HomeMy WebLinkAboutWPO201400037 Correspondence 2014-05-07 Max Greene From: Rob Umberger[rumberger @wwassociates.net] Sent: Wednesday, May 07, 2014 9:38 AM To: Max Greene Subject: Stonefield SWM Amendment and Final Site Plan Amendment Max, You had asked for a description of what the changes were for the amendments that we have submitted. Both the SWM amendment and the Final Site Plan Amendment have been submitted to allow for the utility and stormwater infrastructure to be installed for the Costco building and allow for the design and construction of the "G" block in Stonefield. The building locations have shifted since we first laid out the current approved plans. For the SWM Amendment: The Vorthechs and Stormfilter units were relocated approximately 140 feet East towards Rt. 29. The relocation of these devices required the addition of manhole 167.1 in order to maintain a distance of less than 300 feet between manholes. Manhole 176 on the pipe run that collects the runoff from the North Sperry Interceptor was relocated approximately 90 feet North and 120 feet East. The point of connection for the North Sperry Interceptor was relocated to MH 169. Additionally MH 181 that collects the drainage from RT. 29 has been reconfigured to tie into the pipes discharging from the North UGD. The revisions to the North Sperry Interceptor and the pipes from Rt. 29 allow for one connection point to the existing 42" pipe under Rt. 29 rather than the three points of connection proposed on the previous amendment. For the Final Site Plan Amendment: The water and sewer lines were adjusted to go around a proposed building that will be constructed on the north east corner of block"G". In addition we relocated the parking in block"G" so that it would be installed where the Vortechs and Stormfilter will be installed. If you have any questions please give me a call. Thanks, Rob Umberger Project Manager ENGINEERS A SMINORS PLANNERS ASSOCIATES Office Phone: 434.960.7589 Main: 434.984.2700 Fax: 434.978.1444 3040 Avemore Square Place Charlottesville,VA 22911 rumberger(wwassociates.net www.wwassociates.net 1 aBlocks F&G March 24,,2014 FAULCONER M Faulconer Construction 1 ,.f. 44IF. ' Ii2'\ F 4A•i . 's\ '3 Description Quantity Unit Unit Price Total Price Storm Sewer Pipe Storm Pipe SWM Plan 15"CMP 5 LF 91.00 455.00 15"HDPE 84 LF 45.00 3,780.00 15"RCP CL V 300 LF 57.00 17,100.00 18"HDPE Temp 47 LF 51.00 2,397.00 18"HDPE 258 LF 43.00 11,094.00 21"HDPE 300 LF 66.00 19,800.00 24"CMP 76 LF 131.00 9,956.00 24"HDPE 188 LF 72.00 13,536.00 30"HDPE 202 LF 84.00 16,968.00 36"HDPE HFBP Interconnect 28 LF 167.00 4,676.00 36"HDPE 264 LF 72.00 19,008.00 42"CMP 6 LF 166.00 996.00 42"RCP CL V 630 LF 345.00 217,350.00 48"CMP 85 LF 194.00 16,490.00 18"HDPE Abandoment/Removal 47 LF 13.00 611.00 24"CMP Abondment/Removal 20 LF 15.00 300.00 48"HDPE Removal 40 LF 18.00 720.00 48"HDPE Abandoment 787 LF 50.00 39,350.00 Trench Rock 1 LS 22,500.00 22,500.00 Subtotal Storm Sewer Pipe 417,087.00 Storm Structures Storm Structures SWM Plan Manholes-Storm 23 EA 8,300.00 190,900.00 Inlets 3 EA 8,100.00 24,300.00 Pond Control Structure 1 EA 18,500.00 18,500.00 Subtotal Storm Structures 233,700.00 Underground Stormwater Storage Facility Contech Storm Filter 1 LS 553,000.00 553,000.00 Contech Vortechs 1 LS 72,700.00 72,700.00 Contech Underground Detention System 1 LS 1,380,700.00 1,380,700.00 Subtotal Underground SWM Facility 2,006,400.00 Total Project 2,657,187.00 Page 1 of 1