Loading...
HomeMy WebLinkAboutWPO201400073 Bond Estimates 2015-05-29Project Name: South Rivanna Water Treatment Plant GAC Upgrades WPO file number: WP0201400073 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in earthwork for trap /basin length 0 ft width 0 ft height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition) 0 sf (area below transition; . sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition) 0 ft (depth below transitior 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy width of spillway 0 ft (spillway stone tons) 0 tons structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft base plate or fdn 0 barrel diameter 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft silt fence inlet protection (I P) stone inlet protection (IP) outlet protection (OP) length 0 ft width 0 ft channel (SCC, matted) length 0 ft width 0 ft MMT Outlet stone depth in silt fence 3 ft channel width 10 ft construction entrance (CE) $0.00 $0.00 $0.00 wash rack $0.00 1 $675.00 $675.00 paved construction entrance $4,000.00 0 $2,000.00 $0.00 rip -rap, placed depth 0 ft length 0 ft width 0 (tons) survey and layout (price per 0.1 mi.) acres 0 traps and basins mobilization stream crossing (computed independently) No. Unit Unit Cost Cost installed 1.75 acres $5,000.00 $8,750.00 1300 ft $5.00 $6,500.00 0 ft $5.00 $0.00 0 ft $13.00 $0.00 5 $200.00 $0.00 $0.00 $13.00 $0.00 $50.00 $0.00 $0.00 $500.00 $0.00 cost sum $0.00 $200.00 $0 contingency $0.00 $200.00 $0 $50.00 $0 0 $100.00 $0.00 5 $200.00 $1,000.00 0 $0.00 $0.00 $0.00 1 $675.00 $675.00 2 $2,000.00 $4,000.00 0 $2,000.00 $0.00 0 $3,500.00 $0.00 $60.00 $0.00 $0.00 $500.00 $0.00 cost sum $21,425.00 proj mgmt $3,213.75 contingency $2,463.88 Total $27,110 5/29/2015 Project Name: South Rivanna Water Treatment Plant GAC Upgrades WPO file number: WPO201400073 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 5/29/2015 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2:1 for simplicty .y Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width *height)12 - height x height Length of Cut liment traps and basins Width ►n point Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately) Project Name: South Rivanna Water Treatment Plant GAC Upgrades WPO file number: wpo201400073 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48 ") aggregate base or drainage stone earthwork for trap /basin structures for basin 15.0 in d 0 ES -1,2 42.0 in d 25.0 ft L No. Unit Unit Cost Cost installed Oft 2 ea 1 ea 21 ft 0 EC -1 80.0 ft 40.0 ft W 245.0 ton height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition 0 sf (area below transition J Sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transit 0 ft (depth below transitio 0 ft (area below transition) 0 sf (area above transitior 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy width of spillway 0 ft (spillway stone tons) 0 tons riser height 0 ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft base plate or fdn 0 barrel diameter 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft trees shrubs seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 0 ft length width 0.0 (tons) survey and layout (price per 0.1 mi.) acres 1 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 0.0 ft 0 1 $13.00 $0.00 $500.00 $1,000.00 $3,500.00 $3,500.00 $450.00 $9,450.00 $35.00 $2,800.00 $35.00 $8,575.00 $13.00 $50.00 $200.00 $200.00 $50.00 0 ea $150.00 0 ea $50.00 0 ea $5.00 50 ft $5.00 110 cy $38.00 0 ft $1,500.00 0 ft $50.00 $60.00 1 ea $2,000.00 1 as $2,000.00 1 as $5,000.00 cost sum proj mgmt $0.00 $0.00 $0.00 $0 $0.00 $0 $0 $0.00 $0.00 $0.00 $250.00 $4,180.00 $0.00 $0.00 $0.00 $1,000.00 $500.00 $2,000.00 $2,000.00 $5,000.00 $0.00 $40,255.00 $6,038.25 5/29/2015 Project Name: South Rivanna Water Treatment Plant GAC Upgrades WPO file number: wpo201400073 Stormwater Management Plan Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) contingency $4,629.33 Total $50,930 5/29/2015