Loading...
HomeMy WebLinkAboutWPO201400037 Bond Estimates 2014-05-13Project Name: Albemarle Place Stormwater Management Plan WPO file number: WPO201400037 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate 4' manhole strucure (per ft. rise) 5' manhole structure (per ft. rise) 6' manhole structure (per ft. rise) 8' manhole structure (per ft. rise) 138" Deteefl- Pipes pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48 ") pipe, rop, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48 ") aggregate base or drainage stone Vortechs Made 7000 Stone Filter Vault underground Vault trees shrubs seedlings rvey and layout (price per 0.1 mi.) acres mobiliution as -buift drawings (per facility) materials testing (per facility) 138 in d $13.00 $0.00 15.0 in d 0 ES-1,4 0 EC-5 18.0 in d 0 ES -1,3 0 EC4 24.0 in d 0 ES -1,2 0 EC-3 30.0 in d 0 ES -1,1 0 EC -2 36.0 in d 0 ES -1,0 0 EC -1 42.0 in d 0 ES -1,1 0 EC-0 48.0 in d 0 ES -1,2 0 EC -1 140.0 in d 3000.0 ft L &0 ft W 1 basins 0 No. Unit Unit Cost Cost installed 0 ft $13.00 $0.00 40 ea $500.00 $20,000.00 3- $3,500.00 $10,500.00 146 ft $450.00 $65,700.00 72 ft $500.00 $36,000.00 191 ft $550.0 $105,050.00 32 ft $700.00 $22,400.00 2035 ft $300.00 $610,500.00 487.0 ft $35.00 $17,045.00 315.0 ft $40.00 $12,600.00 45.0 ft $50.00 $2,250.00 560.0 ft $65.00 $36,400.00 294.0 ft $70.00 $20,580.00 714.0 ft $75.00 $53,550.00 85.0 ft $150.00 $12,750.00 12250.0 tan $35.00 $428,750.00 1 as $72;700.00 $72,700.00 1 ea 553000 $553,000.00 1 $1,380,700.00 $1,380,700.00 0- $150.00 $0.00 o se $50.00 $0.00 0 ea $5.00 $0.00 $500.00 $500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 cost sum $3,485,475.00 prof mgmt $519,821.25 contingency $398,529.83 Total $4,383,830 Page 1 SWIM _bond_est_131Vay2014 Om Project Name: Albemarle Place mwater Management Plan WPO file number: W12020 7 Stormwater Manage t Plan Bond Estimate Item Ism, Number pem+w+ divmagn.tliCn 0 h $1300 $000 marmdn ole beets tap ina nlet) 40 ea $500.00 $20,00000 dap nlm or vme 3 ea $3,50000 $10,50000 4- mmlllole stumur 4w ft nse) 146h 545000 $65,70000 6mnholestOCture Wxtt —) 72 n 550000 $36,00000 6' ma+hde SY t" (per» nee) 191 h $55000 $105,06000 amenrld4 avaaare {porn nse) 3211 $70000 $22,40000 138' Det Iw Ppm 138 in d $30000 $610,50000 ppe, rCP, amp(15 b 48') 550+sd 0ES -1,4 ppe,mp,cnip 5041n 80 0ES -1,3 ppe, mp. Crrp 05 w 4') 240md 0ES -1,2 ppe, rcp, a (15 fo 48') 300 in d 0 ES.," ppa, mp,C V(15 048) 3&0nd 0ES -1,0 ppe, rCP. amp (15 W 4T) 420 m d 0 ES -1,5 pipe, r . amp (15 p 481 480 an d 0 ES -12 .ggre9me base ar k—w sbne 1400 m d 3000.0 n L VW9Chs MOCbI 7000 10ea $72,70000 $72,70000 F SIOrm FiM1er Vmm 10- 553000 $Yi:`W99" o as $15000 $brans 0- $5000 $000 seedwVS survey and layal (pots per01 m) acres 0. 1 besets mob$ =mbn $,50000 .