Loading...
HomeMy WebLinkAboutWPO201500021 Review Comments WPO VSMP 2015-07-14John Anderson From: John Anderson Sent: Tuesday, July 14, 2015 5:26 PM To: 'brian.mcpeters @kimley - horn.com'; Frank Pohl Subject: RE: Planning Application Review for WP0201500021 Crozet Avenue North Sidewalk Project. Attachments: WPO_VSMP_Virginia_Stormwater_ Management _Program_Application.pdf Brian, SWM Plan -1 item required for VSMP/WPO Approval. Engineering can approve VSMP /WPO Application, provided: ( "The pollutant removal requirement of 0.33 lb /yr will be purchased from a nutrient bank. ") E Domwealat n of �bt .tppbl &W% Acqutttliun qUatilnew cleikty "I be V1 n so Or? V$,My mollop in, 1(14 the DgPWMM [ M.2 cat:Ficetu►n fM)U 1IM ctr4d prcr,xm d+an"11eulutg the tUMItai aV14asphams nurimit cAvdltl AC41INFe+i +md 1he:i%EAk i- _d rimoofnhrrofev uaa•TMI11 trteh?%al 1be [78dH-TM_ -MIMg tnurr Lut11 lilt tffCMtt flare 9tr:20alwit '. t- tnb1i --hseeg Applltiabou itrp lu i1ccv2 ,t411ceRsdl § J. ;-1e 19� #:. steer la edo tm-t.I uics al tail ;V). Ow Depu=1mit I v.-MI= q►1s101. a ;a incrawtu fe+e eqtra1 ro $.m P=4Cslr of the shm"U i< p3u4 V- eht appltc rua lfar xhr es edtis Suet tee shall be .tep4' Test wo the Vatoun Sr.�nuwm r MaaAff hhu±at Find MAUL W ION' � i 1 -41 ' S -'3 SWPPP (4 items, 5t1i item/favor). Engineering can approve VSMP/WPO Application for this project, provided: 1. By p. 17 of SWPPP, Index of Appendices, please provide SWPPP Certification Statement nearly identical with signature certification on VPDES Permit Registration Statement (see p. 22/122 p. SWPPP) — provide SWPPP Certification identical with: 4, Certification, Arty person signing a document under Part Ili K I of 2 shall make the fallowing Certification. "I certify under penalty of law that 1 have read and understand this dDwfnerlt and that This document and all attachments were prepared m accordance with a system designed to assure that qualified personnel prope(ly galtlenW and evaluated the information submitted. Based on my inquiry of the pori5on or persons who manage the system, or those persons directly raspunsible for gathering the information, the information suit rnitW iS, to the test of my hn"Iedge Ond belief, true, accurate, and complete_ I am aware that there ere Signifi nt pen$Ities for submtiting false Information. Ind uding tine passibility of Fine and imprisvnment for knowing vilolation¢." 2. Frank, please sign/date Registration Statement/General VPDES Permit —p 22/122. 3. Pg. 2 — Permit Fee Form should not be sent to DEQ, Receipts Control, Richmond, VA. Instead, please send WPO Application to: Community Development, Attn. Todd Shifflett; 401 McIntire Rd, Charlottesville, VA 22902- 4596. Albemarle County is a Local VSMP Authority. 4. Remove p. 25 — instead use Attached (Local VSMP Authority) WPO Application. Check (p. -1 block) revision or resubmission for review. 5. As a favor, please discuss last 2 -p. in context of site, stream, or design. Where is 50' irregular section? Pipe? What does Pavlovskii's Method show? Velocity = Infinity (? - Explanation not required for Approval —Very basic /just curious). Ci1F Output Data Lfps"am Depll+ 0.40 It Profile Descdpticn Profile Headlong 0.00 It Downstream Velocity Infinity itrs Upgiream Velocity Infinity [us Normal Depth 1.57 It Critical Depth 1,85 It Channel SlaW D_04500 Mt r,l,cat Staoe D,01898 W1 Thanks, Brian 434.296 -5832 —x3069 From: brian.mcpeters @kimley- horn.com [mailto:brian.mcpeters @kimley- horn.com] Sent: Wednesday, July 08, 2015 9:01 AM To: John Anderson; Frank Pohl Cc: matt.harrell @kimley- horn.com Subject: RE: Planning Application Review for WP0201500021 Crozet Avenue North Sidewalk Project. Importance: High ShareFile Attachments Title Size CrozetNorth_SWPPP.pdf 8.3 MB W P0201500021 _Crozet- Ave- N_Sidewal k_050515. pdf 457.7 KB Download Brian McPeters uses ShareFile to share documents securely. Attachments Learn More. John, Please see the revised SWP3 for the above WPO application. Please let me know, if we've adequately addressed your comments. We anticipate the Contractor needing to pull a Land Disturbance Permit in late August, so your review would be much appreciated! Feel free to call me to discuss. Thanks, 4 Brian A. McPeters, PE Kimley -Horn 11700 Willow Lawn Drive, Suite 200, Richmond, VA 23230 Direct: 804 - 672 -4721 1 Mobile: 804 - 539 -1032 Connect with us: Twitter I Linkedln I Facebook I Celebrating eight years as one of FORTUNE'S 100 Best Companies to Work For From: John Anderson [mailto:janderson2 @albemarle.org] Sent: Tuesday, May 05, 2015 12:18 PM To: McPeters, Brian; Frank Pohl Subject: Planning Application Review for WP0201500021 Crozet Avenue North Sidewalk Project. The Review for the following application has been completed: Application Number = WP0201500021 Reviewer = John Anderson Review Status = Denied Completed Date = 05/05/2015 Thanks for your patience. Comments available, CV system. 