HomeMy WebLinkAboutWPO201400077 Bond Estimates 2015-07-08Project Name: Rivanna VillagePhase 1 WPO file number: wpo201400077 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48 ") 0.0 in d 0 ES -1,2 0 EC -1 100.0 ft $0.00 $0.00 aggregate base or drainage stone 15.0 in d 75.0 ft L 35.0 ft W 229.7 ton $35.00 $8,039.06 earthwork for trap /basin height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transition 0 sf (area below transition 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transit 0 ft (depth below transitio 0 ft (area below transition) 0 sf (area above transitior 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway 0 ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn 0 $200.00 $0 barrel diameter 0 in (barrel unit price) $0.00 $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 trees 29 ea $150.00 $4,350.00 shrubs 192 ea $50.00 $9,600.00 seedlings 2606 ea $5.00 $13,030.00 underdrain(LF) 2940 ft $5.00 $14,700.00 biofilter soil mix (CY) 2730 cy $38.00 $103,740.00 trash rack/ anti vortex devices 2 ft $1,500.00 $3,000.00 maintenance access road (LF) 0 ft $50.00 $0.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 33 basins 5 $19,000.00 mobilization $500.00 as -built drawings (per facility) 10 as $2,000.00 $20,000.00 materials testing (per facility) 10 as $2,000.00 $20,000.00 compaction testing (per dam) 5 as $5,000.00 $25,000.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 SUM cost sum $240,959.06 proj $36,143.86 7/8/2015 Project Name: Rivanna VillagePhase 1 WPO file number: wpo201400077 Stormwater Management Plan Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) contingency $27,710.29 Total $304,820 7/8/2015