Loading...
HomeMy WebLinkAboutWPO201300045 Application Stormwater Management Plan 2013-06-25Application Number I Project Name I TMP I CurrentStatus 1 WPO201300045 Lochlyn Hill - Phase 1A & 1 061A000000020 Void Albemarle CoL „,,`y Community Development Department 4011ClIerntire Road Charlottesville,VA 22902-4596 a • u,. Planning Application Voice:(434)296-5832 Fax:(434)972-4126 PARCEL/ OWNER INFORMATION r-MP) 061A0-00-00-00200 Owner(s): Application # WP0201300045 MEADOWCREEK DEVELOPMENT LLC PROPERTY INFORMATION Legal Description ACREAGE Magisterial Dist. Rio Land Use Primary Residential --Single-family (incl. modular homes) Current AFD Not in A/F District Current Zoning Primary R4 Residential APPLICATION INFORMATION Street Address 1155 PEN PARK LN CHARLOTTESVILLE, 22901 Entered By Application Type Water Protection Ordinances Todd Shifflett 106/25/2013 Project Lochlyn Hill - Phase 1A& 1B Received Date 06/24/13 Received Date Final Submittal Date Total Fees 600 Closing File Date Submittal Date Final Total Paid 600 Revision Number Comments Legal Ad SUB APPLICATION(s) Type Sub Applicati I Comment Erosion and Sediment Control Plan Stormwater Management/BMP Plan APPLICANT/ CONTACT INFORMATION ContactType J Name I Address I CityState I Zip I Phone ] PhoneCell Owner/Applicant ;MEADOWCREEK DEVELOPMENT LLC 1239 CHESTNUT OAK W- iCHARLOTTESVILL 122903-96' Primary Contact SCOTT COLLINS - COLLINS ENGINEERIN 200 GARRETT STREET,SUITE CHARLOTTESVILL 22902 4342933719 General Contractor MILESTONE PARTNERS 300 2ND STREET NE CHARLOTTESVILL 22902 Plan Preparer COLLINS ENGINEERING Signature of Contractor or Authorized Agent Date Aication for Review of*."t Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & L ;, Stream Buffer Mitigation Plan Itg Erosion& Sediment Control Plan SI Stormwater Management/BMP Plan Stream Buffer Mitigation Plan E&S Plan Amendment SWM Plan Amendment Previous Plan# Previous Plan# E&S Plan with Variance Request for Exception of Variances SWM Plan Resubmittal E&S Plan Resubmittal WPO Application# WPO Application# Submit 2 copies each of applicable plans/narrative/computations When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Project Name: Le.41 y n HI II - Rik;e ilk -- I Tax map and parcel: OA`2 /,'i A - i--3413 Zoning: E4 Amount of Land Disturbance: i3.`. Acres Location of property(landmarks,intersections,or other): ekt FAA- Lori e Contact Person(Who should we call/write concerning this project?): S cC 4 a/CiiiS t—! l[itYt, `i'/YICSt.'Yt nG Address 'CC C'74vre Sireelt- Su.;1e K City Chak1c11 esi:Ile State I/ / Zip ,`,2-rJo' Daytime Phone(4 ;1& •57i4/ Fax#( )E-mail ,}CC ii-et) 17,11s -- e .eerfr/t tv J Owner of Record 11Cu /cJ(Ye4 evi f'r1en La': Address 2t ( hest nu,1-- 6wk e, City State 1/14 Zip ,2 7t Daytime Phone( )Fax#( )E-mail Contractor ,k4 ilt%3 fine Par h is 1 Address 5(t 'i' JfT t't"t NE. City C{2 Vii e.;t I 1 t State <c Zip m;4,Ic.G Daytime Phone( )Fax#( )E-mail Plan Preparer C 4 L1tilS ill%i\Aec(t'r Address ill City State Zip Daytime Phone( )Fax#( )E-mail Owner/Applicant Must Read and Sign By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater Management/BMP Plan,and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure comp iancewith the approved pl n. Si lure o er Contract Datt L -3 1.c`7e L u— 3e/-2 yS -5-g/63 Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY WPO# Ip//yyr, CC 1 I'vti--LJFeeAmount$ LAX) Date Paid W I sy who? 1 t UL Receipt# I WO Ck# r'+ By: l a 13 j l Revised November 14,2011 Page 1 of 3 EROSION CONTROL PLAN: (SUBMIT 2 COPIES) Land disturbing activity pertaining to single family dwelling unit: 1. Plan Review 150 per review TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 2 Permit and First Year Inspection Fees 150 TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 3. Annual Permit Renewal and Inspection Fees 150 TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 4. Each reinspection 150 REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) Land disturbing activity pertaining to non-exempt agricultural land: 5. Plan Review 150 per review TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 6. Permit and First Year Inspection Fees 150 TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 7. Annual Permit Renewal and Inspection Fees 150 TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 8. Each reinspection 150 REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) All other land disturbing activity: 9. Plan Review, Disturbed Area Less Than One Acre 150 per review TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 10. Permit and First Year Inspection Fees, Disturbed Area Less Than One Acre 200 TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 11. Annual Permit Renewal and Inspection Fees, Disturbed Area Less Than One Acre $200 TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 12. Plan Review,Disturbed Area One Acre or Larger 300 per reviewTOBEPAIDATTIMEOFAPPLICATIONANDEACHSUBMITTALTHEREAFTERUNTILAPPROVAL) 13. Permit and First Year Inspection Fees, Disturbed Area One Acre or Larger 100/per disturbed acre TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION CONTROL PERMIT) 14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger 100/per disturbed acre TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED PLAN REQUIREMENTS) 15. Each reinspection 250 REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 16. Amendment to Approved Plan 180/per plan review TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 17. Variances 150/per request TO BE PAID AT TIME OF APPLICATION) 18. SUBTOTAL EROSION CONTROL PLAN 5+r'C Revised November 14,2011 Page 2 of 3 STORMWATER MANAGEMENTBMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES) 19. Stormwater Management/BMP Plan. 300/per plan r ie TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 20. Major Amendment of Plan 180/per plan review TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL) 21. Request for exception 240 TO BE PAID AT TIME OF APPLICATION) 22. Request for development in a stream buffer or for reduction or modification of stream buffer and mitigation plan(if not part of another document)—Single family dwelling unit or accessory structure 85 TO BE PAID AT TIME OF APPLICATION) 23. Each inspection or reinspection 60 INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER) 24. Mitigation Plan 150 TO BE PAID AT TIME OF APPLICATION) 25. SUBTOTAL SWM/BMP PLAN 3CcC TOTAL APPLICATION FEE: (Add lines 18 and 25) co THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAY BE CHARGED TO THIS PROJECT. Revised November 14,2011 Page 3 of 3