HomeMy WebLinkAboutWPO201300032 Bond Estimates 2014-10-27 Ana Kilmer
From: Justin Deel
Sent: Monday, October 27, 2014 9:28 AM
To: Ana Kilmer
Subject: WPO201300032 ESC & SWM Bond Estimates
Attachments: WPO 201300032 ESC_bond_est.xlsx; WPO201300032 SWM_bond_est.xlsx
Ana,
Attached are bond estimates for WPO201300032.
Please let me know if you have any questions.
Justin
�. fl
Project Name: Cascadia - Blocks 4-7
WPO file number: WP0201300032
$210,588 Total Bond
•
Nee" Nose
Project Name:Cascadia-Blocks 4-7
WPO file number: WP0201300032
Stormwater Management Plan Bond Estimate
Item gem No-Um UM Cost Eost
Number (Installed.)
p0 Famsnent d asks or ditch O ft 513.00 $0.00
standard manhole frame top(nd inlet) 0 ea $50000 1000
drop Ind NIPS 0 no $3500.00 $0.00
mWrle etnxlue(per ft non) 0 ft $450 00 $000
pipe,rcp,ens(15 to 481 . 0 in d 0 10.12 0 EC-1 0 ft $0.00 $0.00
aggregate base or drainage None 0.0m d 00 ft L 450 fl W 0.0 Ion 13500 $000
earthwork Is trap/bass BF-1
height of den el toe 4 ft cut al heh tide 10$
height of fa at lace 2 ft cut at fete 4 fl
. - length of den $00 5 9419 101.4 100$
lop man 5 0 swath of cut 10 ft
Oda above trardlon) 18 el (area belowtrenoion) 72 N
(Might beesoenllion 2 ft (depth bebebanNtlon 6 ft
(total favolume) 81.4014815.cy (110.1 51006011.) 555.556 oy
length of spillway 10 ft . " $1300 57,57900
width of eddy 5 ft (epUvay None tons) 2.9 tons $50.00 $14500
Nructuas Id Wen
, Mar height 0 ft
riser tiddler 0 m _ , , . ' $000
. bane lens 0 ft base plebe cc fdn 0 $200.00 $0.00
barrel damns 0 in $000
barrel cokrs 0 $200.00 $000
battle length 0 ft $50.00 $0
Was 5 ea $15000 $75000
clads . 13 ea 550.00 $850.00
seedlings 0 no $5.00 $000
uderdain(LF) 50 ft $5.00 $250.00
Nods sod mot(CY) 168 cy $38 00 $6,384 00
trash fad/anti vortex device* 0 ft $1.500.00 $0.00
rrwnteoa0e access road(LF) 0 ft $50.00 $000
dWeP,P depth 0 ft length 0 ft
wdlh 00 cans) 0 $60.00 $0.00
survey and hyoid(price per 0.1 ml.) sues 0 basins 3 $1500.00
nabiluabon $50000
es.bue&.nigs(par Way) - 4 ea $2,000.00 $8,000.00
materials testes(par Wiley) 4 ea 52,00000 $8.00000
compaction teeing(par dam) 4 ea $5,000.00 120,000.00
manufactured toddies(*each manufacturer's or canbacters price as a base) $000
coat vim 153.758 00
PM m9m1 98.063 70
contingency $6,182 17
Total $68,010
10272014
Project Name:Cascadia-Blocks 4-7
WPO file number: WP0201300032
Stormwater Management Plan Bond Estimate
Item Item Ns UUmt Unit Cost cost
Number L1eeO
permanent&swin etdech ft $13.00 $0.00
manderd menhole frame lop(not oar) ea $50000 $000
drop W0 of grate ea $3,500.00 $0.00
manhole structure(pr fl me) ft $45000 $0.00
pipe,rop,nnp(15le 481 0 in d 0 55-1,2 0 EC-1 ft $0.00 $0.00
appregre base or drainage stone 00 in d 00 ft 1 450 ft 0 Ion $3500 $000
•
ee85005 for bapbasn BF-2(cleanrt) 26.666 try $1300 $34667 bl-2 Clee00ul
height a darn Woe Oft wlsl high aide 0 ft
taught of fa at face 0 h cut el face 0 ft
lanash ofhm Oft length of cut Oft
top math 0 h width of cut 0 ft
(arse aboelmsdbn) - 0 sf (erne belowharWCn) 0 61
(hdpla below transition 0 ft (depth below errodion 0 ft
Mal fa volume) 0 ey (Waal fa volume) 0 try
length of spalwey Oil $1300 $000
wan of spaeay 0 ft (spillway stone tone) 0 tans $5000 $0.00
structures tor Wan
near height 0 ft
mar gamete( 0 n .. , .. . . $0.00
banes length 0 It base Meteor ldn 0 $20000 $0.00
