HomeMy WebLinkAboutWPO201500005 Bond Estimates 2015-04-16Project Name: Land Fill Capping for 5th street Station WPO file number: WP0201500005 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stal lization (PS, TS) 6.4 acres $5,000.00 $32,000.00 all fence (81F) 6150 it $5.00 $30,750.00 safety fence(SAF) Oft $5.00 $0.00 diversion (DD, FD, RW D) 500 it $13.00 $6,500.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 earthwork for trap /basin height of dam at ice 6 ft cut at high side 2 it height of fill at face 6 ft cut at face 3 it length of dam 100 ft length of cut 60 it lap width 3 it width of cut 10 it (area above transition) 90 sf (area below transition) 48 sf (total width of dam) 12 ft (total width of cut) 20 fl (height below transition) 0 ft (depth below lransitior -1 ft (area below transition) 0 sf (area above transition) -11 sf (total fill volume) 3333 cy (total fill volume) 82.2 cy length of spillway 15 It (TOAL CY estimate) 361 cy $13.00 $4,693.00 width of spillway 10 It (spillway stone tons) 8.6 tons $50.00 $430.00 earthwork for trap /basin height of dam at ice 6 It cut at high side M % height of fill at face 6 % cut at face 6 it length of dam 100 % length of cut 60 % lap width 3 It width of cut 15 it (area above transitlon) 90 at (area below transition) 162 sf (total width of dam) 12 ft (total width of cut) 31 ft (height below transition) 0 ft (depth below lransitior -4 ft (area below transition) 0 at (area above transition) -78 sf (total flit volume) 3333 cy (total fill volume) 186.7 cy length of spillway ' 15 % (TOAL CV estimate) 396 cy $13.00 $5,148.00 width of spillway 10% (spillway stone tons) 8.6 tons $50.00 $430.00 protection stone $100.00 $0.00 stone inlet protection (IP) inlet pr (IP) $200.00 $3,600.00 outlet protection (OP) length 15 it width 10 ft $675.00 $1,350.00 channel (SCC, matted) length 0 it width 0 ft $0.00 check dam depth in channel 0 it channel width 0 ft 0 $0.00 $0.00 construction entrance (CE) 1 $2,000.00 $2,000.00 wash rack 1 $2,000.00 $2,000.00 paved construction entrance $3,500.00 $0.00 rip-rap, placed depth 0 it length 0 ft width 0 (tons) 0 tons $60.00 $0.00 uri and layout (price par 0.1 mi.) acres 6.4 traps and basins 2 $4,200.00 mobilization $500.00 stream crossing (computed independently) $0.00 cost sum $93,601.00 prof mgmt $14,040.15 contingency $10,764.12 Total $118,410 4/16/2015 Approximate Earthwork computations for sediment traps and basins Assumes all cut and fill slopes are 2:1 for simplicty Top Width Height of Fill at Face vv h1 Cut at High Side h2 transition point w h1 Width of Cut Cut at Face Fill area above transition = h1 (2h1) + hl (w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width height) /2 - height x height Length of Cut Height of Dam at Toe . h2 Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately) Approximate Earthwork computations for sediment traps and basins Assumes all cut and fill slopes are 2:1 for simplicty Top Width Height of Fill at Face vv h1 Cut at High Side h2 transition point w h1 Width of Cut Cut at Face Fill area above transition = h1 (2h1) + hl (w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width height) /2 - height x height Length of Cut Height of Dam at Toe . h2 Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately) Approximate Earthwork computations for sediment traps and basins Assumes all cut and fill slopes are 2:1 for simplicty Top Width Height of Fill at Face vv h1 Cut at High Side h2 transition point w h1 Width of Cut Cut at Face Fill area above transition = h1 (2h1) + hl (w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width height) /2 - height x height Length of Cut Height of Dam at Toe . h2 Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately) Approximate Earthwork computations for sediment traps and basins Assumes all cut and fill slopes are 2:1 for simplicty Top Width Height of Fill at Face vv h1 Cut at High Side h2 transition point w h1 Width of Cut Cut at Face Fill area above transition = h1 (2h1) + hl (w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width height) /2 - height x height Length of Cut Height of Dam at Toe . h2 Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)