HomeMy WebLinkAboutWPO201400077 Bond Estimates 2015-07-08 (3)Project Name: Rivanna Village Phase 1
WPO file number: WP0201400077
Erosion and Sediment Control Bond Estimate
Item Item
Number
stablization (PS, TS)
silt fence (SF)
safety fence (SAF)
diversion (DD, FD, RWD)
temporary slope drain (TSD)
earthwork for basin ASia & AS2a
structures for basin
earthwork for basin Me & BS2a
structures for basin
earthwork for basin CS1 & 2
structures for basin
pipe length
0 ft
pipe diameter
0 in
height of dam at toe
10 ft
cut at high side
12 ft
height of fill at face
6 ft
cut at face
4 ft
length of dam
100 ft
length of cut
140 ft
top width
a ft
width of cut
35 ft
(area above transition)
108 at
(area below transition
2 sf
(total width of dam)
20 ft
(total width of cut)
67 ft
(height below transition)
4 ft
(depth below transitioi
8 ft
(area below transition)
24 sf
(area above transition
204 sf
(total fill volume)
488.9 cy
(total fill volume)
1949.6 cy
length of spillway
0 ft
(TOAL CY estimate)
2113 cy
width of spillway
0 ft
(spillway stone tons)
0 tons
riser height
13 ft
riser diameter
36 in
(riser unit price)
$70.00
barrel length
110 ft
base plate or fdn
0
barrel diameter
24 in
(barrel unit price)
$50.00
barrel collars
0
baffle length
0 It
height of dam at toe
2 ft
cut at high side
8 It
height of fill at face
2 ft
cutatface
9.5 It
length of dam
40 ft
length of cut
80 ft
top width
6 ft
width of cut
35 ft
(area above transition)
20 sf
(area below transition
513 sf
(total width of dam)
4 ft
(total width of cut)
70 ft
(height below transition)
0 ft
(depth below transitioi
-1.5 ft
(area below transition)
0 sf
(area above transition
-54.75 sf
(total fill volume)
29.6 cy
(total fill volume)
1357.8 cy
length of spillway
, 0 ft
(TOAL CY estimate)
1368 cy
width of spillway
0 ft
( spillway stone tons)
0 tons
riser height
13 ft
riser diameter
36 in
(riser unit price)
$70.00
barrel length
440 ft
base plate or fdn
0
barrel diameter
15 in
(barrel unit price)
4;
barrel collars
0
baffle length
0 ft
height of dam at toe
4 ft
cut at high side
12 ft
height of fill at face
2 It
cut at face
10 ft
length of dam
120 It
length of cut
150 ft
top width
10 ft
width of cut
45 ft
(area above transition)
28 sf
(area below transir
sf
(total width of dam)
8 ft
(total width of cut)
89 ft
(height below transition)
2 ft
(depth below transitioi
2 ft
(area below transition)
4 sf
(area above transition
85 sf
(total fill volume)
142.2 cy
(total fill volume)
4083.3 cy
length of spillway
. 0 ft
(TOAL CY estimate)
4131 cy
width of spillway
0 ft
( spillway stone tons)
0 tons
riser height
6 ft
riser diameter
48 in
(riser unit price)
$150.00
No. Unit Unit Cost Cost
(installed)
33 acres $5,000.00 $165,000.00
8000 ft $5.00 $40,000.00
900 ft $5.00 $4,500.00
3300 ft $13.00 $42,900.00
$0.00 $0.00
$13.00 $27,469.00
$50.00 $0.00
$910.00
$200.00 $0
$5,500.00
$200.00 $0
$50.00 $0
$13.00 $17,784.00
$50.00 $0.00
$910.00
$200.00 $0
$15,400.00
$200.00 $0
$50.00 $0
$13.00 $53,703.00
$50.00 $0.00
$900.00
7/8/2015
Project Name: Rivanna Village Phase 1
WPO file number: WP0201400077
Erosion and Sediment Control Bond Estimate
Item Item
Number
earthwork for trap HS1
earthwork for trap ASi a -2
earthwork for trap ASi b
earthwork for trap BS1 b
earthwork for trap Est
barrel length 65 It
barrel diameter 30 in
height of dam at toe
5 ft
height of fill at face
5 ft
length of dam
80 ft
top width
3 It
(area above transition)
65 sf
(total width of dam)
10 ft
(height below transition)
0 ft
(area below transition)
0 sf
(total fill volume)
192.6 cy
length of spillway
14.5 ft
width of spillway
20 ft
height of dam at toe
5 ft
height of fill at face
4 ft
length of dam
150 ft
top width
3 ft
(area above transition)
44 sf
(total width of dam)
10 ft
(height below transition)
1 ft
(area below transition)
4 sf
(total fill volume)
7 cy
length of spillway
16 ft
width of spillway
20 ft
height of dam at toe
5 ft
height of fill at face
5 ft
length of dam
80 ft
top width
3 ft
(area above transition)
65 sf
(total width of dam)
10 ft
(height below transition)
0 ft
(area below transition)
0 sf
(total fill volume) _
192.6 cy
length of spillway
11 ft
width of spillway
30 ft
height of dam at toe
3 ft
height of fill at face
3 ft
length of dam
150 ft
top width
3 ft
(area above transition)
27 sf
(total width of dam)
6 ft
(height below transition)
0 ft
(area below transition)
0 s
(total fill volume)
150.0 cy
length of spillway
7 ft
width of spillway
30 ft
height of dam at toe
4 ft
