Project Name: Belvedere Phase IIB- Preliminary Preliminary Plat
Date Completed: Saturday. ALIgust 301. 20114
Reviewer: Robbie Gilmer
DepartmentFDivisioWAgency: Fire Rescue
Reviews Comments:
Based on plans dated 7!21 ?14
11- Belvedere Boulevard shall be 20 ft FC /FC both directions.
2_ Streets 20 ft FCfFC to 29 ft FC /FC shall have both sides marked "No Parking Fire Lane" so noted on page 6
I Streets 29 ft FCfFC to 36 ft FCIFC shall have one side marked "No Parking Fire Lane" so noted on page 6
4_ When marking the streets with paint for No Parking the color of red needs to be VDOT approved Red_
5_ Any alleyways that will have Carriage Houses on them shall have an approved 20 Ft Access ways
Review Status:
Requested Changes
n
C
Rage: 1 County of Albemarle On: 14M.2015
Review Comments
Project Name: Belvedere Phase IIB- Preliminary Preliminary Plat
Date Completed: Friday. August 29. 2014
Reviewer: Max Greene a
DepartmentiDivisioWAgency: Engineering
Reviews Comments:
'Proposal does not appear to match rezoning application plan-
, parking requirements for SP200700054 SOCAAII Weather Synthetic Field does not appear to be addressed per
Executive Summary-
'The existing entrance area for Belvedere Boulevard may need to be widened-
'North Arrow is missing from existing conditions page-
'Show Critical slopes on the initial subdivision plat..
'Proposed Stormwater Management Facility in 100' reservation may need to be moved if Borth Free State Road Extension
is still in the County Comprehensive Plan.
'Bartlett Avenue May need to be moved out of the 100' Reservation if North Free State Road Extension is still in the
County Comprehensive Plan_
'The property line on lots 48,49 & 50 appears to be missing behind the sidewalk.
'Sight easements will be required for all lines of sight not within the proposed right of way-
'Roads will be built and accepted into the State System or Bonded for construction prior to final plat approval.
'VSMP plans will be approved prior to final plat approval_
'Actual existing topography will be required for the VSMP plans.
'Additional drainage system and inlets may be required prior to final plat approval.
Review Status:
Requested Changes I ' I