Loading...
HomeMy WebLinkAboutSDP200600109 Calculations Minor Amendmentti ct lK f 9EA _�.�[� �;� �= � u � �� � ;� "� ; 1°�. `,�1� r=te � rte, � i� � T "�... r' ' A � ��. V � t ci rz vvE Short Version BMP Computations For worksheets 2 - 6 One Area Analysis Albemarle County Water Protection Ordinance: Modified Simple Method Westminster Canterbury Plan: 6 Duplex Replacement Water Resources Area: Upper Rivanna River Preparer: Kurt M. Gloeckner, P.E.R.L.S. Date: 25- Aug -06 Project Drainage Area Designation DA #1 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Treat Total as Road Only Pj small storm correction factor, 0.9 for Ease of Analysis I percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area, A = 4.02 C pollutant concentration, mg /I or ppm target phosphorus Use Total Areas as Shown in f factor applied to RR Accompanying Sheets V required treatment volume in cy, 0.5' over imperv. area = A(I)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) %RR removal efficiency, RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length Width subtotal Length Width subtotal 3207.6 22 70567.2 4059 22 89298 0 0 0 0 0 0 0 705671 0 89298 Driveways Length Width no. subtotal Length Width no. subtotal and walks 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 0 1 0 0 Gravel areas Area Area 0 x0.70= 0 x0.70= 0 Structures Area no. subtotal Area no. subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0 Actively - grazed pasture & Area Area yards and cultivated turf x 0.08 = 0 x 0.08 = 0 Active crop land Area Area 0 x0.25= 0 0 x0.25= 0 Other Impervious Areas 0 0 Impervious Cover 40% 51 % I(pre) I(post) Rv(post) V 0.51 137.8 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR % RR Area Type 0.70 1.00 20% 0.41 10.18 12.56 2.38 19% Development Area 0.35 1.00 0% 0.41 5.09 6.28 1.19 19% Drinking Water Watersheds 0.40 1.00 1 % 0.41 5.82 7.18 1.36 19% Other Rural Land * min. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR % RR Area Type 0.70 0.90 20% 0.41 10.18 12.56 3.39 27% Development Area 0.35 0.85 0% 0.41 5.09 6.28 1.95 31% Drinking Water Watersheds 0.40 0.85 1 % 0.41 5.82 7.18 2.23 31% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB � $� l ,ya s ® � � \# C)S � . v � ® «o ® �ƒ�..�, s + t r �# ! o6N \ . r t ��. ,\) � a s 4 ®� $/• �aa � ® gk A -15, 7 5 & s A 4��5 ,f , - 1p npMEN DRAINAGE AREA IMPERVIOUS AREA AND POROUS AREA i DUPLEX COTTAGE REPLACEME SOUTH EAST QUADRANT OF CAMPUS MINOR AMENDMEN DRAWING NEWCOTT AGES2.DWG JOB NUMBER 9 - 7— C)113-31 / DA -1 3.11 AC. ,35.807.5 t 1 AC SO-FT- 39.450.30 SQ.FT. 0.81 AC. 701AL DRAINAGE AREA 175,257,52 ACO.FT. DA -1 0.91 AC. TOTAL DRAINAGE AREA 175,257.82 SOFT - 4.02 AC. TOTAL IMPER'AOUS 70,739.27 SOFT. _ TOTAL POROU FT. 104.51 2,40 ACRES IMPER`ou 63.774.34 SQ.FT, 1.46 ACRES IMPERVIOUS 2,661.34 SOFT. 0.06 ACRES IMPERVIOUS 2,493 CR 6A 63,77 . CRES IMPERVIOUS 2,661.3 SO 0.06 ACRES 1,810.04 SQ.FT. 2,493.55 SQ•FT. 0.04 ACRES 0.06 ACRES 1.610.04 SOFT. 0.04 ACRES too 39 7 275 Qa T 1.62 ACRES TOTAL DRAINAGE AREA 175,257.82 SOFT - 4.02 AC. TOTAL IMPER'AOUS 70,739.27 SOFT. _ TOTAL POROU FT. 104.51 2,40 ACRES Short Version BMP Computations For wmrksheets 2 - 6 Two Area Analysis Albemarle County Water Protection Ordinance: Modified Simple Method Westminster Canterbury Plan: 6 Duplex Replacement Water Resources Area: Upper Rivanna River Preparer: Kurt M. Gloeckner, P. E., P. L.S. Date: 25- Aug -06 Project Drainage Area Designation DA #1 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Treat Total as Road Only Pi small storm correction factor, 0.9 for Ease of Analysis I percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area, A = 3.71 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5" over imperv. area = A(1)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) %RR removal efficiency, RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length