434.296 -5832 —x3069 YlAGIl`11A County of Albemarle Department of Community Development VSMP Permit plan review Project: Crozet Ave North Sidewalk Project Plan preparer: Brian A. McPeters, P.E., Kimley -Horn / 1700 Willow Lawn Drive, Suite 200, Richmond, VA 23230 — brian.mcpeters(&kimley- hom.com Owner or rep.: Frank Pohl, Office of Facilities Development, Albemarle County 401 McIntire Rd/Room 228, Charlottesville, VA 22902 — fpohlkalbemarle.org Plan received date: 3 Apr 2015 Date of comments: 5 May 2015 Reviewer: John Anderson Comments are MINOR in nature —may submit .PDF /s for preview /conditional approval. Please do not revise hard copy SWPPP (inserts /exhibit) prior to .PDF (follow -up) review of inserts /exhibit —this may save time. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Albemarle County must sign/date Registration Statement (ACCD/Engineering will coordinate). 2. Provide SWPPP Certification statement (VAR10, Part III, K.4.): 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." 3. SWPPP is comprehensive. However, please update insert sheets to reflect revisions per ESC plan comments, Sec. C. below. 4. CE -101 or CE -102 —Show initial locations of. sanitary /porta john; concrete wash -out draining to pit/area with impermeable lining; vehicle wash draining to sediment trap /equivalent; on -site fuel storage /re- fueling areas with containment (if proposed); non - hazardous solid waste dumpster (if provided); covered /protected paint - solvent storage (if present). Note: these PPP facility locations are required to be shown on SWPPP exhibit, not full -size ESC plans. These locations may change as needed (if revise locations, show via pencil edits to on -site SWPPP exhibit). 5. Future Reference (or additional sidewalk projects: State Farm Blvd; Barracks Rd; Hydraulic Rd), please: a. Number pages of document for ease of reference. b. Runoff coefficients (Rational or Modified Rational Method) are not used for compliance. Use NRCS /TR -55 /curve numbers instead. —ref 9VAC25- 870 -72 (24 -hr storm/NOAA Atlas 14). Engineering Review Comments Page 2 of 4 B. VSMP: SWPPP: Stormwater Management Plan (WP0201500021) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for reasons provided in comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. Drainage and ESC Narrative for: Crozet Avenue North Sidewalk Improvements Project (REPORT), 27- Mar -15, Water Quality Sec. explains: "The pollutant removal requirement of 0.33 lb /yr will be purchased from a nutrient bank." Two items: a. Ref. 9VAC25- 870 - 69/62.1- 44.15:35 — Documentation of acquisition of credits required. (https:Hlegl.state.va.us /c ip bin/legp504.exe ?000 +cod +62.1- 44.15C35). E- Documentation of the applicant's acquisition of nutrient credits shall be provided to the VSNP authority and the Department in a certification from the credit provider dornmenting the number of phosphorus nutrient credits acquired and the associated ratio of nitrogen nutrient credits at the credit- generating entit},. Until the effective date of regulations establishing application fees in accordance vath § 62.1 - 44.19:20, the credit provider shall pay the Department a tinter quality enhancement fee equal to six percent of the amount paid by the applicant for the credits - Such fee shall be deposited into the Virginia Storrnwater Management Fund established by § 62.1 -44.15:29 - b. Report TOC indicates Appendix D contains Water Quality Calcs. Appendix D lists data. Provide calculations (VSMH11999 Vol. II, Appendix 5D Worksheets /situation 3). 2. Report/MS -19 Compliance — Provide pre- /post - development Qto values /calculations. C. VSMP: SWPPP: Erosion Control Plan (WP0201500021) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons provided in comments below. The erosion control plan content requirements can be found in County Code section 17 -402. 1. Please remove the following sheets from ESC/VSM Plans (site, road, traffic): CA -002A, CR -102, CT -101, CT -102, CT -500, CT -501, CT -502, X01, X02, X03. 2. CA -004: Revise uppermost Crozet Ave detail label to read Sta. 10 +00 to Sta. 15 +65.28. 3. CA -004: Please clarify if symbols 7 and 8 relate to sidewalk. Also, furnish a more descriptive Sidewalk Detail. 