Loading...
HomeMy WebLinkAboutWPO201400068 Bond Estimates 2015-01-12 Project Name: Farmington Country Club South Side Improvements WPO file number.WP0201400068 Erosion and Sediment Control Bond Estimate Item (lam Ns,Ilnd I/BAIA& tad Number linstolledt stablasatio(PS,TS) 2.5 acres ••- . $12,500.00 alt fence(SF) GOO ft $3.000.00 • W •' 'ety fence(SAP) 40 ft $200.00. emersion(DO.FD,RWD) 980 ft $4,880.00 temporew slope awns PIP.length 0 ft pipe claimer 0 in 0 ;,--:- $0.00 wirework be trep/been height of dan at toe 18 ft cut at high side 4-ft height ot NI at face Oft cut et face 2* Wigth or am 120 ft length of co 120 ft top Weft 0 ft width of cut 03'ft .Tdi ildth.d--., D.-'t :hoe!wet of cu0 "2 0 evil'we,f0,11,.. i. •lerrn too,..avert, .rtieh om'w thoser, .2 of ‘s..areiTo..rib'sni DO if N'O:.r... •ft.U ,1014, D/:1 cy WNW,el weary 43 ft ,:',0,•s'here*, 1 I lb'.-, $13.00 $14,754.00 width of spillway 11 ft !I,Alliore I hou wri ' trot $00.00 $1,330.00 structures for basin neer heght 0 ft riser diameter $0.00 barrel length 0 ft bow plate cr fen 0 $200.00 $0 barrel ammeter $0.00 • •. .. herr.eaters 0 $200.00 $0 baffle knoth 0.•ft $50.00 $0 WI fence est protection(IP) 0 0'0''.0- $0.00 Navin*protection(IP) 8 $‘0.4 OD $1,200.00 outlet protection(OP)(included In ripweft I length 0 ft width 0 ft 0 SOO• $0.00 chewed(SCC,meted) length 0 ft width 0 ft $0.00 cheek earn depth in theme 0 ft channel width 0 ft 0 $,00 $0.00 constructien entrance(CE) 0 $2...00 00 $0.00 welsh rack $.4000../., $2,000.00 1 pared construction entente 1 1.3..0300 00 $3,500.00 norm,Owed(OP end stone weir forebr depth 2 ft length 85 ft teeth 5.5 5.80 00 $2,488 75 survey and layout(pice per 0.1 nil.) ewes 2.5 traps end beans 1 $1.750.00 motazaften $500.00 strewn creasing(computed Independently) $0.00 bet sum $47,9S0 75 • prig mgmt $7.182.81 contingeray 65,514.94 Total 660,660• 1/12/2015 Project Name:Cascadia-Blocks 4-7 WPO file number: WPO201300032 Stormwater Management Plan Bond Estimate Ron) Rein Nu.Unit Unit CA$l Cost Nurnbet Gn$lelle7) permenenl diversbn or dith 0 ft 513.00 50.00 bntlartl manhole frame top lnot inter) 1 ea $50000 $500.00 drop rote,or grate 3 ea 53,500.00 510,50000 mennde structure(per Ir nse) 10 ft $450.00 $4,500 00 pipe.rcp,cmpl151o45') 'IS m d 3 ES-1,2 0 EG1 250 ft 53500 510.25000 egprepe,e base or drainage crone 0 0 in d 0 0 1t L 0 0 ft W 0 0 ton $35 00 $0.00 eererepk loebbr@er Ioompleted n E&S phsaa),See trap cleenoui bebv height of dam at toe 0 ft out at high side 0 ft height of fill at face 0 ft cid et face 0 ft length of dam 0 ft length of cut 0 ft op width 0 ft widm of cut 0 ft (area above tanuson) 0 sf (area below treneltlon) 0 at (hegnlEebw tr.nsi0on 0 ft (depth below tren5Adon 0 ft (brat fill volume) 0 00 (Octal fill volume) 0 cy length of spolwer 0 ft $1300 3000 width of spillway 0 ft (spRhwy stone tons) 0 tons $50.00 50.00 structures toe bavn user height 0 ft riser d�ameror 0 in 50.00 barrel length Oft base pleb or ldn 0 $200.00 $0.00 barrel m.rmror 0 in $0 00 barrel collars 0 5200 00 S0 00 baffle length 0 ft $50.00 $0 trepcieenout-b0reer ,w,.rrcan,,rips 824 cy $13.00 $8,112.00 reel 0 ea $150.00 $0.00 0 ee 55000 5000 seedlings 0 ea $500 $0.00 underdram(LF) o n $5,00 $000 biofilter soil ma(GV) 416 cy $3800 $15.808.00 bash reckl mu vortex devices .rwM�. 0 ft 51,500 00 So 00 mein, oed)LF) Y. 0 ft 550.00 $000 IIPrapnleered 8198ce or remit 1viMyir rlaptlf „„r,'�T.: 2 ft teapot 30 ft welch 5.0 (tons) 22.5 580.00 $135000 survey and layout(once per 0 1 to.) ad0M „ ;" 2.5 basins 1 51 750.00 mobm:evon $500.00 as-built drawings(per l.okty) ,Ar+�y^am� ..'g :' 1 as 52,000.00 52000.00 meronas eoong leer f.=n�ty) 1 0. $2.000.00 $2 000 00 compaceonro.0ng(Per d.m) atifISM,CUSEK. r 55,00000 $5,000.00 manufactured facd,hea(attach menWsc$lrees or contractor's price as s b.w) 50 00 wct win $82 270.00 prq mgmt $0 340.50 contingency $7 181.05 Total $78,780 1/12/2015