HomeMy WebLinkAboutWPO201400007 Review Comments 2014-03-05
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project: Scottsville GAC Updates WPO201400007
Plan preparer: Hazen & Sawyer [edwards@hazenandsawyer.com]
Owner or rep.: Albemarle County Service Authority
Plan received date: 12 February 2014
Date of comments: 5 March 2014
Reviewer: Max Greene
The Water Protection Plans (WPO201400007) submitted 12 February 2014 have received Engineering Review
and appear to meet Albemarle County minimum checklist items for engineering approval. Please submit
at least 2 additional copies of the WPO plan for approval and distribution during the pre-construction
meeting.
A Stormwater Maintenance Agreement will be required prior to final plan approval. Please follow the
attached links for maintenance agreement procedures and forms:
http://www.albemarle.org/upload/images/forms_center/departments/Community_Development/forms/Engi
neering_and_WPO_Forms/Plan_Review_-
_Stormwater_Management_BMP_Facilities_Maintenance_Agreement_Procedures.pdf
http://www.albemarle.org/upload/images/forms_center/departments/Community_Development/forms/Engi
neering_and_WPO_Forms/Plan_Review_-
_Stormwater_Management_BMP_Facilities_Maintenance_Agreement.pdf
The property owner may request a WPO Bond amount at this time. The forms and instructions to request
the Water Protection Ordinance Bond amount can be found on the Community Development Department
Web site at:
http://www.albemarle.org/upload/images/forms_center/departments/Community_Development/forms/bond
s/Bond_Estimate_Request_Form.pdf
You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246
for further information on bonding procedures and Maintenance Agreements.
Once the E&SC bond has been posted, you may contact the Department of Community Development to
arrange a pre-construction meeting with a County Erosion & Sediment Control Inspector. Should the
County Inspector find the limits of disturbance increased or the need for additional control measures
required to protect the site, additional fees will be required.
[17-204.G] An approved erosion and sediment control plan shall be void if the owner fails to obtain a grading, building, or other
permit for activities involving land disturbing activities within one (1) year after the date of the approval.
File: CDDE1_esc,swm_MRG_Scottsville GAC Updates.doc