HomeMy WebLinkAboutWPO201400070 Bond Estimates Bond Estimate 2014-11-11Project Name: Faith Christian Center International -VSMP WPO201400070 WPO file number: WPO201400070 Stormwater Management Plan Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) 1 Two (2)-3 line: 48" DIA/60"DIA) detention facilities -estimate (labor & materials), per FCCI site contractor 1 LS $155,000.00 $155,000.00 [email: Dr. W. Frye, Pastor, FCCI -11/3/2014 10:16 AM] 2 Filterra unit - 6' × 4' (-ref Mfr. pricelist, Fri 11/7/2014 4:42 PM e-mail attachment [DG/Van Dine Plaza])7 EA $9,600.00 67,200.00 3 Filterra unit - 4' × 8' (-ref Mfr. pricelist, Fri 11/7/2014 4:42 PM e-mail attachment [DG/Van Dine Plaza])1 EA $10,300.00 10,300.00 4 Filterra unit - 6' × 8' (-ref Mfr. pricelist, Fri 11/7/2014 4:42 PM e-mail attachment [DG/Van Dine Plaza])1 EA $13,650.00 13,650.00 5 Filterra unit - 6' × 10' (-ref Mfr. pricelist, Fri 11/7/2014 4:42 PM e-mail attachment [DG/Van Dine Plaza])1 EA $17,100.00 17,100.00 6 Filterra installation: 30% of the price of Filterra units *1 LS 30% Material 32,475.00 7 drop inlet or grate (DI-3 INLETS -companion to Filterra units)10 EA $3,500.00 $35,000.00 8 pipe, rcp, cmp, HDPE, or RCP (15 to 48") -'C' and 'E' Line storm 15.0 in d 215 LF $35.00 $7,525.00 9 pipe, rcp, cmp, HDPE, or RCP (15 to 48") -'C' and 'E' Line storm 18.0 in d 85 LF $40.00 $3,400.00 10 pipe, rcp, cmp, HDPE, or RCP (15 to 48") -'C' and 'E' Line storm 24.0 in d 12 LF $50.00 $600.00 11 trees (Filterra: crepe myrtle)10 ea $150.00 $1,500.00 12 mobilization $500.00 13 as-built drawings (per facility)1 ea $2,000.00 $2,000.00 14 materials testing (per facility)0 ea $2,000.00 $0.00 15 compaction testing (per dam)0 ea $5,000.00 $0.00 * ref e-mail/spearate project -Collins Engineering, Briarwood -Wed 8/13/2014 12:33 PM cost sum $346,250.00 proj mgmt $51,937.50 contingency $39,818.75 11/11/14, JEA Total $438,010 11/10/2014 Project Name: Faith Christian Center International -VSMP WP0201400070 WPO file number: WP0201400070 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 stablization (PS, TS) 6.2 acres $5,000.00 $31,000.00 2 silt fence (SF) 700.0 ft $5.00 $3,500.00 3 safety fence (SAF) 0.0 ft $5.00 $0.00 4 diversion (DD, FD, RWD) 1080 ft $13.00 $14,040.00 5 temporary slope drain (TSD) pipe length 0 ft pipe diameter 15 in $35.00 $0.00 6 earthwork for trap /basin (sediment trap #1) 7 height of dam at toe 3.6 ft cut at high side 8 ft 8 height of fill at face 2 ft cut at face 5 ft 9 length of dam 136 ft length of cut 116 ft 10 top width 2.5 ft width of cut 4 ft 11 (area above transition 13 sf (area below transiti( 70 sf 12 (total width of dam) 7.2 ft (total width of cut) 30 ft 13 (height below transitio 1.6 ft (depth below transit 3 ft 14 (area below transition 3.2 sf (area above transiti, 36 sf 15 (total fill volume) 81.6 cy (total fill volume) 455.4 cy 16 length of spillway 14.5 ft (TOAL CY estimate 483 cy $13.00 $6,279.00 17 width of spillway 9.6 ft (spillway stone tons 8 tons $50.00 $400.00 18 structures for trap #1 NA 19 earthwork for trap /basin (sediment trap #2) 20 height of dam at toe 2.5 ft cut at high side 19 ft 21 height of fill at face 1.5 ft cut at face 6 ft 22 length of dam 118 ft length of cut 174 ft 23 top width 3 ft width of cut 10 ft 24 (area above transition 9 sf (area below transiti( 132 sf 25 (total width of dam) 5 ft (total width of cut) 60 ft 26 (height below transitic 1 ft (depth below transit 13 ft 27 (area below transition 1.5 sf (area above transiti, 221 sf 28 (total fill volume) 45.9 cy (total fill volume) 2274.9 cy 29 length of spillway 17 ft (TOAL CY estimate 2290 cy $13.00 $29,770.00 30 width of spillway 18 ft (spillway stone tons 17.6 tons $50.00 $880.00 31 structures for trap #2 NA 32 earthwork for trap /basin (sediment trap #3) 33 height of dam at toe 4 ft cut at high side 14.5 ft 34 height of fill at face 2 ft cut at face 5.5 ft 35 length of dam 124 ft length of cut 124 ft 36 top width 3 ft width of cut 8 ft 37 (area above transition 14 sf (area below transiti( 104.5 sf 38 (total width of dam) 8 ft (total width of cut) 48 ft 39 (height below transitic 2 ft (depth below transit 9 ft 40 (area below transition 4 sf (area above transiti, 135 sf 41 (total fill volume) 82.7 cy (total fill volume) 1099.9 cy 42 length of spillway 17 ft (TOAL CY estimate 1127 cy $13.00 $14,651.00 43 width of spillway 13 ft (spillway stone tons 12.7 tons $50.00 $635.00 44 structures for trap #3 NA 45 earthwork for = /basin (sediment trap #4) 46 height of dam at toe 2 ft cut at high side 10.5 ft 47 height of fill at face 2 ft cut at face 5.5 ft 48 length of dam 118 ft length of cut 174 ft 11/10/2014 Project Name: Faith Christian Center International -VSMP WP0201400070 WPO file number: WP0201400070 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 49 top width 3 ft width of cut 8 ft 50 (area above transition 14 sf (area below transitic 104.5 sf 51 (total width of dam) 4 ft (total width of cut) 40 ft 52 (height below transitic 0 ft (depth below transit 5 ft 53 (area below transition 0 sf (area above transiti, 75 sf 54 (total fill volume) 61.2 cy (total fill volume) 1156.8 cy 55 length of spillway 17 ft (TOAL CY estimate 1177 cy $13.00 $15,301.00 56 width of spillway 16 ft (spillway stone tons 15.6 tons $50.00 $780.00 57 structures for trap #4 NA 58 tree protection 0 ct. -50 -If material / tree 370 ft $5.00 $1,850.00 59 silt fence inlet protection (IP) 0 $100.00 $0.00 60 stone inlet protection (IP) 24 $200.00 $4,800.00 61 outlet protection (OP), see rip -rap, below length 0 ft width 0 ft 1 $0.00 $0.00 62 channel (SCC, matted) length 0 ft width 0 ft $0.00 63 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 $0.00 64 construction entrance (CE) 0 $2,000.00 $0.00 65 wash rack 1 $2,000.00 $2,000.00 66 paved construction entrance 1 $3,500.00 $3,500.00 67 level spreader -201f [total , 6" x 6" treated timbers [6" x 6" x 8' -Low 3 ea 3 ea $25.00 $75.00 68 level spreader - installation, inc misc. stone ('E' and 'F' storm lines 1 ea 1 ea $200.00 $200.00 69 rip -rap, placed depth 1 ft length 10.0 ft 70 Entrance culvert width 11.0 (tons) 6.325 tons $60.00 $379.50 71 rip -rap, placed depth 1 ft length 10.0 ft 72 A2 to Al width 8.8 (tons) 5.03125 tons $60.00 $301.88 73 rip -rap, placed depth 1 ft length 10.0 ft 74 B2 to B1 width 8.8 (tons) 5.03125 tons $60.00 $301.88 75 rip -rap, placed depth 1 ft length 10.0 ft 76 C2 to Cl width 11.0 (tons) 6.325 tons $60.00 $379.50 77 rip -rap, placed depth 1 ft length 10.0 ft 78 D2 to D1 width 11.0 (tons) 6.325 tons $60.00 $379.50 79 rip -rap, placed depth 1 ft length 10.0 ft 80 E2 to El width 9.5 (tons) 5.4625 tons $60.00 $327.75 81 rip -rap, placed depth 1 ft length 10.0 ft 82 F2 to Fl width 8.8 (tons) 5.03125 tons $60.00 $301.88 83 survey and layout (price per 0.1 mi.) acres 6.2 traps and basins 4 $5,100.00 84 mobilization $500.00 85 stream crossing (computed independently) $0.00 cost sum $137,632.88 proj mgmt $20,644.93 contingency $15,827.78 11/11/14, JEA Total $174,110 11/10/2014 Jnternal Use Only, Date Recelced:fi Fee L.l iky\d/iT Received by: Intake: Forward to Management Analyst ''•117-0:;;:r ‘_0(.1.7.D REQUEST TO ESTABLISH A BOND APPROVED PLAN# VSMP -WPO201400070 PROJECT NAME: Faith Christian Center International (As listed on the approved plan) All parcels in the project,including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. TAX MAPs/PARCELs: 78-47A OWNER'S NAME: Faith Christian Center International SIGNATURE: a] • 'VGA date: /101 dr ricer TAX MAPs/PARCELs: OWNER'S NAM . SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: NOTE: If ownership of the property is in the name of any type of legal entity or organization including,but not limited to the name of corporation,partnership,limited liability company, trust,association,etc.,documents acceptable to the County must be submitted certifying that the person signing above has the authority to do so. The requested estimates are; ❑ VESCP Erosion&Sediment Control per Water Protection Ordinance section 17-207;SO fee ® VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water Protection Ordinance section 17-208;5250 fee required ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435; &Water&Sewer per Subdivision Ordinance section 14-435;5250 fee required A bond estimate will be prepared by the plan reviewer.The estimate must be sent to the owner. Please provide contact information. EMAIL: pastor @fccintl.org OR REGULAR MAIL ADDRESS: Revised 6120/2014 ' i