4. CA -004 —If Inset B is for sidewalk, symbols 10 and 11 are undefined (should these read 7 and 8 ?). For clarity, please provide a more readily readable sidewalk detail; for example: W = 5 fl desirable 7 in_ min. next to roll tap curb r 4 in. min. elsewhere votty Space 3 a min 6 It min w Irk Plant line, g florin I I I " II the utility spaoe Is paved, constructlon shall be on compacted subgrade and the thickness shall match that of the sidewalk, however, the area wl II not be considered part of the minimum width required for sidewalk. It trees are planted in paved pedestrian areas, they shall be planted in tree wells that include a planting grate, approved by the resident engineer. However. the width of sidewalk passing the tree well shall be at least 3 feet in width. FIGURE B — DETAIL BACK OF CURBS Link: htt p : / /www.viriziniadot.oriz/business /resources /gpl2endb.pdf Engineering Review Comments Page 3 of 4 5. CE -101 — Include General construction notes for Erosion and Sediment Control Plans (1. -20.); link: http:/ /www.albemarle.orgLupload/images /forms center/ departments /Communiiy Development/for ms/En ing eeringtand WPO Forms /En ing eerina Plan Review General Notes Feb20l4.pdf. 6. CE -101 —Add Note: Leave a gap in CIP woven fabric for stream to pass. 7. CE -101 — Revise Legend and Erosion Details to include paved construction entrance (PCE). 8. CE -101 —Show elevation (contours) at construction entrance /CE. Extend contours beyond ESC measures, to aid plan review. 9. CE -101 — Contour elevation labels are unreadable. Add readable labels. 10. CE -102 — Revise per CE -101 comments, as necessary. 11. CE -501 — Revise Paved Wash Rack detail, so readable (Attached detail). 12. CE -501 — Management Strategies and Sequence of EC Measures/Note 13: Revise consistent with Note 10, CE -102 (County ESC inspector concurrence required). 13. CE -501 — Management Strategies and Sequence of EC Measures/Note 11: Recommend revise reference to periodic inspections to be consistent with inspection frequency in VAR10 /SWPPP. 14. CG -100 — Future reference: runoff coefficients used with Rational Method are not used with TR- 55/NRCS. —Also, comment #A.4.b., above. In the future, use CN, not "c." 15. CG -201 —If 18" RCP label is unintentional, remove. Meaning is unclear. —Also, next comment. 16. CG-202/CR- 10 1 (Sta. 19 +50 - 21 +00±) — Drawings present dissimilar information. Clarify (across plan sheets) what is existing, proposed, or to be abandoned/removed. —ref images: _dab w 400 i i - - — ! W __ — - -- 4F - EXIST. R/w apt_ REMOVE STUB g / 1 TO BE �E, NED OUT 1S' CMP rX 17. CR -100 —Label radius of curb, Crozet Ave. North/St. George Ave (SR 810/1202). 18. CR -101 —Add (triangle) symbol 9 to Legend. 19. CR -101 —Add Note: Exist. 4' Conc. Sidewalk to be demolished (unless existing sidewalk remains). 20. CR -101 — Provide (profile view) detail showing how 101 -5 (DI -4A) connects with 15" line, 18" line, and 48" HDPE. 21. CR -101 — Revise schematic, Sta. 19 +50 — Str. 101 -1, consistent with CG -202. Comment #16, above. 22. CR -101A — Identify existing structure, Sta. 20 +29.62. Label pipe type, diameter, and INV elev. 23. CR- 101A/All structures —Label pipe Material /type, L, DIA, INV elev. (in/out). Reference to plan Engineering Review Comments Page 4 of 4 sheet is insufficient. 24. CR- 101A —Str. 101 -3A and 101 -7: Provide MH rim elevations. 25. CR -10113 — Insufficient data: Please provide slope, L, DIA, material, INV labels (48" HDPE). Provide equivalent labels for existing structure beneath Crozet Ave. N. 26. CR -101B —Two proposed grade labels are confusing. If one is existing grade, please revise label. 27. CR -101B — Provide Std. VDOT EW at existing pipe outfall. There will never be a better time. 28. CR -500 — Ensure all details print clearly. Ensure all table values /dimensions are readable. 29. CR -501 — Several details are unreadable. Ensure readable. Also, prior comment. 30. May have encountered reference to off -site waste area during initial review, but cannot locate reference. If an off -site waste area proposed, ensure off -site area has an approved ESC plan. The VSMP permit application and all plans may be resubmitted for rp eview (as .PDFs). When all comments have been satisfactorily addressed, and if there are no additional comments, please provide 2 copies of the plans, 1 copy of SWPPP. Encourage .PDF submittals that show revisions. Engineering plan review staff is available 2 -4 PM on Thursdays, should you require a meeting to discuss this review. Plan reviewer is available at 434.296 -5832 -0069 should you have any questions. Process: After approval, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to request a pre - construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htt2://www.albemarle.org/deptforms.asp?departrnent--cdengmMo Contact John Anderson, Engineering Dept, if any questions. janderson2(a)a1bemarle.org / 434 - 296 -5832 x3069 Thank you. File: WP0201500021 Crozet -Ave -N Sidewalk 050515