Width subtotal Length Width subtotal 2791.8 22 61419.6 2910.6 22 64033.2 0 0 0 0 0 0 0 61419.6 0 64033.2 Driveways Length Width no. subtotal Length Width no, subtotal and walks 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 0 1 0 0 Gravel areas Area Area 0 x0.70= 0 x0.70= 0 Structures Area no. subtotal Area no. subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0 Actively- grazed pasture & Area Area yards and cultivated turf x 0.08 = 0 x 0.08 = 0 Active crop land Area Area 0 x0.25= 0 0 x0.25= 0 Other Impervious Areas 0 0 Impervious Cover 38% 40% I(pre) I(post) Rv(post) V 0.41 98.8 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR % RR Area Type 0.70 1.00 20% 0.39 8.93 9.26 0.33 4% Development Area 0.35 1.00 0% 0.39 4.46 4.63 0.17 4% Drinking Water Watersheds 0.40 1.00 1 % 0.39 5.10 5.29 0.19 4% Other Rural Land min. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR % RR Area Type 0.70 0.90 20% 0.39 8.93 9.26 1.22 13% Development Area 0.35 0.85 0% 0.39 4.46 4.63 0.84 18% Drinking Water Watersheds 0.40 0.85 1 % 0.39 5.10 5.29 0.95 18% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB Short Version BMP Computations For Worksheets 2 - 6 Two Area Analysis Albemarle County Water Protection Ordinance: Modified Simple Method Westminster Canterbury Plan: 6 Duplex Replacement Water Resources Area: Upper Rivanna River Preparer: Kurt M. Gloeckner, P.E.R.L.S. Date: 25- Aug -06 Project Drainage Area Designation DA #2 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 j Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Treat Total as Road Only Pj small storm correction factor, 0.9 for Ease of Analysis 1 percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area, A = 0.85 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5' over imperv. area = A(1)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) %RR removal efficiency, RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length Width subtotal Length Width subtotal 415.8 22 9147.6 534.6 22 11761.2 0 0 0 0 0 0 0 9147.6 0 11761.2 Driveways Length Width no. subtotal Length Width no. subtotal and walks 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 0 1 0 0 Gravel areas Area Area 0 x0.70= 0 x0.70= 0 Structures Area no. subtotal Area no. subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0 Actively- grazed pasture & Area Area yards and cultivated turf x 0.08 = 0 x 0.08 = 0 Active crop land Area Area 0 x0.25= 0 0 x0.25= 0 Other Impervious Areas 0 0 Impervious Cover 25% 32 0 /c '(pre) [(post) Rv(post) V 0.34 18.2 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR % RR Area Type 0.70 1.00 20% 0.27 1.42 1.75 0.33 19% Development Area 0.35 1.00 0% 0.27 0.71 0.88 0.17 19% Drinking Water Watersheds 0.40 1.00 1 % 0.27 0.81 1.00 0.19 19% Other Rural Land * min. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR % RR Area Type 0.70 0.90 20% 0.27 1.42 1.75 0.47 27% Development Area 0.35 0.85 0% 0.27 0.71 0.88 0.27 31% Drinking Water Watersheds 0.40 0.85 1% 0.27 0.81 1.00 0.31 31% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB DRAINAGE AREA IMPERVIOUS AREA AND POROUS AREA PRE - DEVELOPMENT DUPLEX COTTAGE REPLACEMENT SOUTH EAST QUADRANT OF CAMPUS MINOR AMENDMENT DRAWING NEWCOTTAGES2.DWG JOB NUMBER 97- 018 -31 DA -II 0.91 AC. DRAINAGE AREA IMPERVIOUS AREA AND POROUS AREA POST DEVELOPMENT DUPLEX COTTAGE REPLACEMENT SOUTH EAST QUADRANT OF CAMPUS MINOR AMENDMENT DRAWING NEWCOTTAGES2.DWG PRE - DEVELOPMENT 39,450.30 SQ.FT 0.91 AC. 36,977.61 SQ.FT 0.85 AC. DA -II 0.85 AC. 39,450.30 SQ.FT. 0.91 AC. 30,761.79 SQ.FT. - 0.70 ACRES IMPERVIOUS 8,688.51 SQ.FT. 0.21 AC. POST DEVELOPMENT 36,977.61 SQ.FT. 0.85 AC. 25,498.26 SQ.FT. - 0.58 ACRES IMPERVIOUS 36,977.61 SQ.FT. 0.27 AC. JOB NUMBER 97- 018 -31 CC � -F- I .. `- �-- ��,.�`3 i � � � �� v'` �. �� � i�� tom. t� '�' .�,- � . � .� �'s P-1