HomeMy WebLinkAboutWPO201400100 Bond Estimates 2015-05-07Project Name: Farmington Country Club Dump Regrading Plan
WPO file number: wpo201400100
Stormwater Management Plan Bond Estimate
Item Item
Number
permanent diversion or ditch
standard manhole frame top (not inlet)
drop inlet or grate
manhole structure (per ft. rise)
pipe, rcp. crop (15 to 48 ")
aggregate base or drainage stone
sadhwnrk for trap/basin
structures for basin
0.0 in d
1.0 in d
height of dam at toe
height of 611 at face
length of dam
top width
(area above transition)
(total width of tlam)
(height below transition
(area below transition)
(total fill volume)
length of spillway
width of spillway
door height
riser diameter
barrel length
barrel diameter
trees
shrubs
seedlings
underdrain(LF)
bloflter soil mix (Cy)
trash rack) and vortex devices
Pressure Treated Timber Level Spreader
maintenance access road (LF)
rip-rap, placed depth
width
survey and layout (price per 0.1 mi.) acres
mobiliretion
as-built orawings (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contracta"s price as a base)
16 ft length
0 ft length
ft length 0.0 ft
0.0 (tons) 0
1 basins 0
No. Unit Unit Cost Cost
(installed)
160 ft $13.00 $2,080.00
0 ea $500.00 $0.00
0 as $3,500.00 $0.00
0 ft $450.00 $0.00
0.0 ft $0.00 $0.00
0.0 ton $35.00 $0.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
0 as
0 ES -1,2
0 EC -1
0 as
45.0 ftL
450 ftW
10 ft
cut at high side
0 ft
0 ft
cut at face
0 ft
0 ft
length of cut
0 ft
0 ft
width of cut
0 ft
0 of
(area below transition)
0 of
20 ft
(total width of cut)
0 ft
10 fl
(depth below transition
0 ft
0 of
(area above transition)
0 of
0.0 cy
(total 611 volume)
00 cY
0 ft
(TOAL CV estimate)
0 cY
0 ft
(spillway stone tons)
0 tons
Oft
$5,000.00
$0.00
0 in
(near unit price)
$000
0 ft
base plate or Win
0
0 in
(barrel unit price)
$0.00
barrel collars
0
baffle length
0 ft
16 ft length
0 ft length
ft length 0.0 ft
0.0 (tons) 0
1 basins 0
No. Unit Unit Cost Cost
(installed)
160 ft $13.00 $2,080.00
0 ea $500.00 $0.00
0 as $3,500.00 $0.00
0 ft $450.00 $0.00
0.0 ft $0.00 $0.00
0.0 ton $35.00 $0.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
0 as
$150.00
$0.00
0 as
$50.00
$0.00
0 as
$5.00
$0.00
0 ft
$5.00
$0.00
0 cy
$38.00
$0.00
0 ft
$1,500.00
$0.00
20 as
$200.00
54,000.00
0 ft
$50.00
$0.00
$60.00
$0.00
$500.00
$500.00
1 as
$2,000.00
$2,000.00
0 as
$2,000.00
$0.00
0 as
$5,000.00
$0.00
SIMIll
cost sum $9,080.00
pmt mgmf $1,362.00
contingency $1,044.20
Total $11,490
51712015