COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
EROSION CONTROL RE- INSPECTION INVOICE #4
DATE: , May 13, 2015
INVOICE T0: Belvedere Station Land Trust
Belvedere IIA, LLC
c/o Michael Ball
10010th St. NE, Suite 103
Charlottesville, VA 22902
RE: WPO- 2012 -00096
Belvedere Phase II WPO Plan
SWPPP Inspection (Notice to Comply)
DATE OF RE- INSPECTION: May 1, 2015
RE- INSPECTION FEE: $250.00
By June 13.2015 you should forward the re- inspection fee of $250.00 to continue your project.
To pay the re- inspection fee, please send a check payable to the County of Albemarle to my
attention along with the enclosed copy of this invoice.
If you should have any questions, please do not hesitate to contact me.
Sincerely
Todd Shifflett
Engineering. Division
TS/
Enclosure
OF A
I�kGINiP
Hand delivered
C"f-' cv
NOTICE TO COMPLY
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Project: / `�� �.�f f; �.� �G,�, ti _? Date: AS-
Under section 17 -900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the
requirements of the VSMP Permit for the referenced project and to immediately take corrective measures
that address the deficiencies on this property. The specific deficiencies are circled below:
Mud on road Shovel and sweep all mud and dirt from the road. Install adequate wash -
rack and construction entrance for cleaning. . L.., u c , f Fs
Measures not installed Items not been installed per the approved plan, or have been
removed. Install them, or obtain a plan amendment.
Measures failing Measures have failed more than once. Build larger, more effective ones, or
7::. e tilan to better protect the site.
Site abandoepairs needed The site is not stabilized and erosion is occurring.
asure an stabilize. S.i3 .A s >�G
No inlet protection Inlet protection has not been installed. Install inlet protection per the plans.
Site does not match plans The site has deviated too much from the approved plan, or the
plan was not buildable. A plan amendment is required.
SWPPP documents deficient Correct document deficiencies.
Pollution prevention practices not followed Install, maintain practices per SWPPP and CGP.
Washout facilities not provided or used Install and /or properly use washout facilities per
SWPPP.
Unless subsequently amended in writing by this office, it is expected all of these corrective
measures will be completed by: Date: q 430 // /S
r
Re- inspection of this notice to verify corrective measures will incur a $250 fee (17- 207/8, $150 for SF).
Failure to take effective corrective measures will result in a Stop Work Order upon re- inspection.
County Inspector Signature:)
Receipt Signature: