Loading...
HomeMy WebLinkAboutSUB201500067 Action Letter 2015-06-08• VIM(- . COUNTY OF AT SEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 June 8, 2015 Scott Collins, PE Collins Engineering 200 Garrett Street, Suite K Charlottesville, VA 22902 RE: SUB 201500067 Briarwood (Phase 4 (L34 -35) Phase 5 (1,26) Phase 6 L27 -33) — preliminary subdivision Mr. Collins: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced subdivision plat. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final subdivision plat for all or a portion of the site within one (1) year after the date of this letter as provided in 14 -226 of the Subdivision Ordinance of the County Code, and thereafter diligently_ pursues approval of the final_ subdivision plat. _ The following are prerequisite to an Engineering recommendation for final subdivision plat approval: 1. Approval of an Erosion and Sediment Control Plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. [17 -402] 2. Approval of a. Stormwater Management Plan meeting the requirements of Chapter 17 of the Code. [17 -403] 3. Approval of a Pollution Prevention Plan meeting the requirements of Chapter 17 of the Code. [17 -404] 4. Approval of a Stormwater Pollution Prevention Plan meeting the requirements of Chapter 17 of the Code. [17 -405] 5. Approval of all easements for facilities for stormwater management and drainage control. 6 Approval of a mitigation plan for the disturbance of Water Protection Ordinance buffers, if necessary. [17 -406] These approvals may have been obtained (provide WPO number). See items required for Engineering Division Approval, p..4. The final subdivision plat will not be considered to have been officially submitted until the following items are received: 1. A final subdivision plat that satisfies all of the requirements of 14 -226 of the Subdivision Ordinance. 2. A fee of $1,100. — Please submit eight (8) copies of the subdivision plat to the Community Development Department. The assigned Lead Reviewer will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the final subdivision plat; please work with each reviewer individually to satisfy their requirements. The final subdivision plat will not be approved until the following conditions are met: The Department of Community Development shall not accept submittal of the final subdivision plat for signature until tentative approvals for the following conditions have been obtained: Planning Division Approval of (3 copies): 1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance. 2. [Comment] Was the existing right of way, Sunset Drive, truly approved and dedicated to public use between lot 43 and Lot 37? The last plat that was approved on this roadway only dedicated the right of way up to Lot 43, where it ended with a temporary turn around. Thus this would make the right of way beyond Lot 43 proposed rather than existing. If this is the case, assure it is revised appropriately. Also, a road plan for this section of road will need to be submitted, reviewed, approved, and built or bonded prior to final subdivision plat approval, if such has not already been completed for this section of road. Also, on the final plat the temporary turn around shall be abandoned. [Application plan, Proffer 41 On the plat it is not clear what is taking place with the remainder of the land in Phase 5, specifically the area beyond the 0.37 acres of open space depicted? Dedication of the Phase 5 open space is required with this plat. When the final is submitted assure you track the amount of open space which is within the 100 year floodplain and the amount of land which is critical or preserved slopes to assure that the site is still within the required open space pursuant to Chapter 18 Section 4.7(c)3. 4. [Application plan, Proffer 4] The application plan lists the Phase 5 open space area mentioned above as "Passive Recreational Area consisting of walking /jogging trails ". On the plat assure it is also labeled as such. 5. [Proffer #4] "... the dedication of open space with the approval of phase 4 and 5 for passive recreational area which shall include the construction of walking /jogging trails... Prior to final plat approval provide an exhibit which depicts the location of the walking /jogging trails in Phase 5 open space (which are to be constructed as primitive paths). This exhibit will be used to bond the improvements through a Zoning performance bond prior to final plat approval. Also, the application plan appears to depict access to the recreational areas mentioned above being in the location of Lot 31. If Lot 31 is to remain as a lot for sale, it is not clear where the access to the open space areas is coming from. Please provide access to the open space areas from the public road as required by the application plan. [14 -317] Instrument evidencing maintenance of certain improvements. Documents relevant to dedication and /or maintenance of open space must be provided for review to the County Attorney in order for final subdivision plat approval. Please submit a draft of this document to me and I will review it and forward it to the County Attorney for his review/ approval. 7. [Application plan, note #51 "The developer shall provide one interparcel connection to the Camelot subdivision. The said connection shall beprovided at Point A or B as shown and will be determined with final engineering design. The connection shall be approved and bonded prior to 2 the issuance of any building permits for homes in phase 4. " This plat proposes to divide /plat 2 lots in Phase 4 (Lots 34 & 35), as such the connection at either point A or B shall be approved and bonded prior to the issuance of any building permit for homes in Phase 4. Currently neither of the connections has been applied for, approved or bonded. If the developer chooses to move forward with the division of the lots in Phase 4, a note shall be provided on the final plat that provides notice that the issuance of the building permits for these lots shall be withheld till one of the two connection (A or B) is approved and bonded. 