Loading...
HomeMy WebLinkAboutWPO201500031 Review Comments WPO VSMP 2015-06-08�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: VSMP Permit Plan Review Wilson Jones Company RCRA Cleanup WPO- 2015 -00031 Atlanta Environmental Management, Inc. Wilson Jones Company 13 May 2015 8 June 2015 Justin Deel County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Provided SWPPP appears to adequately address all items in County Code section 17 -405. Please reflect below requested changes in resubmitted SWPPP. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1. Provided PPP appears to adequately address all items in County Code section 17 -404. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. 1. Please explain what is to be done with the excavated material. 2. Are the "refurbished and/or installed access roads" to be permanent or temporary? If they are intended to remain in place, a nutrient (phosphorus) load reduction is required, as there will be an increase in impervious cover. Please remove the access roads once excavations are complete or provide SWM to account for the increase in imperviousness. Additionally, the existing roads or paths on this parcel do not appear to have cover, therefore refurbishment (adding crushed stone) will result in an increase in impervious cover requiring load reduction. Load reduction calculations much be performed using the Virginia Runoff Reduction Method (VRRM) spreadsheet, which can be found at http: / /www.deq.vir ig nia o�grams/ Water /Laws,Regulations,Guidance /Guidance /StormwaterM anagementGuidance. aspx Engineering Review Comments Page 2 of 2 D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17 -402. 1. Please show "construction entrance" (CE) [Virginia Erosion & Sediment Control Handbook, 3.02] on E &SC plan. 2. Please show staging and stockpile areas on plan. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re- submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htt):// www.albemarle.ore /dei)tforms.asi)?department= cdenizwpo File: WP0201500030 VSMP Review.doc