attachments: 110006801 SP 14231_SHEET_1.pdf; 110006801_SP_14231_SHEET_2.pdf; 110006801
_SP_14231__SH_EET_3.pdf
John,
Attached is the revised plat for SUB2014-112 Briarwood—BLA. Please review this version. Thanks
Christopher P.Pere/!Senior Planner
Department of Community Development(County of Albemarle.Virginia
401 McIntire Road I Charlottesville.VA 22902
434.296.5832 ext.3443
From: ckean2378 @gmail.com [mailto:ckean2378 @gmail.com] On Behalf Of Chris Kean
Sent: Wednesday, August 20, 2014 10:10 AM
To: Christopher Perez
Cc: Scott Collins; Koppel, Paul; Nena
Subject: Re: SUB2014-112 Briarwood - BLA
Chris:
Attached is a the revised plat. Below is an outline of the changes made.
• On the plat depict, label, and provide deed book page reference information for the existing sight distance easement
along Lot 46 and Lot 47. Information added. See Sheet 3
• On the plat depict, label, and provide deed book page reference information for the existing waterline easement owned
by ACSA which is located along Lot 46 and Lot 45. Information added. See Sheet 3
• 3) On sheet 2 revise the phasing plan to represent the latest approved phasing plan for Briarwood PRD. Notably a
revised phasing plan was approved on September 4, 2013 by the BOS (see attachment A). Notably these lots are still
located in phase 5, but the phasing plan should be accurately reflected on the BLA plat. Information added. See Sheet
2
Christopher B. Kean, L.S.
Vice President
Lincoln Surveying
632 Berkmar Cir.
Charlottesville, Va. 22901
434-974-1417 (o)
434-974-1776 (f)
434-960-2942 (c)
www.lincolnsurveying.com
1
On Tue;Aug 19, 2014 at 12:52 PM, Chrtopher Perez<cpereza,albemarle.org>w' ote:
Chris,
I have completed my review of the plat(SUB2014-112),below are my comments. They are also available in
Countyview. Please note Engineering has yet to provide me comments on the plat. Once they are provided I'll
forward them to you, they estimate they will have their review completed by COB or early tomorrow.
1) On the plat depict, label, and provide deed book page reference information for the existing sight distance
easement along Lot 46 and Lot 47.
2) On the plat depict, label, and provide deed book page reference information for the existing waterline
easement owned by ACSA which is located along Lot 46 and Lot 45.
3) On sheet 2 revise the phasing plan to represent the latest approved phasing plan for Briarwood PRD.Notably
a revised phasing plan was approved on September 4, 2013 by the BOS (see attachment A). Notably these lots
are still located in phase 5,but the phasing plan should be accurately reflected on the BLA plat.
Thanks
Christopher P.Perez(Senior Planner
Department of Community Development(County of Albemarle.Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Christopher Perez
Sent: Tuesday, August 19, 2014 12:46 PM
To: 'Koppel, Paul'
Cc: David Benish; Scott Collins; John Anderson
Subject: RE: SUB2014-112 Briarwood - BLA
Paul,
I have completed my review of the plat (SUB2014-112),below are my comments. Please note Engineering has
yet to provide me comments on the plat. Once they are provided I'll forward them to you, they estimate they will
have their review completed by COB or early tomorrow. Thanks
1) On the plat depict, label, and provide deed book page reference information for the existing sight distance
easement along Lot 46 and Lot 47.
2) On the plat depict, label, and provide deed book page reference information for the existing waterline
easement owned by ACSA which is located along Lot 46 and Lot 45.
3) On sheet 2 revise the phasing plan to represent the latest approved phasing plan for Briarwood PRD.Notably
a revised phasing plan was approved on September 4, 2013 by the BOS (see attachment A). Notably these lots
are still located in phase 5, but the phasing plan should be accurately reflected on the BLA plat.
