HomeMy WebLinkAboutWPO201500001 Review Comments Erosion Control Plan 2015-07-15�pF A
vt�r�1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project title:
Project file number:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewers:
VSMP Permit plan review
Northside Drive Stockpile
WP0201500001
Shimp Engineering [Justin @shimp - engineering.com]
HALL, LARRY B [brent @greenstonematerial.com]
22 June 2015
15 July 2015
Max Greene
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17 -401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. A SWPPP is required for all commercial grading projects over 10,000 sq. of disturbance. Please use
the Albemarle County SWPPP template to facilitate the approval process for the proposed plan.
http:// www. albemarle. org/upload/ima,ges /forms_center /departments /Community Development /forms/
Engineering and _ WPO_Forms /Stormwater_ Pollution _ Prevention _ Plan_ SWPPP_template.docx
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17 -404.
1. A PPP is required and is part #6 of the Albemarle County SWPPP. (See link above)
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17 -403.
1. Please submit "tab A" and "summery tab" from VRRM spread sheet.
2. Detailed "to scale" plan is required for SWM structure.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17 -402.
Engineering Review Comments
Page 2 of 3
1. Aerial photography appears to show a parking lot and possible wall. Please show and label all
existing structures and impervious areas on this project.
2. Paved construction entrance detail is required for plan approval. The stone construction entrance
can be discussed at the pre - construction meeting.
3. Plan appears to show partial information for both a sediment trap and a basin with riser. Please
clear up the plan view prior to resubmittal.
4. Culvert Inlet Protections with a drainage area of 1 to 3 acres are to be designed as a sediment trap.
5. Cleanwater diversions need to be stabilized to prevent erosion. Please show and describe how
(CW) diversion will be made non - erodible. (CIP appears to be the energy dissipater for the
CWD.)
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re- submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference.
Applicants will need to complete the request for a pre - construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptforms.asp?departtnent=cdengmTo
Engineering Review Comments
Page 3 of 3
File: E1_vsmp_ review _projectname.doc