Loading...
HomeMy WebLinkAboutWPO201400013 Preconstruction Form 2014-12-03 �tior u.r�„ Request for Pre-construction Meeting and Grading Permit from Albemarle County . Approved Plan Number: WPO- 01`(-1rLt{3 Approved Plan Name: 14- 't (Plans must be approved prior to a pre-construction meeting.) Bond approved date: i -t 3 i IL( (Bonds must be approved and posted prior 10 a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: I • — 1-4jCtil State Certification Number: .3 ($.- Address ISCz 0' City 1 i:54."`6j'"} State 4 Zip ); `'i Daytime Phone(-S"A' 1 C// / 6 4c, E-mail rut j i foiv-N Primary Contractor: ll Print Name !v t6 PA t'1 3A". LE-Cy')"` ,s< /k) I 1 "e). ) Address} (lee' )c'++)J City 1-kl '.�.%r) State I/4 Zip d)r `''I Daytime Phone(S ) ,��-�t / {E-mail E'lt:.1) (o•') Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 l and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1.342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised: 8/29/14 Page 1 of3 • Person(s)to attend the Pre-construction Meeting: Names(type or print) q Firm Contact Number or email 116.") 1-e71/hc+'t. `(G`ft'!P'}1J:`-.. 1�cr ..t:ri�} 5--L-40• 7"iC-O 8)c The second part of the application fee is required to be paid with this request. This fee amount is: FOR OFFICE USE ONLY Permit Issued Date By who 7/1/14,Revised: 8/29/14 Page 2 of 3