2
Christopher P.Perez Senior Planner %low
1:)epartment of Community Development(County of Albemarle.Virginia
401 McIntire Road Charlottesville,VA 22902
434.296.5832 ext.3443
From: Koppel, Paul [mailto:PKOPPELCanvrinc.com]
Sent: Tuesday, August 19, 2014 10:05 AM
To: Christopher Perez
Cc: Scott Collins
Subject: RE: SUB2014-112 Briarwood - BLA
Chris,
Are there any more comments on this submission?
Paul Koppel
Production Manager-NVR
P:434-327-1711
F:434-872-0107
pkoppel @nvrinc.com
Ryanhomes j NVHomes
Charlottesville, VA
INVRI
From: Christopher Perez [mailto:cperez(aalbemarle.orq]
Sent: Thursday, August 07, 2014 11:53 AM
To: Koppel, Paul
Cc: Scott Collins
Subject: SUB2014-112 Briarwood - BLA
Paul,
SUB2014-112 Briarwood-BLA
In reference to your call to me today.
3
Attached are ACSA comments which I rViceived yesterday. Their comment seem rnd of substantial, but I may
be wrong.
Otherwise, I'm awaiting Engineering to complete their review of the proposal due to drainage easement
modifications. Also, my review of the plat is pending. I hope to get to it asap.
It may be pertinent to contact ACSA and begin working their issues out in the mean time.
Christopher P. Perez Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road !Charlottesville,VA 22902
434.296.5832 ext.3443
4
Christopher Perez
From: David Benish
Sent: Tuesday, August 12, 2014 5:14 PM
To: Murphy, Pamela
Cc: Christopher Perez
Subject: RE: Following up on Application SUB201400112
Pam,
There do not appear to be any final comments completed or ready for distribution at thistime (there are some rough
draft comments on one of the plats,so he has been reviewing BLA/plat) . I think it would best to wait until Christopher
returns since he is in the process of reviewing the plat. I do not think I can transfer it to another planner and have them
get you any comments any sooner than waiting for Chris to finish up his review. Sorry for the delay.
David
From: Murphy, Pamela [mailto:pamurphy @ nvrinc.com]
Sent:Tuesday, August 12, 2014 4:50 PM
To: David Benish
Cc: Koppel, Paul
Subject: Following up on Application SUB201400112
Hi,
I am interested in learning the status of the plat review. It seems that comments were due on 8/5 from Chris Perez and I
found out he is out on vaction this week.
Do you know if his comments are competed? If not,do we need to wait for him to come back from vacation?
Thanks
Pam
1
H
lie y,
ALBEMARLL.
COUNTY VIRGIN IA county Home
f4�
% riarmit s ' / %/ ,/f xx .y
,',,, f,l
,J.,SS;.
Planning Application Information
APP€ICATION INFORMATION
Nawigat
Application= 5UB20140 0112 I would ilk
Project Name Briarwood Subdivision BLA
Application Type Subdivision Plat
Project Description
ri-;--Cell
(.o ur
•
REVIEWS
I would like 1
Review Coordinator Christopher Perez . Site Inspector . APi
Reviewer ID Submittal Type Group or Agency Status Received Due
'' .her"€Perez`'° ..' al Plat fit,. :. .o,e,.0 s ,:...- - 1a #'!;
Alexander Morrison Final Plat ACSA Requested Changes 7/16/2014 12
John Anderson Final Plat Engineering Pending 7/16/2014 12.
i
2
Pam Murphy
Project Administrator
P:434-327-1712
F:434-872-0107
Pamurohy @nvrinc.com
www.ryanhomes.com
Ryanhomes ( NVHomes
1885 Seminole Trail
Suite 201
Charlottesville,VA 22901
This email is
confidential and intended solely for the use of the individual to whom it is addressed. If you have received this
email in error please contact the sender and be advised that any use, dissemination, forwarding, printing, or
copying of this email is strictly prohibited. The terms for the purchase and sale of any property referenced in
this email shall be solely determined by a ratified Purchase Agreement. Any information provided in this email,
including but not limited to,pricing, financing, features of a property and/or community, is not to be construed
as the basis of the bargain for the purchase and sale of any such property.
