HomeMy WebLinkAboutSP201300027 Review Comments Special Use Permit 2015-05-12County of Albemarle
Department of Community Development
Memorandum
To: Claudette Grant, Senior Planner
From: Justin Deel, Engineering
Date: 12 May 2015
Subject: 5t` Street Development Drive -Through (SP -2013-00027)
The special use permit for a drive-through lane on the 5t'' Street Development has been reviewed. The
configuration of the drive-through appears unchanged from the previous submitted plan, dated 12/9/2013.
Thus the County Engineer's 20 February 2014 comments, provided below, have not been addressed.
Therefore, this drive-through configuration is recommended for denial.
This drive through proposal has no by-pass. It appears to have inadequate stacking. The order or teller
window has not been located, so the exact stacking layout cannot be determined. The split entrance with
very small radii is not acceptable. Lastly, the turning radius around the building corner is unacceptable.
file: SP201300027 Eng. Comments 5-12-15.doc