-tIA drmwnps (W I..Ati) 5500 w matenms teean9(perfa6w) 1 ea 52,00000 $2,00000 menuIe and lacisUes {asecn manulac 5lrefs or cOnsaabYS P—asa betel �,�A ' 1`i ✓ 3 n1 una Cos Q= 6'D?-,-7dl4U3`T w-pa 20 t evv e�'l a� /,-"J "/2014 �#�"trYGS 0 h $1300 $000 40 ea $500.00 $20,00000 3 ea $3,50000 $10,50000 146h 545000 $65,70000 72 n 550000 $36,00000 191 h $55000 $105,06000 3211 $70000 $22,40000 2035 M1 $30000 $610,50000 0 EC 5 487 0 n $3500 $17,045.3 0 EC 4 3150 n $4000 512,60000 0 EC-3 450n $5000 $2,250.00 0 EC-2 560.0 n $6500 $36.400.00 0 EC -s 294.0 n $7000 $20,580.00 0 EC 7140 fl $7500 $53,550,00 0 EC-1 850h $150.00 $12,75000 50nW 122500 fan $3500 $428,75000 10ea $72,70000 $72,70000 10- 553000 $Yi:`W99" o as $15000 0- $5000 $000 0. $500 $000 0 $,50000 5500 w 1 ea 52,00000 $2,00000 I - 52,00000 52,00000 5000 ' coal sum $2,084,77500 prol m9" 5312,71625 —.0—Y $239,74913 Total 3*b�o 6'D?-,-7dl4U3`T w-pa 20 t evv e�'l a� /,-"J "/2014 �#�"trYGS Project Name: Albemarle Place Stormwater Management Plan WPO file number: WP0201400037 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) $13.00 drop inlet or grate 4' manhole structure (per ft. rise) 40 ea 5 manhole structure (per ft. rise) $20,000.00 6' manhole structure (per ft. rise) 8' manhole structure (per ft. rise) $3,500.00 138" Detention Pipes 138 in d pipe, rcp, cmp (15 to 48') 15.0 in of pipe, rcp, cmp (15 to 48 ") 18.0 in d pipe, rcp, cmp (15 to 48') 24.0 in of pipe, rcp, cmp (15 to 48 ") 30.0 in d pipe, rcp, cmp (15 to 48') 36.0 in of pipe, rcp, cmp (15 to 48 ") 42.0 in d pipe, rcp, cmp (15 to 48') 48.0 in of aggregate base or drainage stone 140.0 in d Vartechs Model 7000 $700.00 Stone Filter Vault underground Vault 2035 ft Vass $610,500.00 shrubs 0 EC -5 seedlings $35.00 survey and layout (price per 0.1 mi.) acres 1 mobilization 315.0 ft as -built drawings (per facility) $12,600.00 materials testing (per facility) 0 EC -3 manufactured facilities (attach manufacture's or contractors price as a base No. Unit Unit Cost Cost (installed) Total $2,637,250 5/9/2014 0 ft $13.00 $0.00 40 ea $500.00 $20,000.00 3 ea $3,500.00 $10,500.00 146 ft $450.00 $65,700.00 72 ft $500.00 $36,000.00 191 ft $550.00 $105,050.00 32 ft $700.00 $22,400.00 2035 ft $300.00 $610,500.00 0 ES -1,4 0 EC -5 487.0 ft $35.00 $17,045.00 0 ES -1,3 0 EC -4 315.0 ft $40.00 $12,600.00 0 ES -1,2 0 EC -3 45.0 ft $50.00 $2,250.00 0 ES -1,1 0 EC -2 560.0 ft $65.00 $36,400.00 0 ES -1,0 0 EC -1 294.0 ft $70.00 $20,580.00 0 ES -1,1 0 EC -0 714.0 ft $75.00 $53,550.00 0 ES -1,2 0 EC -1 85.0 ft $150.00 $12,750.00 3000.0 ft L 5.0 ft w 12250.0 ton $35.00 $428,750.00 1.0 ea $72,700.00 $72,700.00 1.0 ea 553000 $553,000.00 ########### $0.00 0 ea $150.00 $0.00 0 ea $50.00 $0.00 0 ea $5.00 $0.00 basins 0 $500.00 $500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 $0.00 costsum $2,084,775.00 pal mgmt $312,716.25 contingency $239,749.13 Total $2,637,250 5/9/2014