height of fill at face
4 ft
length of dam
80 ft
top width
3 ft
(area above transition)
44 sf
base plate or fdn
0
(barrel unit price)
$65.00
barrel collars
0
baffle length
0 ft
cut at high side
6 ft
cutatface
0 ft
length of cut
45 ft
width of cut
20 ft
(area below transitions
0 sf
(total width of cut)
32 ft
(depth below transitioi
Eft
(area above transition
60 sf
(total fill volume)
100.0 cy
JOAL CY estimate)
226 cy
(spillway stone tons)
16.7 tons
cut at high side ft
cut at face
ft
length of cut
ft
width of cut
ft
(area below transition
0 sf
(total width of cut)
52 ft
(depth below transitioi
6 f
(area above transition
120 sf
(total fill volume)
577.8 cy
JOAL CY estimate)
667 cy
(spillway stone tons)
18.4 tons
cut at high side R
cut at face
ft
length of cut
45 ft
width of cut
10 ft
(area below transition
72 sf
(total width of cut)
38 ft
(depth below transitioi
6 f
(area above transition
78 sf
(total fill volume)
250.0 cy
JOAL CY estimate)
314 cy
(spillway stone tons)
19 tons
cut at high side I
8 ft
cutatface
2 ft
length of cut
120 ft
width of cut
20 ft
(area below transition
48 sf
(total width of cut)
40 R
(depth below transitioi
6 f
(area above transition
84 sf
(total fill volume)
586.7 cy
JOAL CY estimate)
637 cy
(spillway stone tons)
12.1 tons
cut at high side
12 ft
cutatface
'fift
length of cut
60 ft
width of cut
12 ft
(area below transition
80 sf
No. Unit Unit Cost
Cost
(installed)
$200.00
$0
$4,225.00
$200.00
$0
$50.00
$0
$13.00
$2,938.00
$50.00
$835.00
$13.00 $8,671.00
$50.00 $920.00
$13.00 $4,082.00
$50.00 $950.00
$13.00 $8,281.00
$50.00 $605.00
7/8/2015
Project Name: Rivanna Village Phase 1
WPO file number: WP0201400077
Erosion and Sediment Control Bond Estimate
Item Item
Number
earthwork for trap HS2a
silt fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP)
channel CS1a
channel CS1b
channel HS1
channel AS1 a -1
channel AS1 a -2
channel AS1 b
channel BS1a
channel BS11b
Channel ES1
construction entrance (CE)
wash rack
paved construction entrance
(total width of dam)
8 ft
(total width of cut)
44 ft
(height below transition)
0 ft
(depth below transitioi
8 ft
(area below transition)
0 sf
(area above transition
112 sf
(total fill volume)
1304 cy
(total fill volume)
426.7 cy
length of spillway r
11 ft
(TOAL CY estimate)
470 cy
width of spillway
30 ft
(spillway stone tons)
19 tons
height of dam at toe
5 ft
cut at high side
5 It
height of fill at face
5 ft
cutatface
0 It
length of dam
80 ft
length of cut
140 It
top width
14 It
width of cut
20 It
(area above transition)
120 sf
(area below transition
0 sf
(total width of dam)
10 ft
(total width of cut)
30 ft
(height below transition)
0 ft
(depth below transitioi
5 ft
(area below transition)
0 sf
(area above transition
50 sf
(total fill volume)
355.6 cy
(total fill volume)
2593 cy
length of spillway ,
18 ft
(TOAL CY estimate)
442 cy
width of spillway
50 ft
(spillway stone tons)
51.8 tons
length
0 ft
width
4 ft
length
500 ft
width
4 ft
length
300 ft
width
4 ft
length
440 ft
width
6 ft
length
450 ft
width
4 ft
length
375 ft
width
4 ft
length
130 ft
width
4 ft
length
270 ft
width
4 ft
length
490 ft
width
4 ft
length
440 ft
width
4 ft
rip -rap, placed depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
stream crossing (computed independently)
0 ft length 0 ft
0 (tons) 0 tons
33 traps and basins 9
No. Unit Unit Cost Cost
(installed)
$13.00 $6,110.00
$50.00 $950.00
$13.00 $5,746.00
$50.00 $2,590.00
go
$100.00
$0.00
0
$200.00
$0.00
0
$0.00
$0.00
1
$9,000.00
$9,000.00
1
$5,400.00
$5,400.00
1
$11,880.00
$11,880.00
1
$8,100.00
$8,100.00
1
$6,750.00
$6,750.00
1
$2,340.00
$2,340.00
1
$4,860.00
$4,860.00
1
$8,820.00
$8,820.00
1
$7,920.00
$7,920.00
1
$2,000.00
$2,000.00
3
$2,000.00
$6,000.00
2
$3,500.00
$7,000.00
$60.00 $0.00
7/8/2015
$21,000.00
$500.00
$0.00
cost sum
$523,449.00
proj mgmt
$78,517.35
contingency
$60,196.64
Total
$662,170
7/8/2015
Approximate Earthwork computations for sed
Assumes all cut and fill slopes are 2:1 for simplicty
.y
Height of Fill at Face I
h1
Cut at High Side
h2
transitic
w h1
Width of Cut Cut at Fa
Fill area above transition = h1(2h1) + h1(w)
Fill area below transition;
total width of fill (dam) = 2h1 + w + 2h2
height below transition = h2 -h1,
area = (width *height)12 - height x height
Length of Cut
liment traps and basins
Width
►n point Height of Dam at Toe
h2
ice
Volume = Length of Fill x Fill Area
Cut Areas and Volume is the same as fill
but using the cut dimensions
Fill for Dam
(imately)