barrel demote, 0 n $000
ban0 cowers 0 $200.00 $0.00
baffle length 0 fl $5000 $0
trees 0 ea $15000 $000
daubs 0 as $50.00 $0.00
seedhga 0 ea $500 $000
urdwdnin(LF) 50 ft $5.00 $25000
brother eol mix(CY) 168 try 03800 $6,38400
bash rack/anti vortex devices 0 ft $1,500.00 $0.00
=intensive access roa4(LF) 0 ft $5000 $000
*mar pieced depth 0 ft length 0 ft
width 00 pons) 0 $6000 $0.00
survey and layout(price per 0.1 not.) ewes 0 bases 0 $0.00
nobieaton $500.00
en-bt/ll drawings(per feaay) 0ea $2,000.00 $0.00
mammas teasng(per family) 0 ea 02.000.00 $0.00
eempadinn tasmrd(pr dam) 0 as $5,000.00 $0.00
n muladured babes(attach manufacturer's or cawaclr's pure as a base) 00.00
cost sum $7.480.67
prof mural $1,12210
conlogency 186028
Total 59,470
10/27/2014
No. Unit Price Total
Pond 2 cleanout 9666 cy $13.00 $125,658.00
Gabion Check dams 6 ea $200.00 $1,200.00
Swale Grading 250 If $25.00 $6,250.00
Total $133,108.00
,......, ,......,
Project Name: Cascadia - Blocks 4-7
WPO file number: WP0201300032
$1,300,690 Total Bond
9 f a h'l
J-"'"..O
,..,....1...........4.***e 0
e ats.c.500-.
.1.sreomet
1 '14\4- 614 , .:..) j ,
4 -- 1 / 1 / ' ' • .
. , f....- , 91/4".,c120 ii,
I
limo' Neel
- Project Name:Cascadia-Blocks 4-7
WPO file number: WP0201300032
Erosion and Sediment Control Bond Estimate
Item tern No Umt nit Cost Cost
Number 33)9lled
stebbraton(PS.TS) 608 acres 5303.850.02
sit fence(SF) 9000 ft $4,500.00
safety lance(SAF) 10000 ft $5,00000
demean(DD.FD,RWD) 15011 51.95000
temporary slope drain(TSD) pipe length 0 ft pile diameter 15 in - $0 CO
earthwork for traplbasnn
Mehl of dam at toe 0 ft not at high safe 0 It
height of al at face Oft cut atlece 08
length of dam 0 ft length of cut 0 ft
top width 0 n width of out 0 ft 3000 cy 039000 00 S6.1 cleanout
length of aptllway 0h $1300 $000
0dth of spillway 08 . . $5000 $0 00
structures for basin
noel height 0 it
nser diameter 0 in $0.00
barrel length 0 tt base plate or win 0 520000 SO
barrel diameter 0 m .. ' $0.00
barrel collars 0 0200 g0 SO
baffle length 0 8 $50 CO $0
sit fence Wet protection(IP) 0 $000
star inlet prolecbon(IP) 14 $2,000 00
oube1 poleceon(OP) meth 18 ft width 18 ft 3 84.374.00
channel(SCC,matted) length ft width 10 8 $0.00
check dam depth in channel 1 ft channel width 10 ft 1 022500
construction entrance(CE) 1 52.00000
wash rack 1 , . 52.00000
paved constrb entrancconstruct=on 83.500.00
npnp,paced depth 0 ft length 00 8
width 0.0 ., . . $0.00
survey end leyout(price per 01 on) saes 80 77 traps and basins 7 533.88500
nabdeabon 550000
sream crowing(computed adeperdensy) 80 00
cost mum 8403.584.00
pm)n gmt 560.537 60
contingency 546,41218
Total $510,540
1027(2014
woo`
Project Name
WPO file number:
Erosion and Sediment Control Bond Estimate
Item Itgm NQ Unt Unit Cost 5$i
Number installed
sted0abon(PS.TS) 00 acres $000
et fence(SF) 13000 8 06.50000
safety fence(SAF) 130008 06,50000
dweraon(DD,FD,RWO) 1110 0 $14,43000
temporary slope dran(TSO) ppa WO 425 ft ppe Member 20 In $50000
earthwork Id trapbien(58-2)
heght of dam al toe 168 cut al'ghat& 18ft
height of fill al face 10 ft cut at lace 8 ft
length of dam 600 ft Onglh of cut 540 ft
top width 10 ft width of cut 90 6
length of spillway 0 8 $1300 $382.031 00
width of aplMay 0 ft $50 CO $0 00
structures for basin
near height 11 ft
aerduraeter 5 n - $000
