HomeMy WebLinkAboutWPO201400008 Bond Estimates 2015-05-14Project Name: Crozet Water Treatment Plant GAC Upgrades WPO file number: wpo201400008 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rop, crop (15 to 48 ") aggregate base or drainage stone earthwork for trap /basin structures for basin 0.0 in d 42.0 in d height of dam at toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transitior (area below transition) (total fill volume) length of spillway width of spillway riser height riser diameter barrel length barrel diameter trees shrubs seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) rip-rap, placed depth 1 ft length width 3.5 (tons) survey and layout (price per 0.1 mi.) acres http: //www.amazon.coi basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base 26.0 ft 6.825 1 No. Unit Unit Cost Cost (installed) 0 ft 0 ES -1,2 0 EC -1 0 ea 40.0 ft L 20.0 ft W 0 ft cut at high side 0 ft 0 ft cutatface 0 ft 0 ft length of cut 0 ft 0 ft width of cut 0 ft 0 sf (area below transition) 0 sf 0 ft (total width of cut) 0 ft 0 ft (depth below transitior 0 ft 0 sf (area above transition; 0 sf 0.0 cy (total fill volume) 0.0 cy 0 ft JOAL CY estimate) 0 cy 0 ft (spillway stone tons) 0 tons 0 ft $500.00 0 in (riser unit price) $0.00 0 ft base plate or fdn 0 0 in (barrel unit price) $0.00 3 ea barrel collars 0 baffle length 0 ft trees shrubs seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) rip-rap, placed depth 1 ft length width 3.5 (tons) survey and layout (price per 0.1 mi.) acres http: //www.amazon.coi basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base 26.0 ft 6.825 1 No. Unit Unit Cost Cost (installed) 0 ft $13.00 $0.00 0 ea $500.00 $0.00 0 ea $3,500.00 $0.00 0 ft $450.00 $0.00 100.0 ft $0.00 $0.00 196.0 ton $35.00 $6,860.00 $13.00 $0.00 $50.00 $0.00 cost sum $30,279.50 proj mgmt $4,541.93 contingency $3,482.14 Total $38,310 5/14/2015 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 ea $150.00 $0.00 0 ea $50.00 $0.00 0 ea $5.00 $0.00 70 ft $5.00 $350.00 70 cy $38.00 $2,660.00 0 ft $1,500.00 $0.00 0 ft $50.00 $0.00 $60.00 $409.50 $500.00 $500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 3 ea $5,000.00 $15,000.00 $0.00 cost sum $30,279.50 proj mgmt $4,541.93 contingency $3,482.14 Total $38,310 5/14/2015 Project Name: Crozet Water Treatment Plant GAC Upgrades WPO file number: WP0201400008 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in earthwork for trap /basin 80 ft $13.00 $1,040.00 $0.00 $0.00 0 $100.00 height of dam at toe 0 ft cut at high side 0 ft $0.00 height of fill at face 0 ft cut at face 0 ft 1 $2,000.00 length of dam 0 ft length of cut 0 ft $0.00 top width 0 ft width of cut L 0 ft (area above transition) 0 sf (area below transition; 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition) 0 ft (depth below transitioi 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy width of spillway 0 It (spillway stone tons) 0 tons structures for basin riser height 0 It riser diameter 0 in (riser unit price) $0.00 barrel length 0 It base plate or fdn POMP barrel diameter 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length 0 ft width 0 ft channel (SCC, matted) length 0 ft width 0 ft check dam depth in channel 1.5 ft channel width 10 ft construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth 0 ft length 0 ft width 0 (tons) 0 tons survey and layout (price per 0.1 mi.) acres 1 traps and basins 0 mobilization stream crossing (computed independently) No. Unit Unit Cost Cost installed 0.94 acres $5,000.00 $4,700.00 600 ft $5.00 $3,000.00 0 ft $5.00 $0.00 80 ft $13.00 $1,040.00 $0.00 $0.00 $13.00 $0.00 $50.00 $0.00 $60.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 $100.00 $0.00 0 $200.00 $0.00 0 $0.00 $0.00 $0.00 3 $337.50 $1,012.50 1 $2,000.00 $2,000.00 1 $2,000.00 $2,000.00 0 $3,500.00 $0.00 $60.00 $0.00 5/14/2015 $500.00 $500.00 $0.00 cost sum $14,752.50 proj mgmt $2,212.88 contingency $1,696.54 Total $18,670 5/14/2015 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2:1 for simplicty .y Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width *height)12 - height x height Length of Cut liment traps and basins Width ►n point Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)