Loading...
HomeMy WebLinkAboutWPO201500019 Bond Estimates 2015-06-12Project Name: VDOT Wetsel Property Waste Area Plan WPO file number: WP0201500019 Erosion and Sediment Control Bond Estimate Item Item Number stal lization (PS, TS) all fence (SF) safety fence(SAF) diversion (DD, FD, RW D) temporary slope drain (TSD) pipe length earthwork for trap /basin length check dam height of dam at toe construction entrance (CE) height of fill at face wash rack length of dam paved construction entrance lap width rip-rap, placed (area above transition) 50 ft (total width of dam) survey and layout (price par 0.1 mi.) (height below transition) mobilization (area below transition) stream crossing (computed independently) (total fill volume) (depth below lransilior length of spillway 42 at width of spillway structures for basin 417.8 cy (total fill volume) riser height 40 ft riser diameter 483 cy barrel length (spillway stone tons) barrel diameter all fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) cut at face wash rack 80 it paved construction entrance 30 ft rip-rap, placed depth 50 ft width survey and layout (price par 0.1 mi.) acres mobilization (total width of cut) stream crossing (computed independently) 0 ft pipe diameter 0 in 13 ft cut at high side 7 ft 6 ft cut at face 0 ft 80 it length of cut 30 ft 4.5 ft width of cut 50 ft 90 at (area below transttion) 0 sf 26 ft (total width of cut) 64 ft 7 ft (depth below lransilior 7 ft 42 at (area above transition) 175 sf 417.8 cy (total fill volume) 194.4 cy 40 ft (TOAL CV estimate) 483 cy 18 ft (spillway stone tons) 41.4 tons Oft 0 in full unit price) so DD 0 ft base plate or fdo 0 0 in (barrel unit price) SO 00 barrel collars 0 baffle length 0 ft 0 it width 0 ft 0 it width 0 ft 1.5 it channel width 4 ft 0 it length 0 ft 0 (tons) 0 tons 0 traps and basins 1 No. Unit Unit Cost Cost (installed) 3 acres $5,000.00 $15,000.00 250 ft $5.00 $1,250.00 0 ft $5.00 $0.00 1300 ft $13.00 $16,900.00 $0.00 $0.09 0 0 0 58 1 1 0 cost sum rcj mgmt contingency Total $13.00 $6,279.00 $50.00 $2,070.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $100.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $135.00 $7,830.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $0.00 $60.00 $0.00 $500.00 $500.00 $0.00 $54,329.00 $8,149.35 $6,247.84 $68,730 6/12/2015 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2:1 for simplicty .y Height of Fill at Face I h1 Cut at High Side h2 transitic w h1 Width of Cut Cut at Fa Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width *height)12 - height x height Length of Cut liment traps and basins Width ►n point Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)