Loading...
HomeMy WebLinkAboutWPO201400100 Bond Estimates 2015-05-07Project Name: Farmington Country Club Dump Regrading Plan WPO file number: wpo201400100 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp. crop (15 to 48 ") aggregate base or drainage stone sadhwnrk for trap/basin structures for basin 0.0 in d 1.0 in d height of dam at toe height of 611 at face length of dam top width (area above transition) (total width of tlam) (height below transition (area below transition) (total fill volume) length of spillway width of spillway door height riser diameter barrel length barrel diameter trees shrubs seedlings underdrain(LF) bloflter soil mix (Cy) trash rack) and vortex devices Pressure Treated Timber Level Spreader maintenance access road (LF) rip-rap, placed depth width survey and layout (price per 0.1 mi.) acres mobiliretion as-built orawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contracta"s price as a base) 16 ft length 0 ft length ft length 0.0 ft 0.0 (tons) 0 1 basins 0 No. Unit Unit Cost Cost (installed) 160 ft $13.00 $2,080.00 0 ea $500.00 $0.00 0 as $3,500.00 $0.00 0 ft $450.00 $0.00 0.0 ft $0.00 $0.00 0.0 ton $35.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 as 0 ES -1,2 0 EC -1 0 as 45.0 ftL 450 ftW 10 ft cut at high side 0 ft 0 ft cut at face 0 ft 0 ft length of cut 0 ft 0 ft width of cut 0 ft 0 of (area below transition) 0 of 20 ft (total width of cut) 0 ft 10 fl (depth below transition 0 ft 0 of (area above transition) 0 of 0.0 cy (total 611 volume) 00 cY 0 ft (TOAL CV estimate) 0 cY 0 ft (spillway stone tons) 0 tons Oft $5,000.00 $0.00 0 in (near unit price) $000 0 ft base plate or Win 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft 16 ft length 0 ft length ft length 0.0 ft 0.0 (tons) 0 1 basins 0 No. Unit Unit Cost Cost (installed) 160 ft $13.00 $2,080.00 0 ea $500.00 $0.00 0 as $3,500.00 $0.00 0 ft $450.00 $0.00 0.0 ft $0.00 $0.00 0.0 ton $35.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 as $150.00 $0.00 0 as $50.00 $0.00 0 as $5.00 $0.00 0 ft $5.00 $0.00 0 cy $38.00 $0.00 0 ft $1,500.00 $0.00 20 as $200.00 54,000.00 0 ft $50.00 $0.00 $60.00 $0.00 $500.00 $500.00 1 as $2,000.00 $2,000.00 0 as $2,000.00 $0.00 0 as $5,000.00 $0.00 SIMIll cost sum $9,080.00 pmt mgmf $1,362.00 contingency $1,044.20 Total $11,490 51712015