Loading...
HomeMy WebLinkAboutWPO201300079 Preconstruction Form 2015-03-25 Request for Pre-construction Meeting and Grading Permit ;? from Albemarle County , ,- Approved Plan Number: WPO- 20 I 0007 43 „list Approved Plan Name: E s ��( ,�, � r@v-t�t� `.aGDl�i/�j{�ry,'� �iir�t,,j C �ti"704 (Plans must be approved prior to a pre-construction meeting.) Bond approved date: 3 2-6 2.0 l (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: ,�� { ..--------, �- Print Name: r312 f fc 1 �,J • '.---.6 l':. ' State Certi cation Number: 140(0 1 fS Address 0 i 143 City Al i °t. �et)I.t State CTAg` Zip 302.t 4 Daytime Phone 803L___ _54_1017,e1 E-mail 3o,01-40_6120+ CA.G� Primary Contractor: Print Name y+ _ .it: 1/:` _ _ In 1 Address i c 'd b1?4Cs'Y'"'` bie2„ City ��i)St I Stat 4 Zip 302-14 Daytime Pho , s-,— f E-mail iI/ m"n.S Q ets. Permit Issuance and First Year Maintenance Fees: (Request must incltfde ent Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 I $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2.112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14.Revised: 8/29/14 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email Attlee" 4/401 37-&11iA1 S /7- 27/-'77.3 S' The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who^ 7/1.'14.Revised: 8.'29//14 Page 2 of 3