Loading...
HomeMy WebLinkAboutARB201400140 Certificate of Appropriateness 2015-01-26COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 January 26, 2015 Ryan Lorey Edens 7200 Wisconsin Ave Ste 400 Bethesda, MD 20814 RE: ARB -2014-140: The Shops at Stonefield Phase 2 Block G Dear Ryan, I have reviewed the plans listed on the following page, submitted for the above referenced project. The changes made in these plans address the conditions of approval outlined at the ARB meeting held on January 20, 2015. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. 2. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3 years. Applicants requesting an extension of the period of validity must do so in writing. The letter must be received by the Director of Planning prior to the expiration date. If you have any questions, please do not hesitate to call. Sincerely, Margaret Maliszewski Principal Planner cc: ARB -2014-140 Sheet # Drawing Revision Date 10 Cover Sheet 2-6-2015 12 Comment Responses & Narrative 2-6-2015 C6 Existing Conditions & Demolition Plan 2-6-2015 C7 Site Layout Plan 2-6-2015 C8 Grading and Drainage Plan 2-6-2015 C9 Water & Sanitary Sewer Layout Plan 2-6-2015 C-22 Landscape Plan 2-2-2015 C-23 Landscape Details 2-2-2015 LT1 Site Lighting 2-6-2015 LT2 Site Lighting 2-6-2015 AO Material Schedule and Key Plan 2-6-2015 Al Building G 1 2-6-2015 A2 Building G2 2-6-2015 A3 Building G3 2-6-2015 A4 Building G4 2-6-2015 A5 Entrance Corridor Views 2-6-2015 A00 Com rehensive Sign Plan 3-6-2015 CSP -1 Com rehensive Sign Plan 4-1-2015 CSP -2 Comprehensive Sign Plan 4-1-2015