Loading...
HomeMy WebLinkAboutWPO201400028 Bond 2014-06-30Ana Kilmer From: Ana Kilmer Sent: Monday, June 30, 2014 4:04 PM To: 'Michael McGowan'; Kenny Thacker; Jonney Otto; Jeremy Glode Cc: Esther Grace; John Anderson Subject: FW: wpo-2014-00028 mass grading and erosion and sediment control plan for pantops corner The $123,240 water protection performance bond (erosion only) has been posted and approved. The permit and first year inspection fee has been paid. Please contact Jeremy Glode to determine when you can schedule the pre - construction meeting. Thank you Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer@albemarle.org Project Name: Pantops Corner WPO file number: WP0201400028 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Numberinsf talledl stablization(PS, TS) 6.8 acres $5,000.00 $34,200.00 silt fence(SF) 600.0 ft $5.00 $3,000.00 safety fence (SAF) 1020.0 It $5.00 $5,100.00 diversion (DD, FD, RWD) 1470 ft $13.00 $19,110.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 earthwork for treplbesin height of dam st toe 14 fit cut M high side 18 ft height of fill at face 2 ft cut at face 0 It length of dem 240 ft length of cut 210 It top width 8 ft width of cut 10 It width = Y. ala, tlsr-ion. trianmular 56 (area above transition) 24 at (area below transition) 0 at (total width of dam) 28 ft (total width of cut) 46 It (height below transition) 12 It (depth below transition) 18 ft (arae below transition) 24 at (area all transition) 90 at (total 811 vdame) 426.7 cy (total cut volume) 700.0 cy length of spillway 32 It (TOAL CV estimate) 842 cy $13.00 $10,946.00 width of spillway 8 I (spillway stone tons) 14.7 tons $50.00 $735.00 structures for basin er height 6.5 ft ser diameter 30 in (riser unit pine) $65.00 $422.50 barrel length 62.4 ft Was plate or fdo 1 $200.00 $200 barrel diameter 24 in (barrel unit price) $50.00 $3,120.00 barrel talars 2 $200.00 $400 baffle length 80 ft $50.00 $4,000 earl for traps (ST -1, ST -2), cut qty, plan sheat 4 (204, 34.2 cy wet storage) 238 cy $13.00 $3,094.00 tree protection Oct. -50-t material/tray Oft $sob $0.00 silt fence inlet protection (I P) 0 $10000 $0.00 stone inlet protection (I P) 1 $20000 $200.00 outlet protection (OP) length 35 ft width (ST -1) 8 ft 1 S1.26o 00 $1,260.00 outlet protection (OP) length, total 42 ft width fS8-1, CE -18" CMP E It 1 S1..134 M $1,134.00 channel (SCC, mated) length 103 ft width 8 ft $1,071.20 check dam depth In channel 1 ft channel width 10 ft 0 $225 00 $0.00 construction entrance(CE) 1 S200000 $2,000.00 wash rack 1 52.00000 $2,000.00 paved construction entrance 0 53,50000 $0.00 riPrep, placed depth 0 ft length 0.0 It width 0.0 (tons) 0 tons $60 00 $0.00 survey and layout (price per 0.1 m1.) acres 6.85 traps and basins 3 $4,925.00 mcblllostion $500.00 stresm crossing (computed Independently) $0.00 cost sum $97,417.70 pro] mgmt $14,612.66 contingency $11,203.04 Total $123,240 6/30/2014 JptSLai t it Ora, Mte Rrrr{�r+f; tl_ �("" F`jF it ihii9• Recrited 10121r: tFit tu,t *#,Mrs" A"k-t " +_ t�//iC7tTN�t` BOND ESTINNIATE REQUEST APPROVED PROJECT PLAN TITLE: (Title on the approve plan froth whtch tlicestimate a ill he preparaxl.) Miss r�td►�rlA 0104 694Et't ct11 - (&'Mgnf C&IiWl Lot L � irat�r- J All parcels in tate project, including any off -Site work if casements are not provided, and Current owners. Use a separate sheet if more owners are required. Owner and tax map information trust be correct, and plans must be approved prior to bond estimates being prepared. TAX MAPS i PARCF.Ls: OWNER'S r j' "�t"I �SIGNATURE}rra., TAX MAPS t PARCELS: OWNER'S NAME: SIGNATURI?: TAX NIAPst PARCELS: OWNER'S NAME: SIGNATURE: TAX MAPS 3" PARCELS: OWNER'S \AMI:: date: date: SIGNATURE: date: TAX MAPS / PARCELS: OWNrR'S NAME: SIGNATURE: date: The requested estimates are; 9 .Erosion R Sediment Control per Nater Protection Ordinance section 17-207 Siorm►vater Management per Water Protection Ordinance section 17-306 © Subdivision (roads. drainage, etc,) per Subdivision Ordinance section 14-135; & Water & Scu.,cr per Subdivision Ordinance section 14-4i-5: S250 fee required The estimate must Ix sent to the owner. Please provide contact information. EMAIL:�tC OR REGULAR .MAIL ADDRLSS: r R[511N I I Ih2Dt I