Loading...
HomeMy WebLinkAboutWPO201400096 Approval - County 2015-05-08�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Stonefield Block D2 - VSMP WW Associates Albemarle Place EAAP, LLC 5 May 2015 8 May 2015 Michelle Roberge County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1) The DEQ permit for this area is VAR 100061. Please include all approved E &S and PPP plans with SWPP on site. Comment acknowledged. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1) Provide an 11" x 17" PPP for this area. Comment addressed, but remove the full buildout shown on the plan. Only show what is approved on this plan. Our inspector will check PPP onsite. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved. The stormwater management plan content requirements can be found in County Code section 17 -403. 1) This is an interim plan only and a stockpile onsite is being proposed. There is a pending review for the full buildout plan. Please note the full - buildout proposal will amend this plan and should be titled "VSMP amendment." This WPO application will be relabeled as WP02014 -96. Comment addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved. 1) Provide anti -seep collar or alternatives to anti -seep collar. Engineering Review Comments Page 2 of 2 Comment addressed. 2) Add a note for connection of barrel to riser. "Connections between barrel and riser shall be watertight." Comment addressed. 3) Add a note if anti -seep collars are used. "Connections between anti -seep and barrel shall be watertight." Comment addressed. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforins.asp?department--cdengMTo Sincerely, Michelle Roberge