Loading...
HomeMy WebLinkAboutSDP201100014 Review Comments Letter of Revision 1 2015-05-13�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Restoration of Montalto — LOR #1 — Site Entrance Changes Plan preparer: Gropen Owner or rep.: TH Realty, LLC Plan received date: 1 Apr 2015 Date of comments: 13 May 2015 Reviewer: Michelle Roberge Engineering has completed the review of SDP201100014. Please address the following comments. A. Site Development Plan - LOR #1 1) Please clarify the changes in traffic circulation with detail 6, 7, and 8. 2) Provide the normal solid yellow line for two way traffic per MUTCD. This is not shown on sheet 3 of SDP2011 -14. 3) Per MUTCD, "[if crosswalks are] used, the diagonal or longitudinal lines should be 12 to 24 inches wide and separated by gaps of 12 to 60 inches. The design of the lines and gaps should avoid the wheel paths if possible, and the gap between the lines should not exceed 2.5 times the width of the diagonal or longitudinal lines." 4) Please note per MUTCD, "[crosswalk lines shall] consist of solid white lines that mark the crosswalk. They shall not be less than 6 inches or greater than 24 inches in width. It appears there are existing lines shown, but verify it meets this standard." Sincerely, Michelle Roberge