Loading...
HomeMy WebLinkAboutWPO201400028 Preconstruction Form 2014-07-03 Erosion & Sediment Control Preconstruction Conference Checklist Name of Plan: A N T4"PS Cc)e Nt Plan No.: 1N PO /-o 11-100 2.1%5' '/3/ Date: Zoe 1) Copies of approved plan given to: Owner or Authorized Agent z- Contractor 2) Have all the conditions been met? `425 3) Responsible Land Disturber: C/(9/07Z iZ rI 1—PH H'/WJT, Jf Cert./Lic.No.: I C-0142— Type: Address/Phone/ Mobil Phone: £ Jb!LS aalf Orr!Nei 984ll .H/3TTbN pg'1 1(b. oT` Tsf(1.4, (0- Z1f1Lt® (c)4t- 41 / ?E3/— (081/ 4) Name of Prime Contractor: ko fiet`y JCS Uac/? 11 Address/Phone/ Mobil Phone: 7 814( /-( -7172-6'1 FCX/t/ l (C) Zig4— 73 &g of Name of Subcontractor: 5) Persons in Attendance: Name Firm 61bC61 41106. Co. ►an O Albs. Co. t`G &e( M( �W� ov.�rs Co rAt r LC_ 674 afi a , /1 C t.e 1 1 /,a- 0)4/07 CYCat V I I5 C�r( ,� 60,0kS r7w, s Corte (6) Date Permit Issued: di/ (7) \J Notification has been ggiven that the owner/contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. (8) Article II, section 17-207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement 1 of 2 Revised 11/29/2011 based on documentation submitted by the owner that clearlymonstrates that the land disturbing activity commenced on that date. 2. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete; trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. 3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may he extended by either the program authority or the board of supervisors, or both, as follows: a. The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the program authority may impose reasonable conditions. b The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the property during the land disturbing activity In granting an extension, the board shall set a time limit and may impose other reasonable conditions. Notes, /1-1,50 alfrA ,Jovrri 61.61.tryoti _�_— jz_r_c)(cm iyucto,„ 2 oft Revised 11/29/2011 I:\DEP'i1C:onununity Development\Forms\Inspections\Lrosion Preconstruction Conf Checklist 11 29 20i I.doc Pantops Corner WP0201400028 Preconstruction Meeting Contractor Information RLD# Randy's Excavating, LLC 9841 Hatton Ferry Road Scottsville,VA 24940 One or both of following will attend.(Same address for mail) NCarlton R Hunt,Jr cell 434 9816801 Carlton R Hunt, Ill cell 434 9813090 email: crhorooerties @gmail.com Pantops Corner, LC 1100 Harris St. Charlottesville,VA 22903 One or all of the following will attend the meeting. n� Michael McGowan, 434 806 8549 mcgowan1950 @gmail.com tAj Carlton R. Brooks,Jr., 434 960 7938 lcrbhscc @embargmail.com Frayser F.White, III, 434 9817077 frayser.white @gmail.com