Loading...
HomeMy WebLinkAboutSUB201400197 Bond Estimates 2015-04-22Subdivision Name: Road Plan Amendment for Hyland Ridge Subdivision (Phase 2) Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201400197 Item Road Name: Hyland Creek Drive station 10 +00 to 23 +04 aggregate base blotted or prime &double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6) ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48 ") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) C:\ Users \mgreene \Documents \A_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_ bond _est_Phase 2only_22April2015.xlsx 4/22/2015 No. Unit Unit Cost Cost installed % compete cost remaining road length 1304.0 ft 6.0 in d 1304.0 ft L 28.0 ft W 1277.9 ton $25.00 $31,948.00 0% $31,948.00 1304.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 3.0 in d 1304.0 ft L 28.0 ft W 670.9 tons $84.58 $56,745.40 0% $56,745.40 1.5 in d 1304.0 ft L 28.0 ft W 335.5 tons $91.34 $30,640.37 0% $30,640.37 0.0 ft $13.00 $0.00 0% $0.00 2608.0 ft $15.00 $39,120.00 0% $39,120.00 2608.0 ft $17.00 $44,336.00 0% $44,336.00 0 ft $350.00 $0.00 0% $0.00 1 each $200.00 $200.00 0% $200.00 2 each $200.00 $400.00 0% $400.00 0 Each 0 each $150.00 $0.00 0% $0.00 0 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 24 each $3,500.00 $84,000.00 0% $84,000.00 2 each $500.00 $1,000.00 0% $1,000.00 193 ft $450.00 $86,850.00 0% $86,850.00 15.0 in d 0 ES -1,2 0 EC -1 977.0 ft $35.00 $34,195.00 0% $34,195.00 18.0 in d 0 ES -1,2 0 EC -1 130.0 ft $40.00 $5,200.00 0% $5,200.00 24.0 in d 0 ES -1,2 0 EC-1 650.0 ft $50.00 $32,500.00 0% $32,500.00 30.0 in d 0 ES -1,2 0 EC-1 132.0 ft $65.00 $8,580.00 0% $8,580.00 36.0 in d 1 ES -1,2 1 EC-1 75.0 ft $70.00 $6,250.00 0% $6,250.00 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 0.0 cy $4.00 $0.00 0% $0.00 0.0 cy $9.00 $0.00 0% $0.00 1304.0 ft L 0.24697 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 1304.0 ft L 0.24697 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 1 Isum $500.00 $500.00 0% $500.00 1304.0 ft L 2.608 inc of 500' 4 each $200.00 $740.00 0% $740.00 1304.0 ft L 2.608 inc of 500' 4 each $200.00 $740.00 0% $740.00 1304.0 ft L 2.608 inc of 500' 4 each $200.00 $740.00 0% $740.00 1304.0 ft L 2.608 inc of 500' 4 each $200.00 $740.00 0% $740.00 1304.0 ft L 2.608 inc of 500' 4 each $200.00 $740.00 0% $740.00 0 ft $2.00 $0.00 0% $0.00 1304.0 ft L 0.24697 mi. 2 Lanes $2,000.00 $9,878.79 0% $9,878.79 1304.0 ft L 0.24697 mi. 2 Lanes $150.00 $740.91 0% $740.91 1304.0 ft L 0.24697 mi. 2 Lanes $100.00 $743.94 0% $743.94 $491,528.40 $491,528.40 cost sum proj mgmt $24,576.42 $24,576.42 C:\ Users \mgreene \Documents \A_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_ bond _est_Phase 2only_22April2015.xlsx 4/22/2015 Subdivision Name: Road Plan Amendment for Hyland Ridge Subdivision (Phase 2) Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201400197 Item No. Unit Unit Cost Cost installed % compete cost remaining Road Name: Hyland Creek Drive contingency $24,576.42 $24,576.42 Total $540,690 $540,690 C:\ Users \mgreene \Documents\A_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_bond_est_Phase 2only_22April2015.xlsx 4/22/2015