VSMP Permit plan review
Rivanna Village Phase 1
WP0201400077
Santec
RIVANNA VILLAGE LLC
4 June 2015
16 June 2015
Max Greene
[scott.blossom @stantec. com]
[ANDRE W.BONINTI @CBRE. COM]
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on
any VSMP permit by issuing a project approval or denial. This project is APPROVED. The VSMP
application content requirements can be found in County Code section 17 -401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Comments appear adequately addressed at this time.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17 -404.
2. Comments appear adequately addressed at this time.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is approved. The stormwater management plan content requirements can be
found in County Code section 17 -403.
3. Comments appear adequately addressed at this time.
C. Erosion and Sediment Control Plan (ESCP) Max Greene's comments
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This
plan is approved. The erosion control plan content requirements can be found in County Code section
17 -402.
4. Comments appear adequately addressed at this time.
Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss
this review.
Engineering Review Comments
Page 2 of 2
Process;
After approval, plans will need to bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will prepare
estimates and check parcel and easement information based on the approved plans. The County's Management
Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted
along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved
and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct
signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The
County's Management Analyst or other staff will prepare the forms and check for ownership and signature
information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local VSMP
authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the
state. For fastest processing, this is done electronically with the emails provided on the application. DEQ
should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will
issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference.
Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of
the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to
be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be
scheduled with the County inspector. At the pre - construction conference, should everything proceed
satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
http: / /www.albemarle.org/deptfonns .asp ?department= cdengwTo