barrel length 68 ft base plate or ldn 1 $20000 $200
banal diameter 30n 04,42000
barrel celbre 2 $20000 $400
baffle length 270 ft $5000 003.500
wit fence Net protection(IP) 0 $000
atone NH protection PP) 14 .. $2.800.00
outlet 00000800(OP) .09th 200 ft width 50 8 1 045.000.00
channel(SCC,malted) length ft soda 10 It $000
check darn depth m channel 1 ft channel*Nth 10 8 1 $225.00
conabucbon entrance(CE) 1 52,00000
wash rack 0 . .. $0.00
paved consbuebon entrance 0 $0 00
np-rap,placed depth 0 ft length 0.0 8
width 00 '. . $0.00
survey and byout(lance per 0 t m) acres 0 traps and beans 0 $0.00
modheabon $000
stream crown(computed Independently) $0 00
cost sum $478.506.00
Prod m904 571.775.90
conbgency $55,0213.19
Total $606,320
10/27/2014
Ywrr Neer'
•Project Name
WPO file number:
Erosion and Sediment Control Bond Estimate
Item Am No mt Unit C 3t gr9,g
Number (Installed)
stabkzabon(PS,TS) 00 acres $000
wit fence(SF) 00 ft 1000
safety hence(SAF) 00 ft $000
dwersen(DD.FD.RWD) 0 ft $000
lemporary slope dean(TSD) pipe length 0 t pipe diameter 0 in $000
earthwork for leapt Wain(SBA)
heght of dam at toe 5 ft cut athgh side 0 f
height of RI at lace 10 ft cut at lace 8 ft
length of dam 200 ft length of cut 200 ft
top width 10 ft width of cut 10 t
length of sp4lway 0 f •• .. $1300 525,36300
wdth of spillway On E5000 $000
structures for basin
riser height 0 ft
nser diameter Din 1000
barrel length Oft base plate or Idn 0 1200.00 $0
barrel diameter O n $000
barrel collars 0 $20000 10
baffle length 0 It 15000 $0
sill fence inlet proleObon(IP) 0 $000
store Wet Potacbon(IP) 0 ., $0.00
outlet peotecbm(OP) length 0 It wdth 0 t 0 •. $000
charnel(SCC,maned) length ft wdth 0 ft $000
check darn depth in channel 0 ft channel width 0 t 0 $000
consbucWn entrance(CE) 0 $0.00
wash rack 0 $000
paved coretucbon entrance 0 $0 CO
Wrap.Placed depth 0 It length 00 ft
wdth 0.0 $000
survey and layout(puce per 01 nc) acres 0 0 traps and basins 00 $000
moWZabon
stream crowing(computed independency) moo
cost sum $25,363.00
Po)ngmt 13.804 45
contingency $2,916.75
Total $32,090
10/27/2014
'Noe
' Project Name
WPO file number:
Erosion and Sediment Control Bond Estimate
Item lin N.Q.VA Unit C051 Cost
Number Ilnslalied)
=Pint=PS,IS) 00 acres 5000
sill hence(SF) 8000 ft 94,00000
safety fen=(SAF) 0 0 ft 10 00
diversion(DD.FD.RWD) 2100 ft 527.300.00
temporary elope drain(ISO) PP*=OM 100 ft ppe diameter 24 in 55,50000
earthwork for trap/basin(5T-1)
heght of dam at toe 5 ft cut at high sale 5 ft
Might of fill at face 10B out at lace 8n
length of dam 40 fl length c4 cut 40 It
top wdth 5 n vndth of cut 20 0
length of spillway 18 ft , $1300 $5,33000
width of spillway 1B f1 55000 $93000
structures 101 basin
near height 0 ft
mar dav00ler 0 in . $000
barrel length 0 R base plate or WI 0 $200 00 SO
barrel diameter 0 m ... .. . SO 00
barrel collars 0 $20000 SO
baffle length 0 ft 55000 SO
Pt fence Wet prolacbon(IP) 0 $0.00
alas Wet p108.09on(IP) 35 . $7,000.00
Outlet protecbo 1(OP) length 0 ft width 0 ft 0 $0.00
charnel(SCC,maned) length ft width 0 ft $000
check dam depth m channel 0 ft channel wadth 0 n 0 10.00
construct=entrance(CE) 0 . $0.00
wash rack 0 $0.00
paved 00001,ucbon entrance 0 .' SO00
rp-rap,placed depth 0 ft length 00 e
width 0.0 . ,. . $000
survey end layout(once per 01 mi) acres 0 0 traps and Mans 00 SO 00