3
Christopher Perez
From: Scott Collins [scott@collins-engineering.com]
Sent: Thursday, August 07, 2014 12:10 PM
To: Alex Morrison; Christopher Perez
Cc: Koppel, Paul
Subject: FW: SUB2014-112 Briarwood - BLA
Attachments: Briarwood reconfigure of lots 43-46.pdf
Alex-
Thanks for sending over the comments for the sanitary sewer at Briarwood associated with the Briarwood plat. A year
ago,we looked at making some modifications to the sanitary sewer and lot alignments. The sewer plans were sent to
the owner for review and the plat was processed. However,the owner never followed up with the sewer revisions and
thus the sewer was constructed in the same location from the original site plan for Briarwood Drive, but the sewer
easement was platted with the subdivision plat as shifted. This BLA just cleans up this issue and adjusts the lots and lot
lines to be located over the easement and not in the middle of the lot. The sewer location is not changing,and it has
already been installed and tested.
I apologize for the confusion, and hopefully this cleans up this issue. We are platting the easement over the existing
sanitary sewer. I have included an exhibit of the asbuilt of the sewer so you can see what is going on.
Let me know if you have any questions about it.
Thanks Alex!
Scott
From:Christopher Perez [mailto:cperezPalbemarle.org]
Sent:Thursday,August 07, 2014 11:53 AM
To: pkoppel @nvrinc.com
Cc:Scott Collins
Subject:SUB2014-112 Briarwood - BLA
Paul,
SUB2014-112 Briarwood-BLA
In reference to your call to me today.
Attached are ACSA comments which I received yesterday. Their comment seem kind of substantial, but I may be wrong.
Otherwise, I'm awaiting Engineering to complete their review of the proposal due to drainage easement modifications.
Also, my review of the plat is pending. I hope to get to it asap.
It may be pertinent to contact ACSA and begin working their issues out in the mean time.
Christopher P.Perez I Senior Planner
Department of Community Development'County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296. 832 ext.3443
1
440.00' ,01000'
.'
tr."-, 6 6
IIw
z>656,
off ®aN • `B P 9
44 "'-':',i',83,^';',g
o
N 1�
63.
VD I'�..
vi
•
Z?-I / i
F •
. L0 r -
DI S ! /9R .. , J� 4r„�C.
®� 1 ®
/ /S / , Q � � e�dlp a§
D-�Z� /
o Bg y
��\/
n D L N /� • C
/I • Sr s
• ,s'0,,,,,
4,5
J
mII I I II . '\A -r L-.2 u / 30 3 � R u+ D
N O/ T ?o rn ♦v AY/ D1 n F3,--- �„,
K o3 5 0' ie� ...0
>
6.
/yp♦
Z
ti a t c n ''''3-A
fr 4: / /
7
r /n _ n = Q
of / I /♦ �
C'''' --r 1--...22 7,P01 , /
O "WRC% / it y / /
D /EC /
o
U m /
mh 0 ` 5p' B / .,� \ D
o Dv
// cD
� ♦N �/ j A
cn
\ / p / / 'ep/
♦.
V>
m
/./ / \Y � / , v Om
C \\0 / mW
/
-0,--O \3. / /
N
vm a
--.., i fo, y° �
.S
/
• o 6.� /
�/ ----f. ~ ;68 -- :::._ __ C a Q 3$0 ../ /
ill, 42.0: _• . 4 - „� r1 w v1 .•
o®1.379 pC. r z °e °
' A OC x Fr'T a i.. I a ON ° O\o
/0 \
\0a\/ I$..lq ; vm O I
� u N �
N . \ / /RC.
\
Ir
e
m _ \ \s '
\
6'SBL O. 0 �
o F SO2'04'26"W
11 6. ----- 0 - / 1., 0 '..-
6'SBL O /J>,
1 , ° a I O /> •
q 0
onq;�DU mAZ ti y�w C)- j o "°°
u nom N O &�
0, ♦in -9c O
m y
-Z
! I: .U NA
o •i N. 8 Sbl _ .N
n `°,F '04'28"E •U' i D
m O 111.67
6 S O S131 ® I'I