Loading...
HomeMy WebLinkAboutWPO201300061 Bond Estimates Bond Estimate 2013-10-09 . Nei *Imo % \ c a) a) § _c k c 2 L) 0 c ) > trs / c as E \ _c / 0 \CU c \ _ § ~ .47.,0 CU X / - - / § § c a y 0 Rc a ° $ s / E 3 0)' 0 > 7 a, ƒ m w k ) n ± I $ U �/ m ± c in q c / \ �� \ C c •� E 2 m o O E $ § S ¢2k0 03 C kOOO / E ƒ 2c� 43 I t 3 E � 2 a » \ f \ kR� 32 § 2 / \ 2 $ / +., B > E 0 G o m / 0. ^ 5 / / cEf0 > % 7 t « [ cu 2 & E § c) . t / / / ƒ \as m Le U 7 \ \ ■ 0 C .. \ / C 2 0 •0 •0 = / a) m co c c E e m Ni,4 - « co w Q @ e / k » 0 0 0 / \ / Project Name : New Hope Church - Early Grading Plan WPO file number: WP0201300061 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) pipe diameter silt fence (SF) 2 ft safety fence (SAF) 0 ft diversion (DD, FD, RWD) cut at high side temporary slope drain (TSD) pipe length 1 temporary sediment trap (ST or CIP) 29 ft 1 o ft height of dam at toe 67 ft height of dam at face (cut vol) length of dam 6 ft top width 101.0 (camp. fill vol) (spillway stone tons) length of spillway 1.5 ft width of spillway 1 temporary sediment trap (ST or CIP) 2 ft cut at high side height of dam at toe 75 ft height of dam at face 7 ft length of dam width of cut top width 51.0 cy (comp. fill Wo 24.9 cy length of spillway (cy est) width of spillway stone culvert inlet protection (IP) (spillway stone tons) stone inlet protection (IP) 15 ft outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) 5 ft wash rack length paved construction entrance 0.0 rip -rap, placed depth 2.8 width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 45 ft pipe diameter 18 in 2 ft cut at dam 0 ft 2 ft cut at high side 2 ft 50 ft length of cut 29 ft 1 o ft width of cut 67 ft 74.1 cy (cut vol) 76.3 cy 6 ft (cy est) 101.0 6 ft (spillway stone tons) 5.4 1.5 ft cut at dam 0 ft 2 ft cut at high side 2 ft 75 ft length of cut 7 ft 2 ft width of cut 92 ft 51.0 cy (cut vol) 24.9 cy 6 ft (cy est) 59.3 6 ft (spillway stone tons) 5.4 15 ft width loft 0 ft width 0 ft 1 ft channel width 5 ft 0 ft length 0.0 ft 0.0 (tons) 0 2.8 traps and basins 2 No. Unit Unit Cost Cos $250.00 (installed) $0.00 2.8 acres $5,000.00 $14,000.00 1770.0 ft $5.00 $8,850.00 0.0 ft $5.00 $0.00 360 ft $13.00 $4,680.00 $40.00 $2,300.00 $13.00 $50.00 $1,582.36 $13.00 $50.00 $1,041.39 1 $250.00 $250.00 0 $200.00 $0.00 2 $675.00 $1,350.00 $0.00 18 $112.50 $2,025.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 F $2,400.00 $500.00 cost sum $44,478.75 proj mgmt $6,671.81 contingency $5,115.06 Total $56,270 Method for volumE (tenth) x (total widt assume face at 2: total width = 3x(to, average height = ( Method for volumE (tenth) x (total widt assume face at 2: total width = 3x(toE average height = ( 9/24/2013 Internal se On, pF AL y��f Date Received:� 2� � Fee Paid: /1-27411--'1 �r� o$ '_x,171 Received by: �.�. fir• Intake: Forwar.to Management Analyst RGI BOND ESTIMATE REQUEST APPROVED PROJECT PLAN TITLE:r(Title on the ap rove plan from which the estimate will be prepared.) 4-61-&• 2C 13 -- (Doe ,_'/ All parcels in the project, including any off-site work if easements are not provided, and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. 6021 00-c 00,_ 0 1 - TAX MAPs/PARCELs: OWNER'S NNAME: Ne,(0 aow Co"h�.u C vi / SIGNATURE: 1A) / date: ��D- 1 13 TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: The requested estimates are; Eg Erosion & Sediment Control per Water Protection Ordinance section 17-207 Stormwater Management per Water Protection Ordinance section 17-306 El Subdivision (roads, drainage,etc.)per Subdivision Ordinance section 14-435; & Water& Sewer per Subdivision Ordinance section 14-435; $250 fee required The estimate must be sent to the owner. Please provide contact information. EMAIL: ,1 7-2 qS a 5 r41 0,', I, c o OR REGULAR MAIL ADDRESS: 3 S v,)►.zr a,, -Ste 7O,0 C k r ,- t ci 11 4 I 1"lti 4-, Revised 11/1/2011