moblualron
.barn 0100.01$=mauled Independently) SO 00
cost sum $50,060.00
prof Molt $7.509.00
cbnbngency $5.758.90
Total $63,330
10/27/2014
Project Name
WPO file number:
Erosion and Sediment Control Bond Estimate
Item Imo S d Una Cost Cost
Number (Installed)
sablaaim(PS,TS) 00 acres $000
an fence(SF) 00 It $000
..ley lence(SAF) 00 ft $000
diversion(DD.FD,RWO) 0 ft $000
temporary slope drain(TOO) Pipe length 0 ft pipe diameter 0 In $0 00
earthwork for ftaplbase(ST-2)
height d dam at toe 1 t not et high side 2 f
height of Id at lace 4 ft cut at face 10 ft
length of dam 80 ft length of nut 80$
top width 5 ft nodlh of cut 12 ft
length ul spleway 11 ft $1300 04,87500
width of spillway 11 ft 150.00 $350 00
structures la basin
user height 0 ft
neer diameter 0 n $000
barrel length C$ base plate or kin 0 $200.00 $0
barrel diameter 0 in ... .. $000
barrel collars o $20000 $0
baffle length 0 ft $5000 $0
Intl fence Inlet;conceal((P) 0 - $0 00
stone inlet protecban(IP) 0 $000
outlet reelection(OP) length O ft width O ft 0 $000
channel(SCC,malted) length ft width 0 ft $000
chock dam depth in channel 0 ft charnel width 0 ft 0 $0 00
canabucbm entrance(CE) 0 . $000
wash rack 0 $000
paved construction entrance 0 $000
's-rep.placed depth 0 ft length 00 ft
width 0.0 . $000
survey and layout(prise per 0 1 no) acres 0.0 traps and basins 0.0 $000
nlobdinten
stream crossing(computed edependently) $0.00
cost sum $5,22500
pro)ngmt $783.75
contingency $80088
Total $6,610
10/27/2014
lift/ Nape
•
` Project Name
WPO file number:
Erosion and Sediment Control Bond Estimate
Item I'M NQ Unit Unit COSt Ost
Number mst Ilse
99MaabonIPS,TS) 00 acres 5000
sal fence(SF) 2500 ft 51,25000
safety lance(SAF) 1100 0 ft .. 55,50000
deersion(DD.FD,RWO) 1300 8 516,90000
temporary stops elan(ISO) Poe lerglh 300 ft pipe diameter 18 in . ' 512,50000
earthwork for traplWun(08-3)
height d dam at Ice 4 h cut at high side S ft
height of NI al lace 14 ft cut at face B ft
length of dam 50 ft length of cut 50 ft
top vadlh 4 ft wain of cut 10 ft
length d spillway 50 n 513.00 59,087 00
wdth ofspIK.ay 8 ft , 55000 51.15000
structures for hewn
rem height 15 ft
neon diameter 36 in . 51,05000
barrel length 70 ft base plate or fun 1 520000 5200
barrel diameter 24 n .. 53.50000
barrel collars 0 820000 80
battle length 0 f 550 00 50
silt fence inlet prof cton(IP) 0 50.00
stone Wet protect.,(IP) 57 . .. 511,400.00
outlet prolecton(OP) length 0 ft width 0 n 0 0000
Gunnel(SCC.matted) length ft width 0 e 50.00
cluck dam depth In channel 0 ft channel width 0 ft 0 .. 5000
consbucton entrance(CE) 0 i 50.00
wash rack 0 ._ 5000
paved constructor,entrance 0 . ., 50.00
ryxap,placed depth 0 ft length 0.0 n
smith 00 . . 5000
survey and layout(pno per 0.1 no) acres 0.0 Paps and banns 0 0 5000
nalbiaabon
stream a0serg(cm.auted independently) 9000
cost sum 562,537.00
Prot mgml 59,380.55
contingency $7,191.76
Total $79,110
10/27/2014
•
rare Norio
•
Project Name
WPO file number:
Erosion and Sediment Control Bond Estimate
Item fleet mt Unit Cost Cost
Number installed
aebkzatron(PS.TS) 0 0 acres SO CO
era fence(SF) 0 0 tt $0 00
safety fence(SAF) 0 0 ft $0 00
dveraion(OD,FD.RWD) 0 ft $000
temporary slope drain(TOO) ppe length 0 ft rape diameter 0 in $000
earthwork to Oeplhavn(ST-1)
height of dam at toe 4 ft cut at hgh side 2 ft