8. [Proffer 11 The maximum dwelling units permitted in Briarwood is 661. Proffer 9 provides a table for the proposed lot mix. A table providing the existing and proposed dwelling units by section must be provided on the final plat and updated with each submittal. 9. [14- 302(B)8] Yards. The setbacks for the project are front= 20', side= 6', rear 5', and building separation= 12'. On sheet 1 under setbacks assure the "12' building separation" is noted. Also provide a note which states "No minimum lot area is specified". Revise appropriately. 10. [14- 302(A)4 &5] Easements. On the plat provide deed book and page references for all existing easements. 11. [14- 302(A)8] Proposed lots. On the plat provide the dimensions for each lot. 12. [14- 302(B)5] Zoning. There is a typographical error under general notes, Zoning, the plat reads "AMA 2004 - 00014; however, it should truly be ZMA2004- 00014. Revise appropriately. 13. [14 -400; 18 -19.6, Proffer #1 & 91 On the plat the Open space Tabulations Chart appears to have an error in it, specifically it seems to be missing 5 lots which were platted in Phase 5 on 0.653 acres of land which was applied for under SUB2013 -112 and approved by the County on September 20, 2013. Notably there was no open space provided on that plat. Regardless, the chart should be revised to account for this_ acreage_and lot counts._ Revise appropriately. 14. [14- 400;18 -19.6, Proffer #1 & 9] Also, the above mentioned chart appears to have another error in it with regard to the current plat under review, specifically the last line which lists "PH 5, PH 6" total area platted 2.58 acres, with a total of 20 lots. Rather it appears this section should take into account the 2 lots being platted in Phase 4 on this plat. Also, assure that the total lot counts for this plat is accurate, currently this same section of the chart lists 20; however, it is truly 16. Revise appropriately. 15. [Comment] Under general notes, Phasing, all lots listed appear to be in error. For example: the plat currently lists "Phase 4 — Lots 7 -8 (2 lots total) "; however, it appears to truly be "Phase 4 plats Lots 34 and 35 (2 lots total). " 16. [14 -303F] Identification of sections, blocks, and lots. On the final plat provide a current phasing plan; it is important to identify overall street layout and how the plan fits into the existing street network. Please label applicable phases. Please contact Christopher P. Perez at 296-5 83 2 if you have questions or require additional information. Engineering Division Approval of (1 copy of site plan; WPO plan number stated in application): 1. Add existing public street RW deed of dedication information to plat. 2. Add DB -PG RW, drainage, ACSA, and any other existing easement information to plat. 3. A single -sheet preliminary plat is unusual. Provide guidance on whether or where approved road plan or WPO details for proposed plat may be found. Furnish approved road plan number (SUB) and /or WPO project number that may apply to this section of Briarwood (and may aid review). 4. Plat title is inconsistent with phasing general notes: Phase 4 (2 lots), Phase 5/6 (7 lots ea). Title and phase notes list different lot numbers. Revise. 5. Lots 26, 27, 28, and 29 structure FFEBSMT elevations differ by 20 -ft: Confirm that this is accurate design information. 6. Phase lines appear missing. Provide dashed: lines to demarcate all phases. Lot 26, for example, appears as though it may be in phase 6, yet this lot is listed with phase 5 lots. 7. Revise 2:1 grading in lawn areas. "For grass stabilization on constructed. slopes, the maximum steepness is 3:1". -ACDSM 8.A.2. Revise proposed contours for lawn areas, Lots 26, 27, 28, 29, or elsewhere, to 3:1, or flatter. Final plat contours should reflect Approved Site Plan, image below (SDP2006- 00041, The Engineering Groupe, sheet 18/53, 1/12/10). Current proposed plat contours reflect interim conditions: a steep slope to ESC measure that is a temporary condition. Image /SDP2006 -00041 8. Final plat approval requires approved road plan, approved VSMP /WPO. 9. Reserve right to revise or add comments when more information is available.. Please contact John Anderson at 296 -5832 if you have questions or require additional information. ACSA approval to include (1 cony to County, 3 copies to ACSA): 1. Please submit 3 sets of utility plans to Jeremy Lynn at the ACSA for review. This is required to determine which water meters must be relocated so that they are properly placed along the frontage of the new lots. In addition, the applicant should be aware that these lots fall within the North Fork Special Rate District North Zone for sanitary sewer service. These comments can be a condition of the final. It would be to the applicants advantage to submit the drawings ASAP, but I will recommend approval of the preliminary with conditions. Please contact Alex Morrison at 977 -4511 ext 116 if you have questions or require additional information. Fire & Rescue approval to include (1 copy) for review. Please contact Robbie Gilmer at 296 -5833 if you have questions or require additional information. VDOT approval to include (1 copy) for review. Please contact Troy Austin at 422 -9782 if you have questions or require additional information. E911 approval to include (1 copy) for review. Please contact Andrew Slack at 296 -5832 if you have questions or require additional information. If you have any questions about.these conditions or the submittal requirements please feel free to contact me at Extension 3443, cperez @albemarle.org. Sincerely, Christopher P. Perez Senior Planner 5