Loading...
HomeMy WebLinkAboutWPO201400095 Approval - County 2015-06-03�pF A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP Permit plan review Approved Project: Glenmore K2C Plan preparer: Graham Murray, Collins Engineering [200 Garrett St., Suite K, Charlottesville, VA 22902, rag ham(a)collins -en in�g com, scott(ccollins- engineering.com] Owner or rep.: Glenmore Associates Limited Partnership, P.O. Box 7623 Charlottesville, VA 22906 Plan received date: 13 Mar 2015 (Rev. 1) 7 May 2015 (Rev. 2) 2 Jun 2015 Date of comments: 10 Apr 2015 (Rev. 1) 29 May 2015 (Rev. 2) 3 Jun 2015 - Approved Reviewer: John Anderson Prior review comments addressed. Prior comments removed to condense document —Ref CV system —link to prior comments: htta:// www. albemarle .orp-/weblink8 /search.asDx ?dbid =3 &searchcommand= %7b %5bCDD- Planning %5d: % 5bApplicationNumber %5d= %22WPO201400095 %22 %7d Reminder — Update 11" x 17" plan sheet inserts /SWPPP Exhibit; Construction Activity Operator must sign SWPPP. Submit 1 print copy. Please submit four (4) copies of plans that reflect revisions submitted 2 -Jun, and 28 -May (e- Attachment). We commend design efforts. Please see PROCESS, below —thank you Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. Engineering Review Comments Page 2 of 2 After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to request a pre - construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hllp://www.albemarle.orgJdeptforms.asp?dei2artinent--cdengno Thank you - 434.296 -5832 —x3069 File: WP0201400095 Glenmore K2C 060315rev2 VSMP