height ol fnet face Oft cut at face 7ft
length of dam 70 ft length of cut 70 ft
top vndth O tt vnd h of cut 8 ft
•
length of spdkvay Dry ., ,. $1300 $2,912 CO
with ofepdtlwey Oft $5000 $000
structures for basin
near height 0 ft
neer demote, 0 In $000
barrel length 0 ft base pate or fan 0 $20000 $0
barrel damelor 0 In S0 00
barrel collars 0 $200.00 $0
Wife length 0 ft $50.00 $0
wit fence Wet protection(fP) 0 $0.00
stone Wet protection(IP) 0 ..• $0.00
Wile protection(OP) length 0 ft width 0 tt 0 . . $0.00
channel(SCC,matted) engN ft wddth 0 ft 5000
check darn depth n charnel 0 ft channel width 0 ft 0 ' ' $000
construction entrance(CE) 0 , . . $000
wash rack 0 . . $000
paved construction entrance 0 $0.00
rp-ep,placed depth 0 ft length 0 0 ft
wdth 00 SO CO
survey and layout(once per 01 mI) acres 0 0 traps and basin 0 0 $0 OD
mobilization
stream crossing(computed independently) $0.00
cost sum $2,912.00
pro)ngmt $436.80
contingency $334.88
Total $3,690
10/27/2014
Approximate Earthwork computations for sed
Assumes all cut and fill slopes are 2:1 for simplicty
Top
Height of Fill at Face
1 :ww
h1
Cut at High Side
h2
* transitio
w hi
Width of Cut Cut at Fa
Fill area above transition = h 1(2h1) + h 1(w)
Fill area below transition;
total width of fill (dam) = 2h1 + w + 2h2
height below transition = h2-hl,
area = (width*height)/2 - height x height
Length of Cut;
«a-
liment traps and basins
Width
Ti
Height of Darn at Toe
)n point
h2
ice
Volume = Length of Fill x Fill Area
Cut Areas and Volume is the same as fill
but using the cut dimensions
44 Length,of Fill for Dam
)
" (approximately)
IF
• "4,1 ;',"`,:s
qtly.r
=t+-
. L..✓ ter'
Project Name: Cascadia - Blocks 4-7
WPO file number: WP0201300032
$210,588 Total Bond
rtf Internal Use Only ` `"i✓' 71) `
Date Received: Fee Paid:250 di O�Aft
Received by:
Intake: Forward to Management Analyst
RGIN�
REQUEST TO ESTABLISH A BOND
APPROVED PLAN# UJPO 203 — 32 ``
PROJECT NAME: �"r Ciru,,�� P►, fur CAS t aA.iti\ —Poc kS Li-7
(As listed on the approved plan)
All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a
separate sheet if more owners are required. Owner and tax map information must be correct,and plans must b
approved prior to bond estimates being prepared.
CeL° COldits e6216lIfe / c.
TAX MAPs/PARCELs: (o 2.- 2S OWNER'S NAME: C. c^� ( ' S tM �i•• U
SIGNATURE:1 1�A �� date: 2/S-/57
TAX MAPs/PARCELs: 7£#-Sc t-S9 R OWNER'S NA► E: G In c l I e ,/ - t�,,r 5 (11
SIGNATURE: j/G. / j date: '7:/ /L
TAX MAPs/PARCELs:-7RC- } k OWNER'S NA E: C g 04 e W14 of nil 13
SIGNATURE: j , _ j _ date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including,but not limited to the name of corporation,partnership,limited liability company,
trust, association,etc., documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
❑ VESCP Erosion&Sediment Control per Water Protection Ordinance section 17-207;$0 fee
VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water
Protection Ordinance section 17-208; $250 fee required
❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
&Water&Sewer per Subdivision Ordinance section 14-435; $250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL: k Scl Alt eq.-Itpl:?acrvWL`C. r.Gm-
OR REGULAR MAIL ADDRESS: 1'10 S , {# p 1 O�'t
c It r It su Lk e..1 (IA 2281
Revised 6/20/2014 `/ t /7 Pel1-4 4 **1.46