Loading...
HomeMy WebLinkAboutWPO201400019 Bond Estimates 2015-01-30 Project Name:Ivy Road-Flordon Water Connection Project WPO file number:WP0201400019 Erosion and Sediment Control Bond Estimate Item Item NQ Unit UrijtCst at Number (Installed) stablizeke(PS,TS) 0.54 acres fl. $2,700.00 Silt fence(SF) 1750 ft $8,750.00 safety fence(OAF) 200 ft $1,000.00 diversion(DD,FD,RWD) ft ) $0.00 temporary slope drain(TSD) pipe length ft pipe diameter in $0.00 earthwork Inc trap/basin height of dam at toe ft cut at high side ft height of fill at face ft cut at face ft length of darn ft length al cut ft lop width ft vadth of cut ft if k t■ft ft.55x , $13.00 $000 width ftf ftl.ttftW $50.00 $0.00 structures for basin riser height ft nser diameter $0 50 barrel length ft base plate or fdn $200 00 $0 barrel diameter in $0.00 barrel collars $200.00 $0 baffle length ft $50.00 $0 silt fence inlet protection(IP) 1 $100.00 stone inlet protection(IP) $000 cutlet protection(OP) length ft width ft $0.00 channel(SCC,matted) length ft width ft $0.00 check dam depth in channel 2 ft channel width 10 ft )41 81,350.00 construction entrance(CE) 3)44, $0.00 wash rack 0 $0.00 paved construction entrance I) ' $000 rip-rap,placed depth ft length ft mdth $0.00 survey and layout(price per 0.1 nil acres 3 traps and basins 01.00000 mobilization $500.00 stream crossing(computed independently) $0.00 cost surn $15,000.00 pr5 rngmt $2,385.00 contingency $1,828.50 Total 520,120 1/30/2015 Internal Use Only � ' g� d' Date Received: �'2211 5 Fee Paid: ZS Q 4 OvA �""' Received by Da :f� ©ll�l Intake: Forward to Management Analyst t• " ti >. . REQUEST TO ESTABLISH A BOND APPROVED PLAN # (!.J Pp (y 00019' PROJECT NAME: v Qocd F13(clOr. Wo.4(5- (3 nec*i ), (As listed on the approved plan) All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. see_ (ac.(.-20 a`F 5 TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: NOTE: If ownership of the property is in the name of any type of legal entity or organization including, but not limited to the name of corporation, partnership,limited liability company, trust,association,etc.,documents acceptable to the County must be submitted certifying that the person signing above has the authority to do so. The requested estimates are; —❑ VESCP Erosion&Sediment Control per Water Protection Ordinance section 17-207;$0 fee 137 VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water Protection Ordinance section 17-208;$250 fee required ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435; &Water&Sewer per Subdivision Ordinance section 14-435; $250 fee required A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide contact information. EMAIL: SL_Vti'N(5 Se- c�a� G-�,�c t • O 3 OR REGULAR MAIL ADDRESS: ' Revised 6/20/2014 k..: . E�.-1 d x' ✓ `a" . . # , D A.