Loading...
HomeMy WebLinkAboutSUB201400208 Checklist - Project Closeout (Administrative) 2014-12-09 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and status .bet. CDA will forward to the Imaging Center for digital closeout. SDP SUB # ::',13 1"1 d'OQ PROJECT TITLE 4-L,,_ „Ths,,s, — 3 LA- FULL NAME OF LEAD REVIEWER 0/14'N PeAse.Z FINAL ACTION DATE: 1 -9-)Lf Cou View— Application, Page 2 Data Entered Hardcopy — File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). ! Please check each item included in this folder. To indicate that an item is not applicable to this file, place an "N/A" I next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide i clarity to the file, please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the i document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/name)of the document in the space provided. N rmation/documentation ❑ can El Saved location ,..EAppli t.t•.n(signature copy) L'a Scan ❑ Saved location i ' . . ' •• - :• - .rds/Abutting Owner correspondence ❑ an El Saved location ykonFi r. ' .. • : - 4. orrespondence(to/from, memos/emails) &!i Scan ❑ Saved location • . - _ :.:1 . inted Review Comments El Scan NI Saved location 1,...Ericppro1J i plan/pla signet, o stamped "Approved"with Planner/Engineer name) J Scan • Saved location trative Approval) El Scan ❑ Saved location rl White EfweIepe- PC/BOS Meeting Package- Staff Report(include plan/plat presented, PC/BOS Action Letter) El Scan ❑ Saved location er Assessments ❑ Scan El Saved location El Other(Please explain—i.e. Studies) El Scan El Saved location 0 Other(Please explain—i.e. Studies) El Scan El Saved location ❑ At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location Additional Information on this nrniect! 1