Loading...
HomeMy WebLinkAboutSP201300027 Review Comments Special Use Permit 2015-05-12County of Albemarle Department of Community Development Memorandum To: Claudette Grant, Senior Planner From: Justin Deel, Engineering Date: 12 May 2015 Subject: 5t` Street Development Drive -Through (SP -2013-00027) The special use permit for a drive-through lane on the 5t'' Street Development has been reviewed. The configuration of the drive-through appears unchanged from the previous submitted plan, dated 12/9/2013. Thus the County Engineer's 20 February 2014 comments, provided below, have not been addressed. Therefore, this drive-through configuration is recommended for denial. This drive through proposal has no by-pass. It appears to have inadequate stacking. The order or teller window has not been located, so the exact stacking layout cannot be determined. The split entrance with very small radii is not acceptable. Lastly, the turning radius around the building corner is unacceptable. file: SP201300027 Eng. Comments 5-12-15.doc