HomeMy WebLinkAboutWPO201400049 Bond Estimates 2014-07-02Project Name: Jim Price Automotive WPO file number: WPO201400049 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) stablization (PS, TS)1.0 acres $5,000.00 $5,000.00 silt fence (SF)400.0 ft $5.00 $2,000.00 safety fence (SAF)0.0 ft $5.00 $0.00 diversion (DD, FD, RWD)0 ft $13.00 $0.00 temporary slope drain (TSD)pipe length 0 ft pipe diameter 0 in $0.00 $0.00 earthwork for trap/basin height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition)0 sf (area below transition)0 sf (total width of dam)0 ft (total width of cut)0 ft (height below transition)0 ft (depth below transition)0 ft (area below transition)0 sf (area above transition)0 sf (total fill volume)0.0 cy (total fill volume)0.0 cy length of spillway 0 ft (TOAL CY estimate)0 cy $13.00 $0.00 width of spillway 0 ft (spillway stone tons)0 tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (riser unit price)$0.00 $0.00 barrel length 0 ft base plate or fdn 0 $200.00 $0 barrel diameter 0 in (barrel unit price)$0.00 $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 silt fence inlet protection (IP)0 $100.00 $0.00 stone inlet protection (IP)6 $200.00 $1,200.00 outlet protection (OP)length 0 ft width 0 ft 0 $0.00 $0.00 channel (SCC, matted)length 0 ft width 0 ft 0 $0.00 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 $0.00 construction entrance (CE)0 $2,000.00 $0.00 wash rack 0 $2,000.00 $0.00 paved construction entrance 1 $3,500.00 $3,500.00 rip-rap, placed depth 0 ft length 0.0 ft width 0.0 (tons)0 tons $60.00 $0.00 survey and layout (price per 0.1 mi.)acres 0 traps and basins 0 $0.00 mobilization $500.00 stream crossing (computed independently)$0.00 cost sum $12,200.00 proj mgmt $1,830.00 contingency $1,403.00 Total $15,440 12/16/2014